Latest Publications
- 1 May 2018
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 34 (3)
Empirical Identification and Evaluation of Risk in Highway Project Delivery Methods
The highway industry currently uses three fundamental delivery methods, design-bid-build (D-B-B), design-build (D-B), and construction manager/general contractor (CM/GC), to deliver transportation projects. Selecting an appropriate project delivery method is a complex decision and often fraught with risk and uncertainty. This article presents the results of a two-tiered approach to evaluating the impacts of risks and uncertainties on project delivery selection in highway projects. Tier 1 involved identifying and verifying 31 risk factors related to project delivery based on the responses of experts with an average of 25 years of relevant experience. Tier 2 involved an empirical evaluation of project delivery risks through the analysis of 274 completed highway projects (122 D-B-B, 118 D-B, and 34 CM/GC) collected from 26 transportation agencies. The risk score of each risk factor was determined. The Cronbach’s alpha test and correlation analysis were conducted to verify the internal consistency, interdependency, and reliability of delivery risk factors. The results showed that the following eight risk factors substantially impact the project delivery decision: (1) delays in completing in railroad agreements, (2) project complexity, (3) uncertainty in geotechnical investigation, (4) delays in a right-of-way (ROW) process, (5) unexpected utility encounter, (6) work-zone traffic control, (7) challenges to obtaining environmental documentation, and (8) delays in delivery schedules. These eight risk factors are discussed in detail using the content analysis of Tier 1 and the relevant literature. Highway agencies and other practitioners can use these risk factors to make more effective and defensible decisions on which delivery method is the most suitable for their transportation projects.
- 1 May 2018
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 34 (3)
Empirical Identification and Evaluation of Risk in Highway Project Delivery Methods
The highway industry currently uses three fundamental delivery methods, design-bid-build (D-B-B), design-build (D-B), and construction manager/general contractor (CM/GC), to deliver transportation projects. Selecting an appropriate project delivery method is a complex decision and often fraught with risk and uncertainty. This article presents the results of a two-tiered approach to evaluating the impacts of risks and uncertainties on project delivery selection in highway projects. Tier 1 involved identifying and verifying 31 risk factors related to project delivery based on the responses of experts with an average of 25 years of relevant experience. Tier 2 involved an empirical evaluation of project delivery risks through the analysis of 274 completed highway projects (122 D-B-B, 118 D-B, and 34 CM/GC) collected from 26 transportation agencies. The risk score of each risk factor was determined. The Cronbach’s alpha test and correlation analysis were conducted to verify the internal consistency, interdependency, and reliability of delivery risk factors. The results showed that the following eight risk factors substantially impact the project delivery decision: (1) delays in completing in railroad agreements, (2) project complexity, (3) uncertainty in geotechnical investigation, (4) delays in a right-of-way (ROW) process, (5) unexpected utility encounter, (6) work-zone traffic control, (7) challenges to obtaining environmental documentation, and (8) delays in delivery schedules. These eight risk factors are discussed in detail using the content analysis of Tier 1 and the relevant literature. Highway agencies and other practitioners can use these risk factors to make more effective and defensible decisions on which delivery method is the most suitable for their transportation projects.
- 29 March 2018
- Published by American Society of Civil Engineers (ASCE)
- p. 418-427
A Bayesian Network Approach to Selecting Project Delivery Methods
Highway agencies are often required to make crucial decisions in early stages of the project development process. One of these decisions is selecting an appropriate project delivery method (PDM). Currently, highway agencies have been using three fundamental PDMs, including design-bid-build (D-B-B), design-build (D-B), and construction manager/general contractor (CM/GC). No single PDM is suitable for all types/conditions of highway construction, but there exists a delivery method that is optimal for a given project. This paper presents a Bayesian network (BN) approach to selecting a suitable PDM. The model was developed based on three phases: (1) data collection and preparation, (2) BN-based model development, and (3) model testing and validation. The data used to develop the model included 177 highway projects completed from 2004 to 2015. The model variables included risk profile, project attributes, project complexity, cost, and time factors. The model development involves determining interrelationships among these variables. The expected outcome of the model includes probabilistic inferences associated with each delivery method (D-B-B, D-B, and CM/GC). The BN-based model was tested and validated using a k-fold cross validation technique. The results indicate that the proposed model has an average precision of 91.5% and an average reliability of 91.0%. The findings of this paper contribute to theory by first introducing the BN-based approach to project delivery literature. The findings from this paper also help practitioners quantitatively select the most suitable delivery method for their projects.
- 29 March 2018
- Published by American Society of Civil Engineers (ASCE)
- p. 418-427
A Bayesian Network Approach to Selecting Project Delivery Methods
Highway agencies are often required to make crucial decisions in early stages of the project development process. One of these decisions is selecting an appropriate project delivery method (PDM). Currently, highway agencies have been using three fundamental PDMs, including design-bid-build (D-B-B), design-build (D-B), and construction manager/general contractor (CM/GC). No single PDM is suitable for all types/conditions of highway construction, but there exists a delivery method that is optimal for a given project. This paper presents a Bayesian network (BN) approach to selecting a suitable PDM. The model was developed based on three phases: (1) data collection and preparation, (2) BN-based model development, and (3) model testing and validation. The data used to develop the model included 177 highway projects completed from 2004 to 2015. The model variables included risk profile, project attributes, project complexity, cost, and time factors. The model development involves determining interrelationships among these variables. The expected outcome of the model includes probabilistic inferences associated with each delivery method (D-B-B, D-B, and CM/GC). The BN-based model was tested and validated using a k-fold cross validation technique. The results indicate that the proposed model has an average precision of 91.5% and an average reliability of 91.0%. The findings of this paper contribute to theory by first introducing the BN-based approach to project delivery literature. The findings from this paper also help practitioners quantitatively select the most suitable delivery method for their projects.