Kurt Joham
Research Subjects
Kurt Joham has a total of 3 co-authors. Here are the top co-authors by number of shared publications:
- Jürgen Voringer
G. Hinteregger & Söhne Baugesellschaft m.b.H.; Bergerbräuhofstraße 27 5020 Salzburg Austria
1 shared publication - Manfred Bauer
G. Hinteregger & Söhne Baugesellschaft m.b.H., Bergerbräuhofstrasse 27, A-5021 Salzburg, Austria
1 shared publication - Peter Schubert
C consulenten ZT GesmbH, Zollhausweg 1, A-5101 Bergheim, Austria
1 shared publication
Latest Publications
- 5 December 2018
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 11 (6) , 636-646
From conventional to mechanised tunnelling – A technical and operational challenge
The article provides a summarised report about the redesign of the 8,822 m long Boßler Tunnel from the originally intended shotcrete method to a mechanically driven tunnel. The twin‐bore Boßler Tunnel is the main contract on the Albaufstieg (Alb ascent) section of the new DB line from Wendlingen to Ulm as part of the major DB project Stuttgart–Ulm. In 2012, the tunnel was tendered by the DB AG for construction by conventional methods with shotcrete support, but a bid for the Boßler Tunnel was received from the consortium Porr, Hinteregger, Östu/Stettin and Swietelsky with an alternative proposal to drive a 2,900 m long section of the tunnel with a machine. The contract was awarded with the alternative proposal and during the construction of the Boßler Tunnel, a change was then made to complete mechanised tunnelling in a unique technical and operational process. The report provides an insight into the challenges of a change to the overall construction system, undertaken after the award during the construction period, for the driving of altogether 17,500 m of tunnel bores. Construction operations, logistics, design for construction, additional investigation measures and contractual parameters were reorganised and redesigned on a tight schedule. Starting with the original 5,800 m TBM drive and the start of tunnelling in April 2015, the entire Boßler Tunnel was actually constructed as a mechanically driven single‐pass tunnel by June 2018.
- 5 December 2018
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 11 (6) , 636-646
From conventional to mechanised tunnelling – A technical and operational challenge
The article provides a summarised report about the redesign of the 8,822 m long Boßler Tunnel from the originally intended shotcrete method to a mechanically driven tunnel. The twin‐bore Boßler Tunnel is the main contract on the Albaufstieg (Alb ascent) section of the new DB line from Wendlingen to Ulm as part of the major DB project Stuttgart–Ulm. In 2012, the tunnel was tendered by the DB AG for construction by conventional methods with shotcrete support, but a bid for the Boßler Tunnel was received from the consortium Porr, Hinteregger, Östu/Stettin and Swietelsky with an alternative proposal to drive a 2,900 m long section of the tunnel with a machine. The contract was awarded with the alternative proposal and during the construction of the Boßler Tunnel, a change was then made to complete mechanised tunnelling in a unique technical and operational process. The report provides an insight into the challenges of a change to the overall construction system, undertaken after the award during the construction period, for the driving of altogether 17,500 m of tunnel bores. Construction operations, logistics, design for construction, additional investigation measures and contractual parameters were reorganised and redesigned on a tight schedule. Starting with the original 5,800 m TBM drive and the start of tunnelling in April 2015, the entire Boßler Tunnel was actually constructed as a mechanically driven single‐pass tunnel by June 2018.
- 2 October 2017
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 10 (5) , 477-488
DB major project Stuttgart-Ulm, Albaufstieg-Steinbühl Tunnel - Tunnel excavation and lining in karst
- 2 October 2017
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 10 (5) , 477-488
DB major project Stuttgart-Ulm, Albaufstieg-Steinbühl Tunnel - Tunnel excavation and lining in karst
- 5 April 2017
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 10 (2) , 123-134
Optimisation of the TBM drive at the Boßler Tunnel using the observation method and an incremental design and contract development process
- 5 April 2017
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 10 (2) , 123-134
Optimisation of the TBM drive at the Boßler Tunnel using the observation method and an incremental design and contract development process