Filippo Maria Leoni
Research Subjects
Research Interests
Filippo Maria Leoni has a total of 10 co-authors. Here are the top co-authors by number of shared publications:
- Alessandro Bertero
Trevi Spa, Design, Research and Development
2 shared publications - David Druss
Trevi Spa, Design, Research and Development
1 shared publication - David Druss
TREVIICOS South, LPV 111 Project Manager
1 shared publication - Fabrizio Leoni
Trevi Group
1 shared publication - George M. Filz
Professor, Civil and Environmental Engineering, Virginia Tech, Blacksburg, VA 24061
1 shared publication - Gianluca Pianezze
Treviicos Corporation
1 shared publication
Latest Publications
- 6 July 2017
- Published by American Society of Civil Engineers (ASCE)
- p. 11-20
Elliptical Jet Grouting: An Innovative, Viable, and Effective Solution: The Example of the Bottom Plugs for the SELA Projects in New Orleans, LA
As part of the Southeast Louisiana (SELA) drainage program, designed to reduce flood damages in the City of New Orleans and surrounding parishes, several individual projects required ground improvement work to replace the soil between parallel lines of sheet piles with a soil-cement mass, having the purposes of both eliminating under-seepage, thus creating a so-called bottom plug, and providing structural support for the underground concrete box culverts, as well as providing a stable and dry work platform for the subsequent operations of excavation, forming, casting, etc. The U.S. Army Corps of Engineers (USACE), New Orleans District, selected the jet grouting technology for the construction of the bottom plugs. For the contracts it was awarded, the specialty geotechnical contractor proposed to accomplish the task utilizing their proprietary and innovative elliptical bi-fluid jet grout technology. This technology, introduced for the first time in an actual production work in the U.S., offers great benefits in terms of productivity and flexibility, while always maintaining the necessary quality of the work. It may also provide important environmental benefits in terms of reduced binder and transport needs. This paper will present in detail the main features and advantages of the elliptical jet grouting technology, and will provide supporting evidences from the successfully completed SELA-22 and the ongoing SELA-26 projects in New Orleans.
- 6 July 2017
- Published by American Society of Civil Engineers (ASCE)
- p. 11-20
Elliptical Jet Grouting: An Innovative, Viable, and Effective Solution: The Example of the Bottom Plugs for the SELA Projects in New Orleans, LA
As part of the Southeast Louisiana (SELA) drainage program, designed to reduce flood damages in the City of New Orleans and surrounding parishes, several individual projects required ground improvement work to replace the soil between parallel lines of sheet piles with a soil-cement mass, having the purposes of both eliminating under-seepage, thus creating a so-called bottom plug, and providing structural support for the underground concrete box culverts, as well as providing a stable and dry work platform for the subsequent operations of excavation, forming, casting, etc. The U.S. Army Corps of Engineers (USACE), New Orleans District, selected the jet grouting technology for the construction of the bottom plugs. For the contracts it was awarded, the specialty geotechnical contractor proposed to accomplish the task utilizing their proprietary and innovative elliptical bi-fluid jet grout technology. This technology, introduced for the first time in an actual production work in the U.S., offers great benefits in terms of productivity and flexibility, while always maintaining the necessary quality of the work. It may also provide important environmental benefits in terms of reduced binder and transport needs. This paper will present in detail the main features and advantages of the elliptical jet grouting technology, and will provide supporting evidences from the successfully completed SELA-22 and the ongoing SELA-26 projects in New Orleans.
- 17 August 2012
- Published by American Society of Civil Engineers (ASCE)
- p. 682-693
Construction Operations and Quality Control of Deep Mixing at Levee LPV111 New Orleans
Deep Mixing (DMM) for the LPV-111 Levee in New Orleans presented many Quality Control and logistical challenges. The project consists of approximately 1.4 million cubic meters (1.7 million cubic yards) of Deep Mixing to a depth of up to 20.5 meters (67 feet), consisting of over 17,000 elements. Eight deep mixing rigs were utilized: three double axis Trevi Turbo Mix rigs (TTM), two single axis TTM rigs, and three double axis CI-CMC rigs. Eight batch plants were used to prepare the grout using over 417,000 tons (460,000 short tons) of slag/cement binder. The work was accomplished within an aggressive schedule by working 24 hours per day, 5.5 days per week. The US Army Corps of Engineers (USACE), using the early contractor involvement (ECI) process, developed a stringent set of specifications in order to ensure a quality product was installed. The drill rigs were equipped with innovative electronic control and logging devices in order to record all pertinent parameters of each element, as well as many other different functions described in this paper. Quality Control of the installation process was continually monitored by examining these records, monitoring the grout produced at each batch plant, and coring over 10,000 linear meters (34,000 feet) of three inch and four inch diameter core. The USACE implemented an extensive Quality Assurance program to monitor the entire deep mixing process, which included independent testing to confirm the Quality Control test results. This paper describes the materials, equipment, methods of construction, and Quality Control procedures that were applied to overcome the tremendous technical and logistical challenges to successfully complete this project.
- 17 August 2012
- Published by American Society of Civil Engineers (ASCE)
- p. 682-693
Construction Operations and Quality Control of Deep Mixing at Levee LPV111 New Orleans
Deep Mixing (DMM) for the LPV-111 Levee in New Orleans presented many Quality Control and logistical challenges. The project consists of approximately 1.4 million cubic meters (1.7 million cubic yards) of Deep Mixing to a depth of up to 20.5 meters (67 feet), consisting of over 17,000 elements. Eight deep mixing rigs were utilized: three double axis Trevi Turbo Mix rigs (TTM), two single axis TTM rigs, and three double axis CI-CMC rigs. Eight batch plants were used to prepare the grout using over 417,000 tons (460,000 short tons) of slag/cement binder. The work was accomplished within an aggressive schedule by working 24 hours per day, 5.5 days per week. The US Army Corps of Engineers (USACE), using the early contractor involvement (ECI) process, developed a stringent set of specifications in order to ensure a quality product was installed. The drill rigs were equipped with innovative electronic control and logging devices in order to record all pertinent parameters of each element, as well as many other different functions described in this paper. Quality Control of the installation process was continually monitored by examining these records, monitoring the grout produced at each batch plant, and coring over 10,000 linear meters (34,000 feet) of three inch and four inch diameter core. The USACE implemented an extensive Quality Assurance program to monitor the entire deep mixing process, which included independent testing to confirm the Quality Control test results. This paper describes the materials, equipment, methods of construction, and Quality Control procedures that were applied to overcome the tremendous technical and logistical challenges to successfully complete this project.
- 17 August 2012
- Published by American Society of Civil Engineers (ASCE)
- p. 694-705
Bench-Scale Testing and QC/QA Testing for Deep Mixing at Levee LPV 111
The Deep Mixing Method (DMM) was selected at the LPV 111 Project to improve the adverse geotechnical properties of the foundation soil and consequently stabilize and support the burden of the new levee. DMM was executed with two different technologies: Trevi Turbo Mix (TTM) and Contrivance Innovation Cement Mixing Columns (CI-CMC). DMM entails the in-situ mixing of soil with an established amount of cement binder. A preliminary laboratory program (Bench-Scale Test, 4 phases) and a field test program (Validation Tests, 5+ phases) were conducted to estimate the appropriate binder type and dosage and the most effective equipment configuration. The outcome of the various phases guided the design of the grout mixes and the installation parameters for the several field test zones that were performed prior to and during production mixing at LPV 111. Comparative analyses and interpretations between the various lab and field stages, along with accumulated information about soil properties and QC results, allowed fine-tuning of the production parameters throughout almost the entire project. The required quality control/quality assurance (QC/QA) testing program for the LPV 111 project was massive: over 500 core holes (3% of total elements) were drilled and over 5,000 specimens were tested to determine unconfined compressive strength and uniformity of the DMM elements. All data were recorded, analyzed, and interpreted to provide a high quality end product, to demonstrate compliance with the project specifications and to provide a valuable reference for future deep mixing projects.
- 17 August 2012
- Published by American Society of Civil Engineers (ASCE)
- p. 694-705
Bench-Scale Testing and QC/QA Testing for Deep Mixing at Levee LPV 111
The Deep Mixing Method (DMM) was selected at the LPV 111 Project to improve the adverse geotechnical properties of the foundation soil and consequently stabilize and support the burden of the new levee. DMM was executed with two different technologies: Trevi Turbo Mix (TTM) and Contrivance Innovation Cement Mixing Columns (CI-CMC). DMM entails the in-situ mixing of soil with an established amount of cement binder. A preliminary laboratory program (Bench-Scale Test, 4 phases) and a field test program (Validation Tests, 5+ phases) were conducted to estimate the appropriate binder type and dosage and the most effective equipment configuration. The outcome of the various phases guided the design of the grout mixes and the installation parameters for the several field test zones that were performed prior to and during production mixing at LPV 111. Comparative analyses and interpretations between the various lab and field stages, along with accumulated information about soil properties and QC results, allowed fine-tuning of the production parameters throughout almost the entire project. The required quality control/quality assurance (QC/QA) testing program for the LPV 111 project was massive: over 500 core holes (3% of total elements) were drilled and over 5,000 specimens were tested to determine unconfined compressive strength and uniformity of the DMM elements. All data were recorded, analyzed, and interpreted to provide a high quality end product, to demonstrate compliance with the project specifications and to provide a valuable reference for future deep mixing projects.