Liang. Y. Liu
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Liang. Y. Liu has a total of 20 co-authors. Here are the top co-authors by number of shared publications:
- Youssef M. A. Hashash
Department of Civil & Environmental Engineering University of Illinois at Urbana‐Champaign Urbana Illinois USA
5 shared publications - Yun Y. Su
Graduate, Research Assistants, Department of Civil and Environmental Engineering, University of Illinois at Urbana-Champaign, 205 N. Mathews Ave., Urbana, IL 61801
5 shared publications - Hwayeon Song
Graduate, Research Assistants, Department of Civil and Environmental Engineering, University of Illinois at Urbana-Champaign, 205 N. Mathews Ave., Urbana, IL 61801
2 shared publications - Jose N. Oliveira Filho
Graduate Research Assistant, Department of Civil and Environmental Engineering, University of Illinois at Urbana-Champaign, 205 N. Mathews Ave., Urbana, IL 61801
2 shared publications - Khaled El-Rayes
Associate Professor, Dept. of Civil Engineering, Univ. of Qatar, P.O. Box 2713, Doha, Qatar
2 shared publications - Seokyon Hwang
Ph.D. Candidate, Department of Civil and Environmental Engineering, University of Illinois at Urbana-Champaign, 205 N. Mathews Ave., Urbana, IL 61801
2 shared publications
Latest Publications
- 4 May 2010
- Published by American Society of Civil Engineers (ASCE)
- p. 509-517
BIM for Integration of Automated Real-Time Project Control Systems
Various real-time field data acquisition systems have been developed aiming to automate control of construction projects. Some of those have demonstrated potential for automating project control to a certain extent and most of the systems support a specific function of project control. It is envisioned that successful integration of the systems would create new innovations and opportunities in managing the architecture/engineering/construction (AEC) projects. In an attempt to facilitate integration among real-time systems, this study explored the feasibility of using building information model as a base of integration. In this study, a large volume of literature was reviewed to understand the state of the art real-time project control systems and building information modeling (BIM). Upon the understanding, this study identified a list of conditions or requirements for successful integration. The findings presented in this paper are expected to provide guidelines that need to be taken into consideration when developing automated real-time systems and building information models.
- 4 May 2010
- Published by American Society of Civil Engineers (ASCE)
- p. 509-517
BIM for Integration of Automated Real-Time Project Control Systems
Various real-time field data acquisition systems have been developed aiming to automate control of construction projects. Some of those have demonstrated potential for automating project control to a certain extent and most of the systems support a specific function of project control. It is envisioned that successful integration of the systems would create new innovations and opportunities in managing the architecture/engineering/construction (AEC) projects. In an attempt to facilitate integration among real-time systems, this study explored the feasibility of using building information model as a base of integration. In this study, a large volume of literature was reviewed to understand the state of the art real-time project control systems and building information modeling (BIM). Upon the understanding, this study identified a list of conditions or requirements for successful integration. The findings presented in this paper are expected to provide guidelines that need to be taken into consideration when developing automated real-time systems and building information models.
- 1 May 2010
- Published by American Society of Civil Engineers (ASCE) in Journal of Computing in Civil Engineering
- Vol. 24 (3) , 302-312
Mobile Ad Hoc Network-Enabled Collaboration Framework Supporting Civil Engineering Emergency Response Operations
This paper presents an information-technology-based collaboration framework that facilitates disaster response operations. The collaboration framework incorporates a web collaboration service, radio frequency identification (RFID) tags, a building blackbox system (BBS), a geo-database, and a geographic information system (GIS). Through the integration of these technologies, the framework provides a collaboration medium for first responders, including civil engineers, to cohesively respond to disasters. Access to critical building information, such as construction documents, through the BBS supports assessments of building integrity during disaster response. Building assessment information is stored on RFID tags, which are accessible to first responders through digital devices via a wireless ad hoc network. With on-site assessment information shown on a digital map, decision makers locate, collect, and distribute critical resources through the GIS to first responders. In addition, the decision makers at di...
- 1 May 2010
- Published by American Society of Civil Engineers (ASCE) in Journal of Computing in Civil Engineering
- Vol. 24 (3) , 302-312
Mobile Ad Hoc Network-Enabled Collaboration Framework Supporting Civil Engineering Emergency Response Operations
This paper presents an information-technology-based collaboration framework that facilitates disaster response operations. The collaboration framework incorporates a web collaboration service, radio frequency identification (RFID) tags, a building blackbox system (BBS), a geo-database, and a geographic information system (GIS). Through the integration of these technologies, the framework provides a collaboration medium for first responders, including civil engineers, to cohesively respond to disasters. Access to critical building information, such as construction documents, through the BBS supports assessments of building integrity during disaster response. Building assessment information is stored on RFID tags, which are accessible to first responders through digital devices via a wireless ad hoc network. With on-site assessment information shown on a digital map, decision makers locate, collect, and distribute critical resources through the GIS to first responders. In addition, the decision makers at di...
- 1 September 2009
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 135 (9) , 911-919
Field Experiments to Evaluate and Control Light Tower Glare in Nighttime Work Zones
An increasing volume of highway repair and construction work is being performed during the off-peak nighttime hours to mitigate the impact of construction-related daytime traffic congestions and shorten the duration of construction operations. The utilization and placement of light towers to illuminate the work zone in this type of construction can cause harmful levels of glare for both drivers and construction workers. This paper presents the results of field experiments which were conducted to (1) study the levels of glare and lighting performance generated by light towers in and around nighttime work zones; (2) analyze the combined impact of the light tower set up parameters including its height as well as its aiming and rotation angles on glare and lighting performance; and (3) provide practical recommendations to reduce and control lighting glare in and around nighttime work zones. The results of these experiments confirm that the set up of light towers has a significant impact on glare and therefore it should be carefully designed and executed on nighttime highway construction projects to ensure the safety of the traveling public as well as construction workers.
- 1 September 2009
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 135 (9) , 911-919
Field Experiments to Evaluate and Control Light Tower Glare in Nighttime Work Zones
An increasing volume of highway repair and construction work is being performed during the off-peak nighttime hours to mitigate the impact of construction-related daytime traffic congestions and shorten the duration of construction operations. The utilization and placement of light towers to illuminate the work zone in this type of construction can cause harmful levels of glare for both drivers and construction workers. This paper presents the results of field experiments which were conducted to (1) study the levels of glare and lighting performance generated by light towers in and around nighttime work zones; (2) analyze the combined impact of the light tower set up parameters including its height as well as its aiming and rotation angles on glare and lighting performance; and (3) provide practical recommendations to reduce and control lighting glare in and around nighttime work zones. The results of these experiments confirm that the set up of light towers has a significant impact on glare and therefore it should be carefully designed and executed on nighttime highway construction projects to ensure the safety of the traveling public as well as construction workers.
- 7 March 2008
- Published by American Society of Civil Engineers (ASCE)
- p. 221-228
Semi-Automated Tracking of Excavation Activities Using Imaging Techniques
Field monitoring is usually employed to follow the construction of underground space in densely populated areas. Such monitoring is intended to verify that settlements and lateral deformations around the excavation lie within pre-established parameters. It also allows the identification of impact on nearby structures and utilities, so that engineers can minimize such impact by adjusting the construction processes or excavation rate. In order to facilitate the interpretation of field monitoring it is imperative that a detailed timeline record of different construction activities be developed. Application of image-based techniques to perform a semi-automated tracking of excavation activities is explored in this paper. Special attention is paid to the development of the new Enhanced Pattern Detection and Comparison (EPDC) algorithm. The proposed algorithm facilitates the use of digital cameras and webcam images to highlight locations where different construction activities take place, thus allowing project engineers to create an accurate timeline record of the excavation activities.
- 7 March 2008
- Published by American Society of Civil Engineers (ASCE)
- p. 221-228
Semi-Automated Tracking of Excavation Activities Using Imaging Techniques
Field monitoring is usually employed to follow the construction of underground space in densely populated areas. Such monitoring is intended to verify that settlements and lateral deformations around the excavation lie within pre-established parameters. It also allows the identification of impact on nearby structures and utilities, so that engineers can minimize such impact by adjusting the construction processes or excavation rate. In order to facilitate the interpretation of field monitoring it is imperative that a detailed timeline record of different construction activities be developed. Application of image-based techniques to perform a semi-automated tracking of excavation activities is explored in this paper. Special attention is paid to the development of the new Enhanced Pattern Detection and Comparison (EPDC) algorithm. The proposed algorithm facilitates the use of digital cameras and webcam images to highlight locations where different construction activities take place, thus allowing project engineers to create an accurate timeline record of the excavation activities.
- 23 July 2007
- Published by American Society of Civil Engineers (ASCE)
- p. 809-816
A Building Blackbox for Urban Disaster Response and Relief
In the event of natural and man-made disasters in urban areas, buildings are always being considered as one of the critical physical infrastructures (CPIs). Information regarding the building such as floor plans, emergency exit routes and building condition is highly valuable and critical to the first responders and rescue teams. However, as the experience of the 9/11 terrorist attack shows, access to accurate building information on site was limited and inefficient due to inappropriate and ineffective documentation management. To improve accurate building information access, sharing and collaboration efforts, on-site preservation of building information and local communication networking frameworks with sufficiently robust and redundant systems are vital and necessary. This paper presents the conceptual design of a building blackbox system that is equipped with disaster-survivable protections, wireless communication capabilities and a digital building database to support the decision-making process during and after disastrous events. This blackbox system aims at building an infrastructure of two-way communication between the building systems and the emergency response team over the enhanced mobile ad hoc space for collaboration (MASC) platform, providing real-time and critical information regarding building structural health, environmental conditions and personnel information.
- 23 July 2007
- Published by American Society of Civil Engineers (ASCE)
- p. 809-816
A Building Blackbox for Urban Disaster Response and Relief
In the event of natural and man-made disasters in urban areas, buildings are always being considered as one of the critical physical infrastructures (CPIs). Information regarding the building such as floor plans, emergency exit routes and building condition is highly valuable and critical to the first responders and rescue teams. However, as the experience of the 9/11 terrorist attack shows, access to accurate building information on site was limited and inefficient due to inappropriate and ineffective documentation management. To improve accurate building information access, sharing and collaboration efforts, on-site preservation of building information and local communication networking frameworks with sufficiently robust and redundant systems are vital and necessary. This paper presents the conceptual design of a building blackbox system that is equipped with disaster-survivable protections, wireless communication capabilities and a digital building database to support the decision-making process during and after disastrous events. This blackbox system aims at building an infrastructure of two-way communication between the building systems and the emergency response team over the enhanced mobile ad hoc space for collaboration (MASC) platform, providing real-time and critical information regarding building structural health, environmental conditions and personnel information.
- 23 July 2007
- Published by American Society of Civil Engineers (ASCE)
- p. 200-207
Real-Time Construction Operation Tracking from Resource Positions
Construction operations include many complex tasks and dependencies among resources. Traditionally, collecting operational data involves several manual steps to convert time-lapse photos or videos into productivity data. These manual steps are time-consuming, labor-intensive, and prone to errors. Several technology advances have made new approaches possible for data collection and analysis. Many researchers have experimented with Global Positioning System (GPS) and Radio Frequency Identification (RFID) technology to track the resources on site. By integrating pre-specified boundaries which are associated with the site layout or activities, engineers are able to track the current status of the resources or the current activity in which these resources are engaged. However, these positioning data can be further manipulated to provide more detailed information regarding construction operations such as resource bottlenecks, utilization, and balance. This paper presents an on-going research that analyzes the dynamic geometrical data of resources to extract construction operational information. Preliminary results are presented to demonstrate the feasibility of automatically converting real-time positional data of tracked resources once the geometrical patterns (operational model and strategies) have been identified. A conversion model representing the geometrical patterns is used to transform the input, the positioning data ObjectID(x, y, z, time) collected from RFID or GPS at regular time intervals, into information for productivity analyses. A case study of concrete drainage pipe installation is used to verify and validate the concept. Further discussion will be presented on precisions, lessons learned, and limitations of the relevant technologies.
- 23 July 2007
- Published by American Society of Civil Engineers (ASCE)
- p. 200-207
Real-Time Construction Operation Tracking from Resource Positions
Construction operations include many complex tasks and dependencies among resources. Traditionally, collecting operational data involves several manual steps to convert time-lapse photos or videos into productivity data. These manual steps are time-consuming, labor-intensive, and prone to errors. Several technology advances have made new approaches possible for data collection and analysis. Many researchers have experimented with Global Positioning System (GPS) and Radio Frequency Identification (RFID) technology to track the resources on site. By integrating pre-specified boundaries which are associated with the site layout or activities, engineers are able to track the current status of the resources or the current activity in which these resources are engaged. However, these positioning data can be further manipulated to provide more detailed information regarding construction operations such as resource bottlenecks, utilization, and balance. This paper presents an on-going research that analyzes the dynamic geometrical data of resources to extract construction operational information. Preliminary results are presented to demonstrate the feasibility of automatically converting real-time positional data of tracked resources once the geometrical patterns (operational model and strategies) have been identified. A conversion model representing the geometrical patterns is used to transform the input, the positioning data ObjectID(x, y, z, time) collected from RFID or GPS at regular time intervals, into information for productivity analyses. A case study of concrete drainage pipe installation is used to verify and validate the concept. Further discussion will be presented on precisions, lessons learned, and limitations of the relevant technologies.
- 23 July 2007
- Published by American Society of Civil Engineers (ASCE)
- p. 159-167
Modeling Excavation Process Using Dynamic Modeling Approach
The dynamics of the excavation process affect the performance of resources involved in the operations. This is significant for the reasons: (1) most of excavation work requires costly resources such as excavators and trucks; (2) the overall performance of the process depends on the performance of such resources; and (3) there are intricate interdependencies among resources. In order to incorporate analysis of such dynamics in managing excavation operations, an approach based on dynamic process modeling and simulation is presented. This approach provides critical operational information for effective planning and control of the process, including the progress and corresponding schedule of the overall process and the efficiency of individual resources over time and at the completion that can be used to find a balanced combination of resources. To demonstrate the usefulness of the proposed approach focusing on excavation in building construction an application example is presented.
- 23 July 2007
- Published by American Society of Civil Engineers (ASCE)
- p. 159-167
Modeling Excavation Process Using Dynamic Modeling Approach
The dynamics of the excavation process affect the performance of resources involved in the operations. This is significant for the reasons: (1) most of excavation work requires costly resources such as excavators and trucks; (2) the overall performance of the process depends on the performance of such resources; and (3) there are intricate interdependencies among resources. In order to incorporate analysis of such dynamics in managing excavation operations, an approach based on dynamic process modeling and simulation is presented. This approach provides critical operational information for effective planning and control of the process, including the progress and corresponding schedule of the overall process and the efficiency of individual resources over time and at the completion that can be used to find a balanced combination of resources. To demonstrate the usefulness of the proposed approach focusing on excavation in building construction an application example is presented.
- 1 December 2006
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 132 (12) , 1234-1241
Integration of Construction As-Built Data Via Laser Scanning with Geotechnical Monitoring of Urban Excavation
The demand for urban underground space has been increasing in the past decades to create living space and to avoid traffic congestion. A critical concern during the design and development of the underground space is the influence of construction-related ground movements on neighboring facilities and utilities. Currently, engineers can estimate ground movements using a combination of semiempirical methods and numerical model simulation. However, these advanced analyses require accurate as-built construction staging data, which most projects lack. The traditional approach of collecting construction-staging data is both labor intensive and time consuming. This paper explores the use of three-dimensional laser scanning technology to accurately capture construction activities during development of an urban excavation. The paper describes the planning, execution, and data processing phases of collecting accurate construction as-built staging information over a period of 4 months at an urban excavation site in E...
- 1 December 2006
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 132 (12) , 1234-1241
Integration of Construction As-Built Data Via Laser Scanning with Geotechnical Monitoring of Urban Excavation
The demand for urban underground space has been increasing in the past decades to create living space and to avoid traffic congestion. A critical concern during the design and development of the underground space is the influence of construction-related ground movements on neighboring facilities and utilities. Currently, engineers can estimate ground movements using a combination of semiempirical methods and numerical model simulation. However, these advanced analyses require accurate as-built construction staging data, which most projects lack. The traditional approach of collecting construction-staging data is both labor intensive and time consuming. This paper explores the use of three-dimensional laser scanning technology to accurately capture construction activities during development of an urban excavation. The paper describes the planning, execution, and data processing phases of collecting accurate construction as-built staging information over a period of 4 months at an urban excavation site in E...
- 21 February 2006
- Published by American Society of Civil Engineers (ASCE)
Use of New Technologies for Tracking Excavation Progress
With new development, and increasingly more redevelopment, within urban areas, there is a clear need to efficiently and safely develop underground space. A major concern when placing deep excavations in urban environments is the impact of construction-related ground movements on adjacent buildings and utilities. In practice, when designers are faced with an excavation where ground movements are a critical issue, they can estimate movements using semi-empirical methods or results of numerical modeling. It is common to include a monitoring program during construction to record the ground movements and, in some cases, adjacent building movements. Ideally, these observations would be used to control the construction process and update predictions of movements. This paper describes novel developments in the user of laser scanning and digital photogrammetry for developing an accurate record of construction activities. These new technologies are illustrated using excavations in the Chicago area.
- 21 February 2006
- Published by American Society of Civil Engineers (ASCE)
Use of New Technologies for Tracking Excavation Progress
With new development, and increasingly more redevelopment, within urban areas, there is a clear need to efficiently and safely develop underground space. A major concern when placing deep excavations in urban environments is the impact of construction-related ground movements on adjacent buildings and utilities. In practice, when designers are faced with an excavation where ground movements are a critical issue, they can estimate movements using semi-empirical methods or results of numerical modeling. It is common to include a monitoring program during construction to record the ground movements and, in some cases, adjacent building movements. Ideally, these observations would be used to control the construction process and update predictions of movements. This paper describes novel developments in the user of laser scanning and digital photogrammetry for developing an accurate record of construction activities. These new technologies are illustrated using excavations in the Chicago area.
- 1 August 2005
- Published by American Society of Civil Engineers (ASCE)
Integration of Construction Field Data and Geotechnical Analyses
Urban excavation includes complex engineering issues such as construction methods, support systems, base stability, ground deformations, groundwater control, and influence on adjacent structures. Additionally, the expansion of urbanization over the years has been generating an increasing demand for underground space. Open cuts and tunnels have long been used to create such urban underground space, but as the demand for underground space grows, those excavation issues become even greater concerns. One of the greatest concerns when constructing underground space, beyond conducting it in a timely and cost effective manner while maintaining a safe environment onsite, is the impact of ground movements related to construction activities. This paper presents the preliminary results of a research project which utilizes 3D laser scanning technology to provide accurate 3D as-built construction data for geotechnical analyses. Funded by NSF, this project explores the integration of construction field data into geotechnical monitoring and forecasting that may potentially reduce the impacts of urban deep excavations. The accurate 3D geometry data and construction sequences provide new possibilities for geotechnical analyses at a higher precision.
- 1 August 2005
- Published by American Society of Civil Engineers (ASCE)
Integration of Construction Field Data and Geotechnical Analyses
Urban excavation includes complex engineering issues such as construction methods, support systems, base stability, ground deformations, groundwater control, and influence on adjacent structures. Additionally, the expansion of urbanization over the years has been generating an increasing demand for underground space. Open cuts and tunnels have long been used to create such urban underground space, but as the demand for underground space grows, those excavation issues become even greater concerns. One of the greatest concerns when constructing underground space, beyond conducting it in a timely and cost effective manner while maintaining a safe environment onsite, is the impact of ground movements related to construction activities. This paper presents the preliminary results of a research project which utilizes 3D laser scanning technology to provide accurate 3D as-built construction data for geotechnical analyses. Funded by NSF, this project explores the integration of construction field data into geotechnical monitoring and forecasting that may potentially reduce the impacts of urban deep excavations. The accurate 3D geometry data and construction sequences provide new possibilities for geotechnical analyses at a higher precision.