Hyun-Sik Chang
Research Subjects
Hyun-Sik Chang has a total of 43 co-authors. Here are the top co-authors by number of shared publications:
L. Serio
ITER Organization, Route de Vinon sur Verdon - 13115 St Paul Lez Durance, France
3 shared publications- A. Forgeas
ITER Organization, Route de Vinon sur Verdon, 13115 St Paul lez Durance, France
2 shared publications G. Vincent
2 shared publications- M. Chalifour
ITER Organization, Route de Vinon sur Verdon - 13115 St Paul Lez Durance, France
2 shared publications - R. Maekawa
ITER Organization, Route de Vinon sur Verdon, 13115 St Paul lez Durance, France
2 shared publications A Forgeas
ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St. Paul Lez Durance Cedex, France
1 shared publication
Latest Publications
- 2 November 2023
- Published by Elsevier in Cryogenics
- Vol. 136
A simple study for an optimized operation of the ITER Cryodistribution cold rotating machines
- 2 November 2023
- Published by Elsevier in Cryogenics
- Vol. 136
A simple study for an optimized operation of the ITER Cryodistribution cold rotating machines
- Open Access
- 29 December 2017
- Published by IOP Publishing in IOP Conference Series: Materials Science and Engineering
- Vol. 278 (1) , 012018
Status of the ITER Cryodistribution
Since the conceptual design of the ITER Cryodistribution many modifications have been applied due to both system optimization and improved knowledge of the clients' requirements. Process optimizations in the Cryoplant resulted in component simplifications whereas increased heat load in some of the superconducting magnet systems required more complicated process configuration but also the removal of a cold box was possible due to component arrangement standardization. Another cold box, planned for redundancy, has been removed due to the Tokamak in-Cryostat piping layout modification. In this proceeding we will summarize the present design status and component configuration of the ITER Cryodistribution with all changes implemented which aim at process optimization and simplification as well as operational reliability, stability and flexibility.
- 29 December 2017
- Published by IOP Publishing in IOP Conference Series: Materials Science and Engineering
- Vol. 278 (1) , 012018
Open AccessStatus of the ITER Cryodistribution
Since the conceptual design of the ITER Cryodistribution many modifications have been applied due to both system optimization and improved knowledge of the clients' requirements. Process optimizations in the Cryoplant resulted in component simplifications whereas increased heat load in some of the superconducting magnet systems required more complicated process configuration but also the removal of a cold box was possible due to component arrangement standardization. Another cold box, planned for redundancy, has been removed due to the Tokamak in-Cryostat piping layout modification. In this proceeding we will summarize the present design status and component configuration of the ITER Cryodistribution with all changes implemented which aim at process optimization and simplification as well as operational reliability, stability and flexibility.
- Open Access
- 1 January 2015
- Published by Elsevier in Physics Procedia
- Vol. 67, 35-41
ITER Cryoplant Status and Economics of the LHe plants
- 1 January 2015
- Published by Elsevier in Physics Procedia
- Vol. 67, 35-41
Open AccessITER Cryoplant Status and Economics of the LHe plants
- 1 January 2014
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 1573 (1) , 872
Performance evaluation approach for the supercritical helium cold circulators of ITER
The ITER project design foresees Supercritical Helium (SHe) forced flow cooling for the main cryogenic components, namely, the superconducting (SC) magnets and cryopumps (CP). Therefore, cold circulators have been selected to provide the required SHe mass flow rate to cope with specific operating conditions and technical requirements. Considering the availability impacts of such machines, it has been decided to perform evaluation tests of the cold circulators at operating conditions prior to the series production in order to minimize the project technical risks. A proposal has been conceptualized, evaluated and simulated to perform representative tests of the full scale SHe cold circulators. The objectives of the performance tests include the validation of normal operating condition, transient and off-design operating modes as well as the efficiency measurement. A suitable process and instrumentation diagram of the test valve box (TVB) has been developed to implement the tests at the required thermodynamic conditions. The conceptual engineering design of the TVB has been developed along with the required thermal analysis for the normal operating conditions to support the performance evaluation of the SHe cold circulator.
- 1 January 2014
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 1573 (1) , 872
Performance evaluation approach for the supercritical helium cold circulators of ITER
The ITER project design foresees Supercritical Helium (SHe) forced flow cooling for the main cryogenic components, namely, the superconducting (SC) magnets and cryopumps (CP). Therefore, cold circulators have been selected to provide the required SHe mass flow rate to cope with specific operating conditions and technical requirements. Considering the availability impacts of such machines, it has been decided to perform evaluation tests of the cold circulators at operating conditions prior to the series production in order to minimize the project technical risks. A proposal has been conceptualized, evaluated and simulated to perform representative tests of the full scale SHe cold circulators. The objectives of the performance tests include the validation of normal operating condition, transient and off-design operating modes as well as the efficiency measurement. A suitable process and instrumentation diagram of the test valve box (TVB) has been developed to implement the tests at the required thermodynamic conditions. The conceptual engineering design of the TVB has been developed along with the required thermal analysis for the normal operating conditions to support the performance evaluation of the SHe cold circulator.
- 5 March 2012
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 22 (3) , 4704004
Dynamic Simulation of Sub-Scale ITER CS/STR Cooling Loop
The dynamic simulation of a sub-scale ITER Central Solenoid (CS)/STRucture (STR) cooling loop has been performed to investigate the cryogenic control strategies against pulsating heat loads. HELIOS facility has been modified for this particular study, which consists of a Liquid Helium (LHe) reservoir with two immersed heat exchangers, a circulation pump and an approximately 130 m long piping with three evenly distributed heated sections. The setup provides the equivalent thermo-hydraulic configuration of the ITER CS/STR, cooled by the forced-flow Supercritical Helium (SHe). The dynamic simulator, C-PREST, has been utilized to model the HELIOS test loop and to compare the results with the experimental data sets. This paper presents the dynamic simulation results and discusses the control strategy to minimize the cooling power requirements, to have high reliability.
- 5 March 2012
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 22 (3) , 4704004
Dynamic Simulation of Sub-Scale ITER CS/STR Cooling Loop
The dynamic simulation of a sub-scale ITER Central Solenoid (CS)/STRucture (STR) cooling loop has been performed to investigate the cryogenic control strategies against pulsating heat loads. HELIOS facility has been modified for this particular study, which consists of a Liquid Helium (LHe) reservoir with two immersed heat exchangers, a circulation pump and an approximately 130 m long piping with three evenly distributed heated sections. The setup provides the equivalent thermo-hydraulic configuration of the ITER CS/STR, cooled by the forced-flow Supercritical Helium (SHe). The dynamic simulator, C-PREST, has been utilized to model the HELIOS test loop and to compare the results with the experimental data sets. This paper presents the dynamic simulation results and discusses the control strategy to minimize the cooling power requirements, to have high reliability.
- 2 December 2011
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 22 (3) , 4703804
Feasibility Studies of the ITER Cryogenic System at KSTAR
One of the main challenges of the ITER cryogenic system is to manage the large pulsed heat load variation generated by the superconducting magnet system during the fusion experiments. A solution proposed to smooth such pulses and verified by numerical simulations is to use the ITER magnet structure (ST) system as a thermal buffer by taking advantage of its large mass of about 5,000 tons and consequent thermal inertia. In order to validate the simulated predictions, tests have been executed on existing cryogenic facilities. In this paper we will present the results of the ITER cryogenic system feasibility tests performed at KSTAR. The tests were concentrated on the heat load mitigation scenario of the ITER ST via variation of the coolant mass flow rate by using a flow by-pass valve in parallel with an in-line valve.
- 2 December 2011
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 22 (3) , 4703804
Feasibility Studies of the ITER Cryogenic System at KSTAR
One of the main challenges of the ITER cryogenic system is to manage the large pulsed heat load variation generated by the superconducting magnet system during the fusion experiments. A solution proposed to smooth such pulses and verified by numerical simulations is to use the ITER magnet structure (ST) system as a thermal buffer by taking advantage of its large mass of about 5,000 tons and consequent thermal inertia. In order to validate the simulated predictions, tests have been executed on existing cryogenic facilities. In this paper we will present the results of the ITER cryogenic system feasibility tests performed at KSTAR. The tests were concentrated on the heat load mitigation scenario of the ITER ST via variation of the coolant mass flow rate by using a flow by-pass valve in parallel with an in-line valve.