SHSeokyon Hwang

Seokyon Hwang

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Seokyon Hwang has a total of 1 co-authors. Here are the top co-authors by number of shared publications:

  • Liang. Y. Liu

    Graduate Research Assistant, Department of Civil and Environmental Engineering, University of Illinois at Urbana-Champaign, 205 N. Mathews Ave., Urbana, IL 61801

    2 shared publications

Latest Publications

  • Modeling Excavation Process Using Dynamic Modeling Approach

    by Seokyon Hwang, Liang Y. Liu

    The dynamics of the excavation process affect the performance of resources involved in the operations. This is significant for the reasons: (1) most of excavation work requires costly resources such as excavators and trucks; (2) the overall performance of the process depends on the performance of such resources; and (3) there are intricate interdependencies among resources. In order to incorporate analysis of such dynamics in managing excavation operations, an approach based on dynamic process modeling and simulation is presented. This approach provides critical operational information for effective planning and control of the process, including the progress and corresponding schedule of the overall process and the efficiency of individual resources over time and at the completion that can be used to find a balanced combination of resources. To demonstrate the usefulness of the proposed approach focusing on excavation in building construction an application example is presented.


  • Proactive Project Control Using Productivity Data and Time Series Analysis

    by Seokyon Hwang, Liang. Y. Liu

    Managing construction projects requires constant monitoring of project performance and follow-up schedule updates. With updated project performance data, project managers can take corrective actions in a timely manner, thereby mitigating any negative impacts on both the cost and schedule of a project. Among project performance data, productivity data from the field plays a key role in evaluating and predicting project performance in terms of cost and schedule. Despite its importance, most contractors do not take full advantage of the benefits of analyzing productivity data and proactively control a project. Although computerized systems are commonly used in the construction industry today, few project managers make full use of on-site productivity data to accurately predict future project performance. As a result, schedule delays and cost overruns are detected at a much later stage than they should be, causing costly fixes and overtime work. This paper presents the preliminary results of an on-going research that aims to develop a new approach to achieve proactive project control based on better prediction of project performance which utilizes time series analysis techniques with integrated historical productivity data and on-going field productivity. This research proposes a new methodology, named "Pro-Con", that extends the effectiveness of using productivity data that exists in most construction companies' computer systems. The paper presents the potential use of time series analysis in the construction domain to predict performance of a project in progress using integrated productivity data. Two case studies are presented to explain the methodology. The Pro-Con concept enhances field data processing and supports decision making for projects by incorporating up-to-date productivity data into existing project control systems.