Gwo-Liang Liao
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Gwo-Liang Liao has a total of 13 co-authors. Here are the top co-authors by number of shared publications:
Shey-Huei Sheu
Department of Statistics and Informatics Science, Providence University, 200 Chung Chi Rd., Taichung 43301, Taiwan, ROC
4 shared publications- Li-Chun Liao
Department of Electrical Engineering, Fu Jen Catholic University, 510 Zhongzheng Road., Xinzhuang District, New Taipei City, Taiwan, R.O.C.
3 shared publications Bor-Ling Shaw
Department of Industrial Management, China Institute of Technology, 245, Yen-Chiu-Yuan(ACADEMIA)Road, Section 3, Nankang, Taipei, Taiwan, ROC
2 shared publicationsWen-Hsin Chiang
Department of Information Science and Management Systems, National Taitung University, 369, Section 2 University Road., Taitung, Taiwan, R.O.C.
2 shared publicationsYuh-Bin Lin
Department of Industrial Management, National Taiwan University of Science and Technology, 43 Keelung Road, Section 4, Taipei, Taiwan, ROC
2 shared publications- Chen-Yu Huang
Medical Physics Department, Hong Kong Sanatorium and Hospital, Hong Kong, China
1 shared publication
Latest Publications
- 13 October 2025
- Published by World Scientific Pub Co Pte Ltd in International Journal of Software Engineering and Knowledge Engineering
- Vol. 35 (12) , 1811-1832
Imperfect Debugging Software Reliability Model with Exponential and Linear Characteristics
This study aims to develop two generalized software reliability growth models (SRGMs) based on the non-homogeneous Poisson process (NHPP), considering the potential for imperfect debugging. The proposed models integrate both exponential and linear characteristics into the fault content function while accounting for varying fault detection rates. Additionally, numerical examples are provided to validate the effectiveness of the proposed models and compare their performance with existing ones. The results indicate that the proposed models offer more accurate prediction capabilities.
- 13 October 2025
- Published by World Scientific Pub Co Pte Ltd in International Journal of Software Engineering and Knowledge Engineering
- Vol. 35 (12) , 1811-1832
Imperfect Debugging Software Reliability Model with Exponential and Linear Characteristics
This study aims to develop two generalized software reliability growth models (SRGMs) based on the non-homogeneous Poisson process (NHPP), considering the potential for imperfect debugging. The proposed models integrate both exponential and linear characteristics into the fault content function while accounting for varying fault detection rates. Additionally, numerical examples are provided to validate the effectiveness of the proposed models and compare their performance with existing ones. The results indicate that the proposed models offer more accurate prediction capabilities.
- 18 September 2025
- Published by World Scientific Pub Co Pte Ltd in International Journal of Reliability, Quality and Safety Engineering
- Vol. 33 (01)
Optimal Policy for Scheduled Production Run Time of Economic Production Quantity Model Involving Major Repair and Preventive Maintenance
This study introduces an integrated economic production quantity (EPQ) model incorporating preventive maintenance (PM) policies for an imperfect process with an increasing hazard rate. Determining the production run length hinges on either the scheduled production run time or the time to failure during each production run, whichever occurs first. Post-failure, the system undertakes major repair activities. After each PM, the system assumes either an imperfect or perfect state, with the probability of achieving a perfect PM dependent on the number of imperfect maintenance operations since the last renewal cycle. Mathematical formulas are derived to calculate the expected total cost. The discussion revolves around the scheduled production run time that minimizes total cost while increasing resource efficiency within the EPQ model. The study explores different scenarios, including the maintenance learning effect. Finally, the paper presents a numerical example of how PM, setup, rework, major repair and holding costs impact the system.
- 18 September 2025
- Published by World Scientific Pub Co Pte Ltd in International Journal of Reliability, Quality and Safety Engineering
- Vol. 33 (01)
Optimal Policy for Scheduled Production Run Time of Economic Production Quantity Model Involving Major Repair and Preventive Maintenance
This study introduces an integrated economic production quantity (EPQ) model incorporating preventive maintenance (PM) policies for an imperfect process with an increasing hazard rate. Determining the production run length hinges on either the scheduled production run time or the time to failure during each production run, whichever occurs first. Post-failure, the system undertakes major repair activities. After each PM, the system assumes either an imperfect or perfect state, with the probability of achieving a perfect PM dependent on the number of imperfect maintenance operations since the last renewal cycle. Mathematical formulas are derived to calculate the expected total cost. The discussion revolves around the scheduled production run time that minimizes total cost while increasing resource efficiency within the EPQ model. The study explores different scenarios, including the maintenance learning effect. Finally, the paper presents a numerical example of how PM, setup, rework, major repair and holding costs impact the system.
- 3 July 2025
- Published by World Scientific Pub Co Pte Ltd in Journal of Advanced Manufacturing Systems
- Vol. 25 (04) , 645-664
Optimal Production Policies for Imperfect Processes with Repair, Rework, Outsourcing and Preventive Maintenance
This study integrates maintenance and production programs into the economic production quantity (EPQ) model for an imperfect process characterized by a deteriorating production system with an increasing hazard rate. Perfect repair and rework procedures are implemented following a production run failure. In such an imperfect process, defective items are produced and reworked and some are rejected after rework. The study evaluates the conditions of an EPQ model involving outsourcing to compensate for production shortfalls caused by waste products during reworking. Preventive maintenance (PM) is conducted after the “controlled” production phase and is categorized into renewal and regular PM. The probability of renewal PM is influenced by the number of regular PMs performed since the last system update cycle. The EPQ model is thus developed to determine the optimal production run time by minimizing total costs. Various cases are explored. A numerical example and sensitivity analysis will be presented to illustrate the model’s effectiveness. The findings indicate that enhancing maintenance capabilities can significantly lower production costs. Implementing a PM program contributes to a more efficient production system operation.
- 3 July 2025
- Published by World Scientific Pub Co Pte Ltd in Journal of Advanced Manufacturing Systems
- Vol. 25 (04) , 645-664
Optimal Production Policies for Imperfect Processes with Repair, Rework, Outsourcing and Preventive Maintenance
This study integrates maintenance and production programs into the economic production quantity (EPQ) model for an imperfect process characterized by a deteriorating production system with an increasing hazard rate. Perfect repair and rework procedures are implemented following a production run failure. In such an imperfect process, defective items are produced and reworked and some are rejected after rework. The study evaluates the conditions of an EPQ model involving outsourcing to compensate for production shortfalls caused by waste products during reworking. Preventive maintenance (PM) is conducted after the “controlled” production phase and is categorized into renewal and regular PM. The probability of renewal PM is influenced by the number of regular PMs performed since the last system update cycle. The EPQ model is thus developed to determine the optimal production run time by minimizing total costs. Various cases are explored. A numerical example and sensitivity analysis will be presented to illustrate the model’s effectiveness. The findings indicate that enhancing maintenance capabilities can significantly lower production costs. Implementing a PM program contributes to a more efficient production system operation.
- 1 September 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Design and Implementation of a Caterpillar Robot
This paper proposed a low cost worm-shape robot that can mimic the locomotion of a caterpillar to crawl by arching and stretching its body. Based on the process of implementing the caterpillar robot, the participated students can built up their interdisciplinary skills. Students have to integrate the technologies of micro-controllers, sensors, materials and mechanisms. We used a Motoduino U1 module to drive 4 servomotors and Bluetooth module to communicate between robot and users. In order to imitate gaits of caterpillars, the body of the robot was made by using discrete PVC rings to flexibly arch. The robot also can be remotely controlled to crawl forward/back or right/left, and change its height of arched back. The weight and total length of the robot were bout 470g and 65cm, respectively. The experiment shows that when the caterpillar robot moves in line, the averaged speed of robot can be 25m/hr. The maximum rotating angle is 30° and the minimum rotating diameter is 120cm.
- 1 September 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Design and Implementation of a Caterpillar Robot
This paper proposed a low cost worm-shape robot that can mimic the locomotion of a caterpillar to crawl by arching and stretching its body. Based on the process of implementing the caterpillar robot, the participated students can built up their interdisciplinary skills. Students have to integrate the technologies of micro-controllers, sensors, materials and mechanisms. We used a Motoduino U1 module to drive 4 servomotors and Bluetooth module to communicate between robot and users. In order to imitate gaits of caterpillars, the body of the robot was made by using discrete PVC rings to flexibly arch. The robot also can be remotely controlled to crawl forward/back or right/left, and change its height of arched back. The weight and total length of the robot were bout 470g and 65cm, respectively. The experiment shows that when the caterpillar robot moves in line, the averaged speed of robot can be 25m/hr. The maximum rotating angle is 30° and the minimum rotating diameter is 120cm.
- 25 August 2016
- Published by World Scientific Pub Co Pte Ltd in International Journal of Reliability, Quality and Safety Engineering
- Vol. 23 (04)
Optimum Maintenance Strategy of a Repairable System Under Long-Term Free Preventive Maintenance Warranty with Predicted Maintenance
In this paper, the optimum user’s maintenance strategy of a repairable system for free preventive maintenance (PM) warranty policy is proposed. This study considers predicted maintenance due to the system failure is likely occurring and requires repair during periodic maintenance time. Periodic maintenance can be classified as one of three types — imperfect PM, perfect PM and predicted maintenance. The probability that periodic maintenance is perfect PM or predicted maintenance depends on the number of imperfect maintenance operations conducted since the previous renewal cycle. The sellers offer free perfect and imperfect PM warranty. An optimal periodic maintenance time is determined by minimizing the total cost. Some special cases, implemented with machine learning and human learning, are given to demonstrate the feasibility of the proposed strategy. A numerical example is given.
- 25 August 2016
- Published by World Scientific Pub Co Pte Ltd in International Journal of Reliability, Quality and Safety Engineering
- Vol. 23 (04)
Optimum Maintenance Strategy of a Repairable System Under Long-Term Free Preventive Maintenance Warranty with Predicted Maintenance
In this paper, the optimum user’s maintenance strategy of a repairable system for free preventive maintenance (PM) warranty policy is proposed. This study considers predicted maintenance due to the system failure is likely occurring and requires repair during periodic maintenance time. Periodic maintenance can be classified as one of three types — imperfect PM, perfect PM and predicted maintenance. The probability that periodic maintenance is perfect PM or predicted maintenance depends on the number of imperfect maintenance operations conducted since the previous renewal cycle. The sellers offer free perfect and imperfect PM warranty. An optimal periodic maintenance time is determined by minimizing the total cost. Some special cases, implemented with machine learning and human learning, are given to demonstrate the feasibility of the proposed strategy. A numerical example is given.
- 26 July 2016
- Published by Taylor & Francis in International Journal of Systems Science: Operations & Logistics
- Vol. 5 (1) , 87-98
Production and maintenance strategy for a high-reliability imperfect process with free-repair warranty
Manufacturers have increasingly emphasised improving process performance and equipment effectiveness in their routine operations. Therefore, this paper integrates maintenance, production, reliability and free-repair warranty (FRW) programs into an economic production quantity model of an imperfect process with an increasing hazard rate. Such a production system should be periodically inspected and maintained to retain a reliability value higher than a prespecified value r. The system is replaced following an out-of-control production run period or when the reliability falls below r. If the production run period is in the out-of-control state, then the defective items are reworked. In this paper, an inferior item is defined as an item that satisfies specifications during inspection but is likely to incur postsale servicing costs when sold under FRW. Reworked items are assumed to incur a higher postsale servicing cost than do defect-free items. The optimal N and lot size that minimise the total cost are discussed herein. Finally, a numerical example is presented to illustrate the model.
- 26 July 2016
- Published by Taylor & Francis in International Journal of Systems Science: Operations & Logistics
- Vol. 5 (1) , 87-98
Production and maintenance strategy for a high-reliability imperfect process with free-repair warranty
Manufacturers have increasingly emphasised improving process performance and equipment effectiveness in their routine operations. Therefore, this paper integrates maintenance, production, reliability and free-repair warranty (FRW) programs into an economic production quantity model of an imperfect process with an increasing hazard rate. Such a production system should be periodically inspected and maintained to retain a reliability value higher than a prespecified value r. The system is replaced following an out-of-control production run period or when the reliability falls below r. If the production run period is in the out-of-control state, then the defective items are reworked. In this paper, an inferior item is defined as an item that satisfies specifications during inspection but is likely to incur postsale servicing costs when sold under FRW. Reworked items are assumed to incur a higher postsale servicing cost than do defect-free items. The optimal N and lot size that minimise the total cost are discussed herein. Finally, a numerical example is presented to illustrate the model.
- 30 June 2016
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 54 (20) , 6265-6280
Optimal economic production quantity policy for a parallel system with repair, rework, free-repair warranty and maintenance
Hot standby redundancy maintains the working order of a system, repairs offer restoration in case of failure, and preventive maintenance (PM) prevents trouble. Warranties provide assurance to customers, and a superior warranty signifies higher product quality. The running costs of redundancy, maintenance and warranties influence decisions during product manufacture. Therefore, this paper presents an economic production quantity (EPQ) model for a parallel system with maintenance, production, and free-repair warranty (FRW) programmes. The production system begins with a basic unit and produces conforming items. PM is performed after the production run period and is classified as imperfect or perfect. If the basic unit fails, it is repaired and returned to operation after perfect PM; the spare unit is online only during the repair time of the basic unit. The spare will produce some number of defective goods, which are reworked in the same inventory cycle. The hot spare is minimally repaired if it fails in its standby or online mode. In this study, an inferior item is defined as one that satisfies specifications on inspection and is usable but is likely to incur postsale servicing costs when sold under an FRW. The total cost of this EPQ model includes setup, holding, PM, restoration, minimal repair, and warranty costs. The optimal production runtime is determined by minimising the total cost. Several cases are discussed in this paper, and the proposed model is illustrated using a numerical example and sensitivity.
- 30 June 2016
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 54 (20) , 6265-6280
Optimal economic production quantity policy for a parallel system with repair, rework, free-repair warranty and maintenance
Hot standby redundancy maintains the working order of a system, repairs offer restoration in case of failure, and preventive maintenance (PM) prevents trouble. Warranties provide assurance to customers, and a superior warranty signifies higher product quality. The running costs of redundancy, maintenance and warranties influence decisions during product manufacture. Therefore, this paper presents an economic production quantity (EPQ) model for a parallel system with maintenance, production, and free-repair warranty (FRW) programmes. The production system begins with a basic unit and produces conforming items. PM is performed after the production run period and is classified as imperfect or perfect. If the basic unit fails, it is repaired and returned to operation after perfect PM; the spare unit is online only during the repair time of the basic unit. The spare will produce some number of defective goods, which are reworked in the same inventory cycle. The hot spare is minimally repaired if it fails in its standby or online mode. In this study, an inferior item is defined as one that satisfies specifications on inspection and is usable but is likely to incur postsale servicing costs when sold under an FRW. The total cost of this EPQ model includes setup, holding, PM, restoration, minimal repair, and warranty costs. The optimal production runtime is determined by minimising the total cost. Several cases are discussed in this paper, and the proposed model is illustrated using a numerical example and sensitivity.
- 21 August 2015
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Systems, Man, and Cybernetics: Systems
- Vol. 46 (8) , 1129-1139
Production and Maintenance Policies for an EPQ Model With Perfect Repair, Rework, Free-Repair Warranty, and Preventive Maintenance
Manufacturers increasingly emphasize improving product reliability and ensuring product uniformity; these two factors have become critical aspects of industrial activities. This paper describes an economic production quantity model with maintenance, production, and free-repair warranty (FRW) programs for an imperfect process. When defective parts are produced, perfect repair, inspection, and rework are conducted after the production run period. For a deteriorating production system, this paper defines an inferior item as satisfying specifications on each inspection but being likely to incur post-sale servicing costs when sold under FRW. Preventive maintenance (PM) is performed after the “in-control” production run period and can be classified as one of two types: 1) imperfect or 2) perfect. The probability of a perfect PM is calculated based on the number of imperfect PMs from the last renewal cycle. An optimal production runtime is determined by minimizing the total cost. Several special cases are discussed, including the case of maintenance learning effect. Finally, a numerical example and sensitivity analysis are reported to illustrate the model.
- 21 August 2015
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Systems, Man, and Cybernetics: Systems
- Vol. 46 (8) , 1129-1139
Production and Maintenance Policies for an EPQ Model With Perfect Repair, Rework, Free-Repair Warranty, and Preventive Maintenance
Manufacturers increasingly emphasize improving product reliability and ensuring product uniformity; these two factors have become critical aspects of industrial activities. This paper describes an economic production quantity model with maintenance, production, and free-repair warranty (FRW) programs for an imperfect process. When defective parts are produced, perfect repair, inspection, and rework are conducted after the production run period. For a deteriorating production system, this paper defines an inferior item as satisfying specifications on each inspection but being likely to incur post-sale servicing costs when sold under FRW. Preventive maintenance (PM) is performed after the “in-control” production run period and can be classified as one of two types: 1) imperfect or 2) perfect. The probability of a perfect PM is calculated based on the number of imperfect PMs from the last renewal cycle. An optimal production runtime is determined by minimizing the total cost. Several special cases are discussed, including the case of maintenance learning effect. Finally, a numerical example and sensitivity analysis are reported to illustrate the model.
- 1 December 2013
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 111-115
Optimal scheduling problem for Taiwan's post office counters and manpower
In this study, we develop several models that combine with queuing theory in order to help a post office to solve the optimization of staff numbers at services counters comply with practical demands. The models are formulated using linear programming. A numerical example is presented to illustrate the models and the solution method using real data from a post office in eastern Taiwan. Analytical results indicate that the proposed models are efficient in improving service efficiency and customer satisfaction, and can be a reference for practical manpower allocation in the post office.
- 1 December 2013
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 111-115
Optimal scheduling problem for Taiwan's post office counters and manpower
In this study, we develop several models that combine with queuing theory in order to help a post office to solve the optimization of staff numbers at services counters comply with practical demands. The models are formulated using linear programming. A numerical example is presented to illustrate the models and the solution method using real data from a post office in eastern Taiwan. Analytical results indicate that the proposed models are efficient in improving service efficiency and customer satisfaction, and can be a reference for practical manpower allocation in the post office.
- 1 September 2013
- Published by Taylor & Francis in International Journal of Systems Science
- Vol. 44 (9) , 1602-1612
Optimal economic production quantity policy for randomly failing process with minimal repair, backorder and preventive maintenance
This study examines the feasibility of using an economic production quantity (EPQ) model incorporating maintenance and production programs to model an imperfect process involving a deteriorating production system. In response to failure, defective parts were produced and minimal repairs performed to create an in-control state. The conditions are studied in the case of the EPQ model undergoing a backorder owing to rejection of defective parts after a failure. Following production run period, two types of periodic preventive maintenance (PM) exist: imperfect and perfect. The probability of perfect PM being performed depends on the number of imperfect PM performed since the last renewal cycle. For the EPQ model, the optimal run time for minimising the total cost is discussed. Various special cases are considered, including the PM learning effect. Finally, this investigation presents a numerical example to illustrate the effects of PM ability, repair cost and defect number on total costs and production period. This study finds that enhancing maintenance ability reduces production related costs. The product system can be produced more efficiently using a PM program.
- 1 September 2013
- Published by Taylor & Francis in International Journal of Systems Science
- Vol. 44 (9) , 1602-1612
Optimal economic production quantity policy for randomly failing process with minimal repair, backorder and preventive maintenance
This study examines the feasibility of using an economic production quantity (EPQ) model incorporating maintenance and production programs to model an imperfect process involving a deteriorating production system. In response to failure, defective parts were produced and minimal repairs performed to create an in-control state. The conditions are studied in the case of the EPQ model undergoing a backorder owing to rejection of defective parts after a failure. Following production run period, two types of periodic preventive maintenance (PM) exist: imperfect and perfect. The probability of perfect PM being performed depends on the number of imperfect PM performed since the last renewal cycle. For the EPQ model, the optimal run time for minimising the total cost is discussed. Various special cases are considered, including the PM learning effect. Finally, this investigation presents a numerical example to illustrate the effects of PM ability, repair cost and defect number on total costs and production period. This study finds that enhancing maintenance ability reduces production related costs. The product system can be produced more efficiently using a PM program.