James Odeck
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
James Odeck has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Morten Welde
NTNU
2 shared publications - Ali Foroutan Mirhosseini
Norwegian Public Roads Administration (NPRA), Trondheim, Norway
1 shared publication - Gro Holst Volden
SINTEF
1 shared publication - Kelly Pitera
Norwegian University of Science and Technology (NTNU), Trondheim, Norway
1 shared publication - Morten Welde
Norwegian University of Science and Technology
1 shared publication
Latest Publications
- Open Access
- 15 January 2022
- Published by MDPI AG in Sustainability
- Vol. 14 (2) , 960
Sustainable Project Management: Reducing the Risk of Cost Inaccuracy Using a PLS-SEM Approach
Determining the factors leading to cost inaccuracy in infrastructure projects relates to sustainability by improving the cost performance of the projects (economic sustainability) and reducing the waste of available resources (environmental sustainability). This study investigates the effects of various factors affecting the cost performance of large-scale road projects in Norway in both the planning and construction phases. To this aim, a quantitative approach using a questionnaire survey was employed to understand the attitude of practitioners towards various factors causing cost increases. An advanced multivariate statistical approach of Partial Least Square Structural Equation Modeling (PLS-SEM) and Relative Importance Index (RII) was utilized to analyze the questionnaire responses. The results of the RII analysis show that local wishes, defective estimations, and long processing times had the most impact on the cost increase during the planning phase. At the same time, scope changes, market conditions, and unforeseen ground conditions were the most influential parameters in the construction phase. Moreover, the results obtained from PLS-SEM reveal that external related factors had the most influence among the other grouped factors (i.e., pre-construction, project management and contractual relationship, contractor’s site management, and external) on cost overrun during the construction phase. Increasing the knowledge of these factors will allow for developing relevant project management approaches targeted at improving economic and environmental sustainability within both the planning and construction phases.
- 15 January 2022
- Published by MDPI AG in Sustainability
- Vol. 14 (2) , 960
Open AccessSustainable Project Management: Reducing the Risk of Cost Inaccuracy Using a PLS-SEM Approach
Determining the factors leading to cost inaccuracy in infrastructure projects relates to sustainability by improving the cost performance of the projects (economic sustainability) and reducing the waste of available resources (environmental sustainability). This study investigates the effects of various factors affecting the cost performance of large-scale road projects in Norway in both the planning and construction phases. To this aim, a quantitative approach using a questionnaire survey was employed to understand the attitude of practitioners towards various factors causing cost increases. An advanced multivariate statistical approach of Partial Least Square Structural Equation Modeling (PLS-SEM) and Relative Importance Index (RII) was utilized to analyze the questionnaire responses. The results of the RII analysis show that local wishes, defective estimations, and long processing times had the most impact on the cost increase during the planning phase. At the same time, scope changes, market conditions, and unforeseen ground conditions were the most influential parameters in the construction phase. Moreover, the results obtained from PLS-SEM reveal that external related factors had the most influence among the other grouped factors (i.e., pre-construction, project management and contractual relationship, contractor’s site management, and external) on cost overrun during the construction phase. Increasing the knowledge of these factors will allow for developing relevant project management approaches targeted at improving economic and environmental sustainability within both the planning and construction phases.
- 1 September 2018
- Published by Elsevier in Research in Transportation Business & Management
- Vol. 28, 1-2
Efficiency and productivity in the transportation sector
- 1 September 2018
- Published by Elsevier in Research in Transportation Business & Management
- Vol. 28, 1-2
Efficiency and productivity in the transportation sector
- Open Access
- 1 June 2015
- Published by TU Delft OPEN Publishing in European Journal Of Transport and Infrastructure Research
- Vol. 15 (3)
The Impact of External Quality Assurance of Costs Estimates on Cost Overruns: Empirical Evidence from the Norwegian Road Sector
Cost overruns in transport infrastructure projects are prevalent and have been well documented in the literature; see, for instance, Flyvbjerg et al. (2003), Odeck (2004 and 2014) and Cantarelli et al. (2010). Governments may therefore exert efforts to reduce overruns by implementing strategies such as quality assurance of cost estimates, whereby external consultants are engaged to assure the accuracy of estimates. However, the literature has to a lesser extent provided evidence on what governments do to combat overruns and whether those efforts work in practice. This paper provides such evidence for the case of Norway, where the government implemented a quality assurance regime for cost estimates above 500 million NOK in the early 2000. Apart from explaining the Norwegian quality assurance regime, the paper uses statistical inferences to compare the magnitudes of cost overruns in the pre-and post- quality assurance periods. The statistically significant derived results are as follows: (i) quality assurance has led to a reduction in cost overruns; (ii) quality assurance has not, however, led to improved accuracy of the estimates provided by the authorities – rather, it has led to systematic overestimation by the authorities; and (iii) external consultants are more accurate than the authorities. We conclude that the quality assurance regime is achieving the objectives of reducing cost overruns and that similar regimes should be considered for smaller projects where overruns have been shown to be very large.
- 1 June 2015
- Published by TU Delft OPEN Publishing in European Journal Of Transport and Infrastructure Research
- Vol. 15 (3)
Open AccessThe Impact of External Quality Assurance of Costs Estimates on Cost Overruns: Empirical Evidence from the Norwegian Road Sector
Cost overruns in transport infrastructure projects are prevalent and have been well documented in the literature; see, for instance, Flyvbjerg et al. (2003), Odeck (2004 and 2014) and Cantarelli et al. (2010). Governments may therefore exert efforts to reduce overruns by implementing strategies such as quality assurance of cost estimates, whereby external consultants are engaged to assure the accuracy of estimates. However, the literature has to a lesser extent provided evidence on what governments do to combat overruns and whether those efforts work in practice. This paper provides such evidence for the case of Norway, where the government implemented a quality assurance regime for cost estimates above 500 million NOK in the early 2000. Apart from explaining the Norwegian quality assurance regime, the paper uses statistical inferences to compare the magnitudes of cost overruns in the pre-and post- quality assurance periods. The statistically significant derived results are as follows: (i) quality assurance has led to a reduction in cost overruns; (ii) quality assurance has not, however, led to improved accuracy of the estimates provided by the authorities – rather, it has led to systematic overestimation by the authorities; and (iii) external consultants are more accurate than the authorities. We conclude that the quality assurance regime is achieving the objectives of reducing cost overruns and that similar regimes should be considered for smaller projects where overruns have been shown to be very large.
- Open Access
- 1 January 2011
- Published by TU Delft OPEN Publishing in European Journal Of Transport and Infrastructure Research
- Vol. 11 (1)
Do Planners Get it Right? The Accuracy of Travel Demand Forecasting in Norway
This paper deals with the accuracy of travel demand forecasts among Norwegian road projects. We use data collected from tolled roads and toll free roads. The results reveal that while traffic forecasts of tolled schemes are fairly accurate, traffic forecasts among toll free roads have a higher degree of inaccuracy and are generally underestimated. An explanation for the observed discrepancy between estimated and actual traffic among toll free roads is that road planners may have ignored the existence of induced traffic and that the standard national traffic growth rates used in the transport models has been too low. For tolled roads, an explanation for the higher degree of forecast accuracy is that planners over the years have been scrutinized to provide careful estimates. Our recommendation is that traffic forecasts provided by planners should constantly be subjected to scrutiny by independent consultants before being presented to the decision makers. Aspects that need to be specifically examined include: (1) the extent to which a road project may lead to induced traffic, (2) the extent to which transport models accommodate appropriate factors and, (3) the extent to which forecasts made address uncertainties by providing confidence intervals of estimates.
- 1 January 2011
- Published by TU Delft OPEN Publishing in European Journal Of Transport and Infrastructure Research
- Vol. 11 (1)
Open AccessDo Planners Get it Right? The Accuracy of Travel Demand Forecasting in Norway
This paper deals with the accuracy of travel demand forecasts among Norwegian road projects. We use data collected from tolled roads and toll free roads. The results reveal that while traffic forecasts of tolled schemes are fairly accurate, traffic forecasts among toll free roads have a higher degree of inaccuracy and are generally underestimated. An explanation for the observed discrepancy between estimated and actual traffic among toll free roads is that road planners may have ignored the existence of induced traffic and that the standard national traffic growth rates used in the transport models has been too low. For tolled roads, an explanation for the higher degree of forecast accuracy is that planners over the years have been scrutinized to provide careful estimates. Our recommendation is that traffic forecasts provided by planners should constantly be subjected to scrutiny by independent consultants before being presented to the decision makers. Aspects that need to be specifically examined include: (1) the extent to which a road project may lead to induced traffic, (2) the extent to which transport models accommodate appropriate factors and, (3) the extent to which forecasts made address uncertainties by providing confidence intervals of estimates.