Michael J. Garvin
Research Subjects
Michael J. Garvin has a total of 50 co-authors. Here are the top co-authors by number of shared publications:
- Edwin E. González
Graduate Research Assistant, Via Dept. of Civil and Environmental Engineering, Virginia Tech, Patton Hall, Room 121, 750 Drillfield Dr., Blacksburg, VA 24061
3 shared publications - Annie R. Pearce
Virginia Tech
2 shared publications - Carrie Sturts Dossick
University of Washington
2 shared publications - Jose Guevara
University of Los Andes, Colombia
2 shared publications - Martha E. Gross
Ph.D. Candidate, Myers-Lawson School of Construction, Virginia Tech, 200 Patton Hall, Blacksburg, VA 24061
2 shared publications - Abraham A. Palmer
Department of Psychiatry, University of California San Diego
1 shared publication
Latest Publications
- 1 January 2027
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 43 (1)
Progressive Public–Private Partnerships: Evidence from Two Case Studies on Convergence and Divergence in Collaborative Development
Progressive public–private partnerships (P3s) have emerged as alternatives to fixed-price P3 models in response to concerns about excessive risk transfer and the challenges of delivering complex transportation projects. Through a predevelopment agreement (PDA), progressive P3s introduce the development entity earlier, enabling collaborative scope refinement, iterative risk allocation, and a clearer pricing basis before committing to a long-term agreement. This study investigates progressive P3s through comparative case analysis of the Pennsylvania DOT (PennDOT) Major Bridge P3 Project (MBP3) and Maryland DOT’s Op Lanes Maryland Project, two initiatives that followed contrasting development trajectories. Using an exploratory case study design structured around four analytical dimensions and one inductively derived dimension—owner readiness and project preparation—the analysis examines how progressive P3 structures shape collaborative development and the conditions under which projects converge toward implementation or diverge during development. The MBP3 case illustrates how deliberate predevelopment program design, including an availability-payment structure and scope configured for adaptive delivery, created conditions for convergence despite significant institutional setbacks, although advancement was partial, with three of nine candidate bridges not advancing under the program. The Op Lanes case illustrates how unresolved institutional dependencies and a financial structure lacking adaptive capacity created conditions that collaborative development could not overcome, ultimately leading to orderly termination of the PDA. The comparison indicates that development-phase outcomes depend substantially on conditions established before collaborative development begins, that unresolved third-party dependencies become shared challenges for public agencies and developers once the PDA is executed because both parties are invested in advancing the project, and that governance in progressive P3s depends not only on contractual design but also on the public agency’s capacity to manage collaborative development. Five propositions are derived to guide future empirical research on collaborative development processes and outcomes in progressive P3s.
- 1 January 2027
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 43 (1)
Progressive Public–Private Partnerships: Evidence from Two Case Studies on Convergence and Divergence in Collaborative Development
Progressive public–private partnerships (P3s) have emerged as alternatives to fixed-price P3 models in response to concerns about excessive risk transfer and the challenges of delivering complex transportation projects. Through a predevelopment agreement (PDA), progressive P3s introduce the development entity earlier, enabling collaborative scope refinement, iterative risk allocation, and a clearer pricing basis before committing to a long-term agreement. This study investigates progressive P3s through comparative case analysis of the Pennsylvania DOT (PennDOT) Major Bridge P3 Project (MBP3) and Maryland DOT’s Op Lanes Maryland Project, two initiatives that followed contrasting development trajectories. Using an exploratory case study design structured around four analytical dimensions and one inductively derived dimension—owner readiness and project preparation—the analysis examines how progressive P3 structures shape collaborative development and the conditions under which projects converge toward implementation or diverge during development. The MBP3 case illustrates how deliberate predevelopment program design, including an availability-payment structure and scope configured for adaptive delivery, created conditions for convergence despite significant institutional setbacks, although advancement was partial, with three of nine candidate bridges not advancing under the program. The Op Lanes case illustrates how unresolved institutional dependencies and a financial structure lacking adaptive capacity created conditions that collaborative development could not overcome, ultimately leading to orderly termination of the PDA. The comparison indicates that development-phase outcomes depend substantially on conditions established before collaborative development begins, that unresolved third-party dependencies become shared challenges for public agencies and developers once the PDA is executed because both parties are invested in advancing the project, and that governance in progressive P3s depends not only on contractual design but also on the public agency’s capacity to manage collaborative development. Five propositions are derived to guide future empirical research on collaborative development processes and outcomes in progressive P3s.
- 1 June 2024
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 150 (6) , 04024040
Exploring Farmers’ Willingness to Engage in Participatory Irrigation Infrastructure Programs: Evidence from a Water-Stressed Region
Climate change is increasingly exacerbating water shortages worldwide. Among the various repercussions of water scarcity, notably in developing countries, the most critical are the decline ...
- 1 June 2024
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 150 (6) , 04024040
Exploring Farmers’ Willingness to Engage in Participatory Irrigation Infrastructure Programs: Evidence from a Water-Stressed Region
Climate change is increasingly exacerbating water shortages worldwide. Among the various repercussions of water scarcity, notably in developing countries, the most critical are the decline ...
- 28 November 2023
- Published by Springer Nature
- p. 117-136
Contractual Governance in Public–Private Partnerships in the USA: Key Clauses and Impacts of COVID-19
- 28 November 2023
- Published by Springer Nature
- p. 117-136
Contractual Governance in Public–Private Partnerships in the USA: Key Clauses and Impacts of COVID-19
- 23 September 2022
- Published by Elsevier in European Neuropsychopharmacology
- Vol. 63, e234
T121. MULTI-OMIC NETWORK ANALYSIS IDENTIFIES KEY NEUROBIOLOGICAL PATHWAYS IN OPIOID ADDICTION
- 23 September 2022
- Published by Elsevier in European Neuropsychopharmacology
- Vol. 63, e234
T121. MULTI-OMIC NETWORK ANALYSIS IDENTIFIES KEY NEUROBIOLOGICAL PATHWAYS IN OPIOID ADDICTION
- 1 September 2022
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 38 (5) , 04022045
Review of Critical Success Factors and Key Performance Indicators in Performance Assessment of P3 Transportation Projects
What is a successful public–private partnership (P3)? The existing literature has continued to explore critical success factors (CSFs), key performance indicators (KPIs), and P3 drivers that are linked to P3 performance and outcomes, but some fundamental variations remain in the use of such factors and metrics to assess P3s. Studies have characterized CSFs as the “ingredients” necessary for P3 success and KPIs as the “metrics” to evaluate P3 outcomes or performance. As work in the area has progressed, the literature has evolved to consider CSFs and KPIs more holistically by broadening the factors considered to encompass social, political, economic, and financial categories. These areas in the literature are rather distinct, yet CSFs and KPIs sometimes serve as substitutes for one another, because the definition of and classification between CSFs and KPIs lack clarity. To address this issue, this work characterizes and synthesizes the literature on CSFs and KPIs to identify how to employ these factors and metrics to assess various aspects of P3 performance in transportation projects. CSFs identified were grouped into six categories such as project planning and environment and lifecycle perspectives, while KPIs were combined into four categories such as project delivery and socioeconomic. This work updates prior literature reviews, which is an important contribution because papers addressing CSFs and KPIs in P3s have increased in the last several years. Additionally, the distinction between CSFs and KPIs is clarified, and knowledge gaps such as the relationships between CSFs and future areas of research are presented.
- 1 September 2022
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 38 (5) , 04022045
Review of Critical Success Factors and Key Performance Indicators in Performance Assessment of P3 Transportation Projects
What is a successful public–private partnership (P3)? The existing literature has continued to explore critical success factors (CSFs), key performance indicators (KPIs), and P3 drivers that are linked to P3 performance and outcomes, but some fundamental variations remain in the use of such factors and metrics to assess P3s. Studies have characterized CSFs as the “ingredients” necessary for P3 success and KPIs as the “metrics” to evaluate P3 outcomes or performance. As work in the area has progressed, the literature has evolved to consider CSFs and KPIs more holistically by broadening the factors considered to encompass social, political, economic, and financial categories. These areas in the literature are rather distinct, yet CSFs and KPIs sometimes serve as substitutes for one another, because the definition of and classification between CSFs and KPIs lack clarity. To address this issue, this work characterizes and synthesizes the literature on CSFs and KPIs to identify how to employ these factors and metrics to assess various aspects of P3 performance in transportation projects. CSFs identified were grouped into six categories such as project planning and environment and lifecycle perspectives, while KPIs were combined into four categories such as project delivery and socioeconomic. This work updates prior literature reviews, which is an important contribution because papers addressing CSFs and KPIs in P3s have increased in the last several years. Additionally, the distinction between CSFs and KPIs is clarified, and knowledge gaps such as the relationships between CSFs and future areas of research are presented.
- 31 July 2022
- Published by Springer Nature
- p. 245-268
Case Studies of Financially Distressed Highway Public-Private Partnerships in the United States
- 31 July 2022
- Published by Springer Nature
- p. 245-268
Case Studies of Financially Distressed Highway Public-Private Partnerships in the United States
- 19 October 2019
- Published by Springer Nature
- p. 65-88
Case Studies of Financially Distressed Highway Public–Private Partnerships in the United States
- 19 October 2019
- Published by Springer Nature
- p. 65-88
Case Studies of Financially Distressed Highway Public–Private Partnerships in the United States
- 5 June 2019
- Published by Taylor & Francis in Construction Management and Economics
- Vol. 38 (4) , 383-397
Responsive governance in PPP projects to manage uncertainty
Despite the awareness that uncertainty impacts projects with long time horizons, public-private partnership (PPP) research has not extensively examined the operations phase of such projects where interactions between public and private counterparties will be frequent and long-term while subject to a changing environment. Accordingly, two distinct but related investigations examining how governance strategies can address uncertainty in PPP projects are presented. The first identified contractual mechanisms for risk sharing formed during the shaping phase of a broad set of PPP projects; a majority of these mechanisms were strategically designed to address risks as they unfold so counterparty project managers can rely on current information and circumstances during risk resolution. The second explored the emergence of relational mechanisms over time, which revealed that project managers had to consistently adjust established relational approaches to respond to unforeseen events in PPPs. The findings of both studies illustrate the necessity for responsiveness and complementarity of contractual and relational mechanisms in PPPs. Further, the mechanisms uncovered demand project management agility and flexibility as well as improved relational strategies, which is aligned with the emphasis on learning and adaptation in the broader, contemporary project management literature. Consequently, principles from project management 2.0 such as empowering competent project managers and shared global awareness are likely to enhance responsive PPP governance and warrant further exploration.
- 5 June 2019
- Published by Taylor & Francis in Construction Management and Economics
- Vol. 38 (4) , 383-397
Responsive governance in PPP projects to manage uncertainty
Despite the awareness that uncertainty impacts projects with long time horizons, public-private partnership (PPP) research has not extensively examined the operations phase of such projects where interactions between public and private counterparties will be frequent and long-term while subject to a changing environment. Accordingly, two distinct but related investigations examining how governance strategies can address uncertainty in PPP projects are presented. The first identified contractual mechanisms for risk sharing formed during the shaping phase of a broad set of PPP projects; a majority of these mechanisms were strategically designed to address risks as they unfold so counterparty project managers can rely on current information and circumstances during risk resolution. The second explored the emergence of relational mechanisms over time, which revealed that project managers had to consistently adjust established relational approaches to respond to unforeseen events in PPPs. The findings of both studies illustrate the necessity for responsiveness and complementarity of contractual and relational mechanisms in PPPs. Further, the mechanisms uncovered demand project management agility and flexibility as well as improved relational strategies, which is aligned with the emphasis on learning and adaptation in the broader, contemporary project management literature. Consequently, principles from project management 2.0 such as empowering competent project managers and shared global awareness are likely to enhance responsive PPP governance and warrant further exploration.
- 1 September 2018
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 34 (5)
Influence of Interorganizational Coordination on Lifecycle Design Decision Making: Comparative Case Study of Public–Private Partnership Highway Projects
Organizational structures in public-private partnerships (P3s) have the potential to decrease fragmentation and increase collaboration between key project-team stakeholders across the lifecycle phases of a project. These outcomes, in turn, also enhance the realization of an improved lifecycle design. In this exploratory study, the interorganizational coordination of three recent U.S. P3s was analyzed and the influences of the coordination on the lifecycle design decision-making processes were compared. For each of the three P3 projects, the authors conducted interviews with key project team members and collected project documentation, and these data were then analyzed to explore lifecycle design decision-making processes for each project. The empirical findings show how interorganizational coordination mechanisms influence the lifecycle design decision-making processes in P3s. The findings also show the ways that the coordination mechanisms resulted in improved or inhibited lifecycle design decision-making according to differences in the intended and actual implementation. As coordination mechanisms diminished, particularly iterative and over-the-shoulder design processes, lifecycle design effectiveness decreased. Conversely, effective implementation of key coordination mechanisms, such as a single point of contact and over-the-shoulder design reviews by downstream team members, improved lifecycle design processes. Ultimately, this study extends the growing body of knowledge for understanding the influence of P3 organizational structures.
- 1 September 2018
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 34 (5)
Influence of Interorganizational Coordination on Lifecycle Design Decision Making: Comparative Case Study of Public–Private Partnership Highway Projects
Organizational structures in public-private partnerships (P3s) have the potential to decrease fragmentation and increase collaboration between key project-team stakeholders across the lifecycle phases of a project. These outcomes, in turn, also enhance the realization of an improved lifecycle design. In this exploratory study, the interorganizational coordination of three recent U.S. P3s was analyzed and the influences of the coordination on the lifecycle design decision-making processes were compared. For each of the three P3 projects, the authors conducted interviews with key project team members and collected project documentation, and these data were then analyzed to explore lifecycle design decision-making processes for each project. The empirical findings show how interorganizational coordination mechanisms influence the lifecycle design decision-making processes in P3s. The findings also show the ways that the coordination mechanisms resulted in improved or inhibited lifecycle design decision-making according to differences in the intended and actual implementation. As coordination mechanisms diminished, particularly iterative and over-the-shoulder design processes, lifecycle design effectiveness decreased. Conversely, effective implementation of key coordination mechanisms, such as a single point of contact and over-the-shoulder design reviews by downstream team members, improved lifecycle design processes. Ultimately, this study extends the growing body of knowledge for understanding the influence of P3 organizational structures.