Morten Welde
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Morten Welde has a total of 18 co-authors. Here are the top co-authors by number of shared publications:
- Gro Holst Volden
NTNU
4 shared publications - Eivind Tveter
HiMolde
3 shared publications James Odeck
3 shared publications- Atle Engebø
Department of Civil and Environmental Engineering, Norwegian University of Science and Technology, Trondheim, Norway
2 shared publications - James Odeck
Norwegian Univ Sci & Technol, N-7491 Trondheim, Norway
2 shared publications - James Odeck
Norwegian University of Science and Technology
2 shared publications
Latest Publications
- Open Access
- 1 May 2026
- Published by Elsevier in Project Leadership and Society
- Vol. 7
A cautionary tale in front-end planning and governance: The UK High Speed 2 project
- 1 May 2026
- Published by Elsevier in Project Leadership and Society
- Vol. 7
Open AccessA cautionary tale in front-end planning and governance: The UK High Speed 2 project
- Open Access
- 30 March 2026
- Published by Norwegian University of Science and Technology (NTNU) Library in Moderne mobilitet og infrastruktur
- Vol. 4 (1)
Stadig lavere avkastning fra nye veiprosjekter
- 30 March 2026
- Published by Norwegian University of Science and Technology (NTNU) Library in Moderne mobilitet og infrastruktur
- Vol. 4 (1)
Open AccessStadig lavere avkastning fra nye veiprosjekter
- Open Access
- 1 January 2026
- Published by Wiley in Journal of Engineering
- Vol. 2026 (1) , 1697975
What Makes Road Projects Successful? Lessons From an Evaluation Synthesis of 14 Road Engineering Projects
Road infrastructure projects are a core element of modern engineering systems, yet their realised performance frequently differs from expectations formed during planning and appraisal. Despite this, systematic ex post evaluation that supports learning in engineering practice remains limited. This paper presents a synthesis of 14 evaluations of major road projects in Norway, drawing on comprehensive ex post evaluations conducted using a standardised framework inspired by the OECD DAC criteria. Project success is assessed across multiple engineering‐relevant dimensions, including cost, time and quality performance, tactical effectiveness and longer‐term outcomes related to relevance, sustainability and benefit–cost efficiency. By analysing evaluation reports produced several years after project opening, the study provides empirical insight into how engineering design choices, uncertainty management, constructability and client competence influence both delivery performance and long‐term infrastructure value. The results show that most projects achieved acceptable performance in terms of schedule, cost control and technical quality, reflecting the role of structured governance and probabilistic cost estimation. However, recurring challenges were identified, particularly underestimated geotechnical uncertainty, overambitious schedules and weakly formulated goals. Ex post benefit–cost results often differed markedly from ex ante estimates, highlighting the sensitivity of appraisals to modelling assumptions and demand forecasts. The paper demonstrates how systematic ex post evaluation can strengthen feedback loops between planning, design and delivery, thereby fostering a more robust and learning‐oriented approach to road infrastructure engineering.
- 1 January 2026
- Published by Wiley in Journal of Engineering
- Vol. 2026 (1) , 1697975
Open AccessWhat Makes Road Projects Successful? Lessons From an Evaluation Synthesis of 14 Road Engineering Projects
Road infrastructure projects are a core element of modern engineering systems, yet their realised performance frequently differs from expectations formed during planning and appraisal. Despite this, systematic ex post evaluation that supports learning in engineering practice remains limited. This paper presents a synthesis of 14 evaluations of major road projects in Norway, drawing on comprehensive ex post evaluations conducted using a standardised framework inspired by the OECD DAC criteria. Project success is assessed across multiple engineering‐relevant dimensions, including cost, time and quality performance, tactical effectiveness and longer‐term outcomes related to relevance, sustainability and benefit–cost efficiency. By analysing evaluation reports produced several years after project opening, the study provides empirical insight into how engineering design choices, uncertainty management, constructability and client competence influence both delivery performance and long‐term infrastructure value. The results show that most projects achieved acceptable performance in terms of schedule, cost control and technical quality, reflecting the role of structured governance and probabilistic cost estimation. However, recurring challenges were identified, particularly underestimated geotechnical uncertainty, overambitious schedules and weakly formulated goals. Ex post benefit–cost results often differed markedly from ex ante estimates, highlighting the sensitivity of appraisals to modelling assumptions and demand forecasts. The paper demonstrates how systematic ex post evaluation can strengthen feedback loops between planning, design and delivery, thereby fostering a more robust and learning‐oriented approach to road infrastructure engineering.
- Open Access
- 27 May 2025
- Published by Norwegian University of Science and Technology (NTNU) Library in Moderne mobilitet og infrastruktur
- Vol. 3 (1)
Tidlige indikatorer på lønnsomhet
Med data fra over 1000 norske og svenske vegprosjekter har vi jaktet på indikatorer som kan hjelpe myndighetene å skille lønnsomme og ulønnsomme prosjekter i en tidlig fase. Ambisjonen er å lage et indikatorsett som kan si noe om hvorvidt et tenkt vegprosjekt har håp om å kunne bli lønnsomt – lenge før det er mulig å gjennomføre en fullstendig nytte-kostnadsanalyse.
- 27 May 2025
- Published by Norwegian University of Science and Technology (NTNU) Library in Moderne mobilitet og infrastruktur
- Vol. 3 (1)
Open AccessTidlige indikatorer på lønnsomhet
Med data fra over 1000 norske og svenske vegprosjekter har vi jaktet på indikatorer som kan hjelpe myndighetene å skille lønnsomme og ulønnsomme prosjekter i en tidlig fase. Ambisjonen er å lage et indikatorsett som kan si noe om hvorvidt et tenkt vegprosjekt har håp om å kunne bli lønnsomt – lenge før det er mulig å gjennomføre en fullstendig nytte-kostnadsanalyse.
- Open Access
- 27 May 2025
- Published by Norwegian University of Science and Technology (NTNU) Library in Moderne mobilitet og infrastruktur
- Vol. 3 (1)
Etterevaluering av vegprosjekter gir nyttige lærdommer til fremtidige prosjekter
Vegprosjekter utredes grundig i forkant, men er altfor sjelden gjenstand for systematisk etterevaluering. Vi har evaluert 14 vegprosjekter noen år ut i driftsfase, og presenterer viktige lærdommer som kan være til nytte for kommende prosjekter.
- 27 May 2025
- Published by Norwegian University of Science and Technology (NTNU) Library in Moderne mobilitet og infrastruktur
- Vol. 3 (1)
Open AccessEtterevaluering av vegprosjekter gir nyttige lærdommer til fremtidige prosjekter
Vegprosjekter utredes grundig i forkant, men er altfor sjelden gjenstand for systematisk etterevaluering. Vi har evaluert 14 vegprosjekter noen år ut i driftsfase, og presenterer viktige lærdommer som kan være til nytte for kommende prosjekter.
- Open Access
- 16 May 2025
- Published by Elsevier in Transport Policy
- Vol. 170, 137-146
Accounting for uncertainties in cost-benefit analyses of road projects: A procedure illustrated by real-world projects
- 16 May 2025
- Published by Elsevier in Transport Policy
- Vol. 170, 137-146
Open AccessAccounting for uncertainties in cost-benefit analyses of road projects: A procedure illustrated by real-world projects
- Open Access
- 9 March 2025
- Published by Elsevier in Transport Policy
- Vol. 166, 202-213
What characterises road projects with positive net benefit-cost ratios? Insights from Norway and Sweden
- 9 March 2025
- Published by Elsevier in Transport Policy
- Vol. 166, 202-213
Open AccessWhat characterises road projects with positive net benefit-cost ratios? Insights from Norway and Sweden
- 29 May 2024
- Published by Emerald Publishing in International Journal of Managing Projects in Business
- Vol. 17 (3) , 430-454
Do nothing, do minimum or do something? Why public project appraisals “always” recommend large projects
Purpose: In the project initiation phase, an appraisal is needed to clarify the strategic problem and alternative solutions. Full-scale construction projects and simple solutions (do-minimum alternatives) should be assessed. The do-nothing alternative is the baseline for the appraisal and an option in itself. The paper explores the role of do-nothing and do-minimum alternatives in public project appraisal, which may significantly impact the attractiveness of a construction project.Design/methodology/approach: The paper presents an empirical study from Norway, which requires external quality assurance (QA) of early project appraisals. The data include an extensive document review of 112 projects and interviews with 41 experts involved in the appraisal processes.Findings: Of 112 appraisals, 110 recommended a major construction project, including cases where the benefits and value were low or uncertain. The do-nothing alternative was generally included as a reference but not treated as a viable option. Do-minimum alternatives were often not explored. By contrast, the external QA reports recommended do-nothing or do-minimum in 28 cases. Interestingly, although political decision-makers rarely reject projects, they may put them on hold indefinitely, implying that the actual outcome in many cases is still do-nothing.Originality/value: The paper addresses a topic that has been understudied in the literature. The findings contribute to the broader literature on project initiation processes, project appraisal and how to reduce the risk of bias and manipulation in appraisals.
- 29 May 2024
- Published by Emerald Publishing in International Journal of Managing Projects in Business
- Vol. 17 (3) , 430-454
Do nothing, do minimum or do something? Why public project appraisals “always” recommend large projects
Purpose: In the project initiation phase, an appraisal is needed to clarify the strategic problem and alternative solutions. Full-scale construction projects and simple solutions (do-minimum alternatives) should be assessed. The do-nothing alternative is the baseline for the appraisal and an option in itself. The paper explores the role of do-nothing and do-minimum alternatives in public project appraisal, which may significantly impact the attractiveness of a construction project.Design/methodology/approach: The paper presents an empirical study from Norway, which requires external quality assurance (QA) of early project appraisals. The data include an extensive document review of 112 projects and interviews with 41 experts involved in the appraisal processes.Findings: Of 112 appraisals, 110 recommended a major construction project, including cases where the benefits and value were low or uncertain. The do-nothing alternative was generally included as a reference but not treated as a viable option. Do-minimum alternatives were often not explored. By contrast, the external QA reports recommended do-nothing or do-minimum in 28 cases. Interestingly, although political decision-makers rarely reject projects, they may put them on hold indefinitely, implying that the actual outcome in many cases is still do-nothing.Originality/value: The paper addresses a topic that has been understudied in the literature. The findings contribute to the broader literature on project initiation processes, project appraisal and how to reduce the risk of bias and manipulation in appraisals.
- Open Access
- 19 May 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Engineering Management
- Vol. 71 (00189391) , 1984-1997
Avoiding Cost Overrun Through Stochastic Cost Estimation and External Quality Assurance
Cost overruns are a threat to project performance and continue to attract interest in both the popular media and the academic literature. Numerous studies from all continents have demonstrated that overruns remain prevalent in all industries. Although there are different suggestions as to what are the main causes of this problem, few studies have demonstrated what can be done to improve cost performance. This article provides evidence that improved cost estimation methodologies combined with external quality assurance can significantly reduce the extent of cost overruns in projects. The authors use data from 96 government projects in Norway, which implemented a quality assurance regime for large investment projects in the year 2000. The results show that cost performance was reasonably good. Only c. 25% of the projects subject to the regime experienced cost overruns. This suggests that by using proper cost estimation methodologies that are embedded in a governance framework that ensures that projects are subject to external scrutiny, the risks of cost overruns can be significantly reduced. The results should be encouraging for project owners who may have the impression that overrun is an unavoidable part of project delivery.
- 19 May 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Engineering Management
- Vol. 71 (00189391) , 1984-1997
Open AccessAvoiding Cost Overrun Through Stochastic Cost Estimation and External Quality Assurance
Cost overruns are a threat to project performance and continue to attract interest in both the popular media and the academic literature. Numerous studies from all continents have demonstrated that overruns remain prevalent in all industries. Although there are different suggestions as to what are the main causes of this problem, few studies have demonstrated what can be done to improve cost performance. This article provides evidence that improved cost estimation methodologies combined with external quality assurance can significantly reduce the extent of cost overruns in projects. The authors use data from 96 government projects in Norway, which implemented a quality assurance regime for large investment projects in the year 2000. The results show that cost performance was reasonably good. Only c. 25% of the projects subject to the regime experienced cost overruns. This suggests that by using proper cost estimation methodologies that are embedded in a governance framework that ensures that projects are subject to external scrutiny, the risks of cost overruns can be significantly reduced. The results should be encouraging for project owners who may have the impression that overrun is an unavoidable part of project delivery.
- Open Access
- 15 January 2022
- Published by MDPI AG in Sustainability
- Vol. 14 (2) , 960
Sustainable Project Management: Reducing the Risk of Cost Inaccuracy Using a PLS-SEM Approach
Determining the factors leading to cost inaccuracy in infrastructure projects relates to sustainability by improving the cost performance of the projects (economic sustainability) and reducing the waste of available resources (environmental sustainability). This study investigates the effects of various factors affecting the cost performance of large-scale road projects in Norway in both the planning and construction phases. To this aim, a quantitative approach using a questionnaire survey was employed to understand the attitude of practitioners towards various factors causing cost increases. An advanced multivariate statistical approach of Partial Least Square Structural Equation Modeling (PLS-SEM) and Relative Importance Index (RII) was utilized to analyze the questionnaire responses. The results of the RII analysis show that local wishes, defective estimations, and long processing times had the most impact on the cost increase during the planning phase. At the same time, scope changes, market conditions, and unforeseen ground conditions were the most influential parameters in the construction phase. Moreover, the results obtained from PLS-SEM reveal that external related factors had the most influence among the other grouped factors (i.e., pre-construction, project management and contractual relationship, contractor’s site management, and external) on cost overrun during the construction phase. Increasing the knowledge of these factors will allow for developing relevant project management approaches targeted at improving economic and environmental sustainability within both the planning and construction phases.
- 15 January 2022
- Published by MDPI AG in Sustainability
- Vol. 14 (2) , 960
Open AccessSustainable Project Management: Reducing the Risk of Cost Inaccuracy Using a PLS-SEM Approach
Determining the factors leading to cost inaccuracy in infrastructure projects relates to sustainability by improving the cost performance of the projects (economic sustainability) and reducing the waste of available resources (environmental sustainability). This study investigates the effects of various factors affecting the cost performance of large-scale road projects in Norway in both the planning and construction phases. To this aim, a quantitative approach using a questionnaire survey was employed to understand the attitude of practitioners towards various factors causing cost increases. An advanced multivariate statistical approach of Partial Least Square Structural Equation Modeling (PLS-SEM) and Relative Importance Index (RII) was utilized to analyze the questionnaire responses. The results of the RII analysis show that local wishes, defective estimations, and long processing times had the most impact on the cost increase during the planning phase. At the same time, scope changes, market conditions, and unforeseen ground conditions were the most influential parameters in the construction phase. Moreover, the results obtained from PLS-SEM reveal that external related factors had the most influence among the other grouped factors (i.e., pre-construction, project management and contractual relationship, contractor’s site management, and external) on cost overrun during the construction phase. Increasing the knowledge of these factors will allow for developing relevant project management approaches targeted at improving economic and environmental sustainability within both the planning and construction phases.