Yadong Qi
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Yadong Qi has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Junlei Wang
PetroChina Research Institute of Petroleum Exploration & Development, Beijing 100083, China
2 shared publications - Yunsheng Wei
PetroChina Research Institute of Petroleum Exploration & Development, Beijing 100083, China
2 shared publications Ailin Jia
PetroChina Research Institute of Petroleum Exploration and Development, Department of Gasfield Development, Beijing 100083, China
1 shared publication- Ailin Jia
Research Institute of Petroleum Exploration and Development, PetroChina, Beijing 100083, China
1 shared publication - Chao Luo
Chongqing University of Science & Technology, Chongqing, CHINA
1 shared publication Cheng Liu
Department of Gasfield Development, PetroChina Zhejiang Oilfield Company, Hangzhou 211762, Zhejiang, China
1 shared publication
Latest Publications
- 25 November 2020
- Published by Wiley in Journal of Energy Resources Technology
- Vol. 143 (8) , 1-11
Optimization of Managed Drawdown for a Well With Stress-Sensitive Conductivity Fractures: Workflow and Case Study
The effect of bottomhole-pressure (BHP) drawdown schedule on the well performance is generally attributed to the stress sensitivity in propped finite-conductivity fractures. The purpose of this work is to develop a detailed workflow of optimizing BHP drawdown schedule to improve long-term performance by finding a tradeoff between delaying conductivity degradation and maintaining drawdown. First, according to experimental data of propped fracture, an alternative relationship between conductivity and pressure drawdown is developed to mimic the change of fracture conductivity with effective stress. Second, based on the dimension-transformation technique, the coupled fracture-reservoir model is semi-analytically solved and seamlessly generates the time-dependent equation (i.e., transient inflow performance relationship (IPR)) which provides the production rate response to any BHP variation. Next, the value of BHP on the reversal behavior of rate is defined as the optimum BHP on the specified time-dependent IPR, and then the optimum profile of BHP drawdown over time is achieved. Finally, we corroborate the effectiveness of this workflow with a field case from Zhaotong shale in China. Field case substantiates that (1) the well with restricted drawdown has more advantage of improving the performance than that with unrestricted drawdown and (2) after inputting the optimum BHP drawdown into the history-unrestricted case, the long-term cumulative gas production could indeed be increased.
- 25 November 2020
- Published by Wiley in Journal of Energy Resources Technology
- Vol. 143 (8) , 1-11
Optimization of Managed Drawdown for a Well With Stress-Sensitive Conductivity Fractures: Workflow and Case Study
The effect of bottomhole-pressure (BHP) drawdown schedule on the well performance is generally attributed to the stress sensitivity in propped finite-conductivity fractures. The purpose of this work is to develop a detailed workflow of optimizing BHP drawdown schedule to improve long-term performance by finding a tradeoff between delaying conductivity degradation and maintaining drawdown. First, according to experimental data of propped fracture, an alternative relationship between conductivity and pressure drawdown is developed to mimic the change of fracture conductivity with effective stress. Second, based on the dimension-transformation technique, the coupled fracture-reservoir model is semi-analytically solved and seamlessly generates the time-dependent equation (i.e., transient inflow performance relationship (IPR)) which provides the production rate response to any BHP variation. Next, the value of BHP on the reversal behavior of rate is defined as the optimum BHP on the specified time-dependent IPR, and then the optimum profile of BHP drawdown over time is achieved. Finally, we corroborate the effectiveness of this workflow with a field case from Zhaotong shale in China. Field case substantiates that (1) the well with restricted drawdown has more advantage of improving the performance than that with unrestricted drawdown and (2) after inputting the optimum BHP drawdown into the history-unrestricted case, the long-term cumulative gas production could indeed be increased.
- Open Access
- 29 August 2018
- Published by IntechOpen
Current Technologies and Prospects of Shale Gas Development in China
Shale gas in China has realized the great-leap-forward development because of the significant strides of development technique for marine shale resource, becoming the second largest shale gas producer only to the USA. Benefits from the progress of technique advance, a complete technique series for the development of shale resource buried less than 3500 m has been established by operating technique research and field trail, including five main key techniques of geological evaluation, optimum and fast drilling, multistage hydraulic fracturing, productivity evaluation, and development parameters optimization. At present, shale resource in China has not been fully exploited besides the marine shale resource (<3500 m). It would be the future development trend to enhance ultimate recovery of shale gas (3500 m). With the further process of development technique for marine shale, shale gas is expected to the single type of gas reservoir contributing to the highest annual production rate in the near future. Therefore, based on the success in shale industry, this work is organized by reviewing the advances and challenges of current evaluation techniques, and then discussing the possible development trend of shale gas performance evaluation in the future.
- 29 August 2018
- Published by IntechOpen
Open AccessCurrent Technologies and Prospects of Shale Gas Development in China
Shale gas in China has realized the great-leap-forward development because of the significant strides of development technique for marine shale resource, becoming the second largest shale gas producer only to the USA. Benefits from the progress of technique advance, a complete technique series for the development of shale resource buried less than 3500 m has been established by operating technique research and field trail, including five main key techniques of geological evaluation, optimum and fast drilling, multistage hydraulic fracturing, productivity evaluation, and development parameters optimization. At present, shale resource in China has not been fully exploited besides the marine shale resource (<3500 m). It would be the future development trend to enhance ultimate recovery of shale gas (3500 m). With the further process of development technique for marine shale, shale gas is expected to the single type of gas reservoir contributing to the highest annual production rate in the near future. Therefore, based on the success in shale industry, this work is organized by reviewing the advances and challenges of current evaluation techniques, and then discussing the possible development trend of shale gas performance evaluation in the future.