Diana Hun
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Diana Hun has a total of 129 co-authors. Here are the top co-authors by number of shared publications:
- Som Shrestha
Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States). Building Technologies Research and Integration Center (BTRIC)
15 shared publications - Bryan P. Maldonado
Buildings and Transportation Science Division Oak Ridge National Laboratory United States of America
6 shared publications - Nolan W. Hayes
Buildings and Transportation Science Division Oak Ridge National Laboratory United States of America
5 shared publications - Tianli Feng
University of Utah
5 shared publications - Mikael Salonvaara
Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States)
4 shared publications - Yifang Liu
Buildings and Transportation Science Division Oak Ridge National Laboratory United States of America
4 shared publications
Latest Publications
- 1 September 2026
- Published by American Society of Civil Engineers (ASCE) in Journal of Computing in Civil Engineering
- Vol. 40 (5)
Lab-Scale Cable-Driven Parallel Robot Prototype for Automated Prefabricated Component Manipulation
- 1 September 2026
- Published by American Society of Civil Engineers (ASCE) in Journal of Computing in Civil Engineering
- Vol. 40 (5)
Lab-Scale Cable-Driven Parallel Robot Prototype for Automated Prefabricated Component Manipulation
- 8 April 2026
- Published by Elsevier in Journal of Building Engineering
- Vol. 125
Multiscale characterization of phase change materials for building thermal energy storage applications
- 8 April 2026
- Published by Elsevier in Journal of Building Engineering
- Vol. 125
Multiscale characterization of phase change materials for building thermal energy storage applications
- Open Access
- 27 July 2025
- Published by International Association for Automation and Robotics in Construction (IAARC) in Proceedings of the 37th International Symposium on Automation and Robotics in Construction (isarc)
- Vol. 2025 Proce, 1129-1136
Automated segmentation and analysis of point clouds of pier foundations using Pier Inspection and Evaluation Report (PIER)
Pier foundations are commonly used in locations with unstable soil or where other types of foundations are unsuitable or cost prohibitive. A pier foundation consists of vertical columns to support the structure and elevate it above the ground. Common materials for pier foundations include masonry, concrete, timber, and steel. The methods for accurate placement of pier foundations have remained relatively unchanged for decades. For simple installations, construction chalk lines are used to layout the locations of piers to ensure accurate placement and elevation. For more complex installations, surveying instruments operated by trained professionals are employed to accurately locate piers and assess correct elevation before construction. After installation, another survey may need to be performed to assess the quality of the as-built foundation. However, with the advent of terrestrial laser scanners (TLS), the means now exist for contractors to conduct their own assessments of as-built foundations. The major barrier preventing contractors from performing their own assessments of as-built foundation quality is the segmentation and analysis of point cloud data, a skill that often requires a trained user. The objective of this research is to develop a software tool (PIER: Pier Inspection and Evaluation Report) to enable automated segmentation and analysis of point clouds of pier foundations. In this paper, the automated segmentation and analysis algorithms are detailed. A mockup lay out of pier foundations was built using concrete masonry units, and the algorithms were tested to evaluate performance. Limitations of the current algorithms and future research direction are discussed.
- 27 July 2025
- Published by International Association for Automation and Robotics in Construction (IAARC) in Proceedings of the 37th International Symposium on Automation and Robotics in Construction (isarc)
- Vol. 2025 Proce, 1129-1136
Open AccessAutomated segmentation and analysis of point clouds of pier foundations using Pier Inspection and Evaluation Report (PIER)
Pier foundations are commonly used in locations with unstable soil or where other types of foundations are unsuitable or cost prohibitive. A pier foundation consists of vertical columns to support the structure and elevate it above the ground. Common materials for pier foundations include masonry, concrete, timber, and steel. The methods for accurate placement of pier foundations have remained relatively unchanged for decades. For simple installations, construction chalk lines are used to layout the locations of piers to ensure accurate placement and elevation. For more complex installations, surveying instruments operated by trained professionals are employed to accurately locate piers and assess correct elevation before construction. After installation, another survey may need to be performed to assess the quality of the as-built foundation. However, with the advent of terrestrial laser scanners (TLS), the means now exist for contractors to conduct their own assessments of as-built foundations. The major barrier preventing contractors from performing their own assessments of as-built foundation quality is the segmentation and analysis of point cloud data, a skill that often requires a trained user. The objective of this research is to develop a software tool (PIER: Pier Inspection and Evaluation Report) to enable automated segmentation and analysis of point clouds of pier foundations. In this paper, the automated segmentation and analysis algorithms are detailed. A mockup lay out of pier foundations was built using concrete masonry units, and the algorithms were tested to evaluate performance. Limitations of the current algorithms and future research direction are discussed.
- Open Access
- 27 July 2025
- Published by International Association for Automation and Robotics in Construction (IAARC) in Proceedings of the 37th International Symposium on Automation and Robotics in Construction (isarc)
- Vol. 2025 Proce, 1268-1275
P2P: Point Cloud to Panel Layout Optimization
Building envelope retrofits, despite their benefits on enhancing energy efficiency, progress slowly due to high operating costs. Overclad panelized systems present an attractive solution to make retrofits affordable and easy to install. However, several stages of the retrofit process remain disconnected, suboptimal, and require significant human intervention. This study aims to bridge the gap between digital twin generation and overclad panel installation by automating the design of an optimal panel layout directly from a building envelope point cloud. In this end-to-end approach, the dimensional twin is generated by segmenting the facade point cloud. The facade then undergoes a three-step process to generate an optimized panel layout for integration with automated placement systems.
- 27 July 2025
- Published by International Association for Automation and Robotics in Construction (IAARC) in Proceedings of the 37th International Symposium on Automation and Robotics in Construction (isarc)
- Vol. 2025 Proce, 1268-1275
Open AccessP2P: Point Cloud to Panel Layout Optimization
Building envelope retrofits, despite their benefits on enhancing energy efficiency, progress slowly due to high operating costs. Overclad panelized systems present an attractive solution to make retrofits affordable and easy to install. However, several stages of the retrofit process remain disconnected, suboptimal, and require significant human intervention. This study aims to bridge the gap between digital twin generation and overclad panel installation by automating the design of an optimal panel layout directly from a building envelope point cloud. In this end-to-end approach, the dimensional twin is generated by segmenting the facade point cloud. The facade then undergoes a three-step process to generate an optimized panel layout for integration with automated placement systems.
- Open Access
- 27 July 2025
- Published by International Association for Automation and Robotics in Construction (IAARC) in Proceedings of the 37th International Symposium on Automation and Robotics in Construction (isarc)
- Vol. 2025 Proce, 280-287
Integration of a real-time orientation measurement system for a real-time evaluator (RTE) to measure the position and orientation of crane-lifted components
Prefabrication of building components holds the potential to revolutionize the construction industry. Prefabrication consists of manufacturing building components, modules, and other elements in a factory to be shipped and installed on a construction site. Prefabricated components have been produced for various applications including precast concrete panels for new construction and exterior wall retrofits. The manufacturing process has seen much innovation in recent years; however, the installation process has seen minimal advancements. A real-time evaluator (RTE) was developed to reduce the installation cost of prefabricated components by reducing installation time, decreasing rework, and improving accuracy. The RTE uses off-the-shelf hardware and novel algorithms to assist erectors with component installation by measuring the real-time positions of connections and prefabricated components, providing installation guidance through a graphical user interface, and monitoring the accumulated installation errors. An overview of the RTE and the proposed workflow is presented. Previous on-site demonstrations provided valuable feedback from users on the potential areas for improvement of the system. One common request was real-time measurement of component orientation during lifting, a process that previously required that the component remain stationary while the laser tracker cycled through target prisms. This paper will present the incorporation and testing of a real-time orientation measurement system as it was implemented into the RTE, allowing for measurement of component orientation during movement.
- 27 July 2025
- Published by International Association for Automation and Robotics in Construction (IAARC) in Proceedings of the 37th International Symposium on Automation and Robotics in Construction (isarc)
- Vol. 2025 Proce, 280-287
Open AccessIntegration of a real-time orientation measurement system for a real-time evaluator (RTE) to measure the position and orientation of crane-lifted components
Prefabrication of building components holds the potential to revolutionize the construction industry. Prefabrication consists of manufacturing building components, modules, and other elements in a factory to be shipped and installed on a construction site. Prefabricated components have been produced for various applications including precast concrete panels for new construction and exterior wall retrofits. The manufacturing process has seen much innovation in recent years; however, the installation process has seen minimal advancements. A real-time evaluator (RTE) was developed to reduce the installation cost of prefabricated components by reducing installation time, decreasing rework, and improving accuracy. The RTE uses off-the-shelf hardware and novel algorithms to assist erectors with component installation by measuring the real-time positions of connections and prefabricated components, providing installation guidance through a graphical user interface, and monitoring the accumulated installation errors. An overview of the RTE and the proposed workflow is presented. Previous on-site demonstrations provided valuable feedback from users on the potential areas for improvement of the system. One common request was real-time measurement of component orientation during lifting, a process that previously required that the component remain stationary while the laser tracker cycled through target prisms. This paper will present the incorporation and testing of a real-time orientation measurement system as it was implemented into the RTE, allowing for measurement of component orientation during movement.
- Open Access
- 27 July 2025
- Published by International Association for Automation and Robotics in Construction (IAARC) in Proceedings of the 37th International Symposium on Automation and Robotics in Construction (isarc)
- Vol. 2025 Proce, 9-16
Dynamic Analysis of a Six-Cable Parallel Robot for Automated Panelized Building Retrofits
Cable-Driven Parallel Robots (CDPRs) are highly suitable for automated panelized building retrofits, thanks to their compact footprint and high payload-to-weight ratio. A common CDPR configuration featuring eight cables, where the anchors form a rectangular prism in front of the building facade, offers a large wrench feasible workspace and good control versatility. However, installing upper anchor points requires additional support structures, such as towers or beams, increasing setup complexity and posing logistical challenges in construction settings. To mitigate these challenges, we propose a six-cable CDPR model specifically designed for automated panelized building retrofits. Although the feasible workspace is limited, our analysis shows that the proposed CDPR adequately covers the critical areas required for panel installation. To validate that the six-cable system can effectively transport the end effector to the desired installation pose, we calculated optimal trajectories based on a constrained dynamic model. The simulation results of the six-cable CDPR demonstrate promising potential for automated panelized building retrofits, effectively balancing simplicity, cost-effectiveness, and functionality.
- 27 July 2025
- Published by International Association for Automation and Robotics in Construction (IAARC) in Proceedings of the 37th International Symposium on Automation and Robotics in Construction (isarc)
- Vol. 2025 Proce, 9-16
Open AccessDynamic Analysis of a Six-Cable Parallel Robot for Automated Panelized Building Retrofits
Cable-Driven Parallel Robots (CDPRs) are highly suitable for automated panelized building retrofits, thanks to their compact footprint and high payload-to-weight ratio. A common CDPR configuration featuring eight cables, where the anchors form a rectangular prism in front of the building facade, offers a large wrench feasible workspace and good control versatility. However, installing upper anchor points requires additional support structures, such as towers or beams, increasing setup complexity and posing logistical challenges in construction settings. To mitigate these challenges, we propose a six-cable CDPR model specifically designed for automated panelized building retrofits. Although the feasible workspace is limited, our analysis shows that the proposed CDPR adequately covers the critical areas required for panel installation. To validate that the six-cable system can effectively transport the end effector to the desired installation pose, we calculated optimal trajectories based on a constrained dynamic model. The simulation results of the six-cable CDPR demonstrate promising potential for automated panelized building retrofits, effectively balancing simplicity, cost-effectiveness, and functionality.
- Open Access
- 27 July 2025
- Published by International Association for Automation and Robotics in Construction (IAARC) in Proceedings of the 37th International Symposium on Automation and Robotics in Construction (isarc)
- Vol. 2025 Proce, 1425-1432
Deep Point Cloud Building Envelope Segmentation (DeeP-CuBES) using Deep Learning
Building Information Modeling (BIM) plays an important role in building design and construction, particularly for achieving energy-efficient retrofits. Building envelope retrofits using panelized prefabricated system, such as those popularized by the Energiesprong program, need accurate as-built dimensions of facade features (windows, doors, etc.) to achieve the desired thermal and air tightness. Traditionally, building surveying is done manually, resulting in a timeconsuming and labor-intensive process. Recently, 3D point clouds from terrestrial LiDAR have been used to automate the generation of as-built dimensions of existing buildings. However, automated BIM using LiDAR relies on solving the point cloud semantic segmentation (PCSS) problem. In this work, we propose a robust pipeline for solving the PCSS problem using deep neural networks, focusing on overcoming challenges posed by imbalanced datasets and complex architectural features. We introduce the first high-density, labeled, and validated building envelope point cloud dataset derived from multiple building scans, specifically curated to tackle challenges in facade-level segmentation. Results from the trained neural networks show that advanced attentionbased architectures and incorporating radiometry (light intensity and RGB) features significantly boost segmentation accuracy for windows and doors.
- 27 July 2025
- Published by International Association for Automation and Robotics in Construction (IAARC) in Proceedings of the 37th International Symposium on Automation and Robotics in Construction (isarc)
- Vol. 2025 Proce, 1425-1432
Open AccessDeep Point Cloud Building Envelope Segmentation (DeeP-CuBES) using Deep Learning
Building Information Modeling (BIM) plays an important role in building design and construction, particularly for achieving energy-efficient retrofits. Building envelope retrofits using panelized prefabricated system, such as those popularized by the Energiesprong program, need accurate as-built dimensions of facade features (windows, doors, etc.) to achieve the desired thermal and air tightness. Traditionally, building surveying is done manually, resulting in a timeconsuming and labor-intensive process. Recently, 3D point clouds from terrestrial LiDAR have been used to automate the generation of as-built dimensions of existing buildings. However, automated BIM using LiDAR relies on solving the point cloud semantic segmentation (PCSS) problem. In this work, we propose a robust pipeline for solving the PCSS problem using deep neural networks, focusing on overcoming challenges posed by imbalanced datasets and complex architectural features. We introduce the first high-density, labeled, and validated building envelope point cloud dataset derived from multiple building scans, specifically curated to tackle challenges in facade-level segmentation. Results from the trained neural networks show that advanced attentionbased architectures and incorporating radiometry (light intensity and RGB) features significantly boost segmentation accuracy for windows and doors.
- Open Access
- 1 March 2025
- Published by Office of Scientific and Technical Information (OSTI)
Evaluation of the Energy, Hygrothermal, and Thermal Capacity Performance of Cross-Laminated Timber
Cross-laminated timber (CLT) construction is gaining momentum in the US because it offers multiple advantages over traditional construction methods. Benefits that have received the most attention focus on constructability, the environment, and protection (e.g., blast resistance), although CLT construction is likely to offer other benefits, as well. Still, these have not been studied at length because such evaluations are costly, requiring long-term assessments in an actual building and specialized technical knowledge. Among the possible benefits, CLT construction likely provides a higher-performing building envelope. Using CLT panels to enclose a building means fewer joints in the opaque envelope than what is required in traditional stick-framed construction. Fewer joints mean fewer locations where the air- and water-resistive barrier (WRB) could be compromised; thus, a CLT building enclosure may require less maintenance and have a longer lifespan than a traditionally built structure because of fewer air and water leaks. In addition, CLT’s thermal mass moderates indoor temperatures, allowing the heating, ventilation, and air conditioning (HVAC) system to operate more efficiently during peak hours, reducing operational energy consumption throughout the lifetime of the CLT building (Salonvaara et al., 2022). Furthermore, more stable indoor temperatures can increase occupant comfort. The CLT’s thermal mass can also reduce energy costs by adjusting to utility time-of-use pricing without affecting occupant comfort. The ability of CLT buildings to bridge periods without HVAC operation prepares them for future grid interaction and provides a certain level of resilience against power outages. Researchers have attempted to quantify these benefits; however, their work is based on simplified simulations with numerous assumptions. To correctly understand the benefits, an actual building must be monitored. Therefore, information needs to be gathered on indoor and outdoor temperatures, HVAC energy consumption, thermostat setpoints, temperatures, and thermal transport in CLT components to comprehend how these parameters are affected by the CLT’s thermal mass. These data are needed to reduce the number of assumptions and calibrate simulation models to optimize HVAC controls to minimize overall energy consumption, reduce energy use and higher fees during peak demand, and maintain occupant comfort. Additionally, the calibrated simulation model allows the optimization exercise to be repeated in various US climates. Potential benefits can be tailored to buildings in various locations, and decisions can be made on where CLT construction could be most advantageous. Furthermore, monitoring and simulation results are needed to evaluate the durability of the CLT structures in different climates. This project’s researchers gathered information to help understand and quantify the benefits of CLT buildings concerning operational energy, moderated indoor temperatures, and comfort; the dynamic operation to provide grid services; and resilience in times of power outage. Through the corroboration of simulation models with real-world measurements, this study paves the way for extrapolating findings to other climatic zones and building typologies, thereby broadening the understanding of CLT’s multifaceted benefits and reinforcing its position as a material of choice in sustainable construction.
- 1 March 2025
- Published by Office of Scientific and Technical Information (OSTI)
Open AccessEvaluation of the Energy, Hygrothermal, and Thermal Capacity Performance of Cross-Laminated Timber
Cross-laminated timber (CLT) construction is gaining momentum in the US because it offers multiple advantages over traditional construction methods. Benefits that have received the most attention focus on constructability, the environment, and protection (e.g., blast resistance), although CLT construction is likely to offer other benefits, as well. Still, these have not been studied at length because such evaluations are costly, requiring long-term assessments in an actual building and specialized technical knowledge. Among the possible benefits, CLT construction likely provides a higher-performing building envelope. Using CLT panels to enclose a building means fewer joints in the opaque envelope than what is required in traditional stick-framed construction. Fewer joints mean fewer locations where the air- and water-resistive barrier (WRB) could be compromised; thus, a CLT building enclosure may require less maintenance and have a longer lifespan than a traditionally built structure because of fewer air and water leaks. In addition, CLT’s thermal mass moderates indoor temperatures, allowing the heating, ventilation, and air conditioning (HVAC) system to operate more efficiently during peak hours, reducing operational energy consumption throughout the lifetime of the CLT building (Salonvaara et al., 2022). Furthermore, more stable indoor temperatures can increase occupant comfort. The CLT’s thermal mass can also reduce energy costs by adjusting to utility time-of-use pricing without affecting occupant comfort. The ability of CLT buildings to bridge periods without HVAC operation prepares them for future grid interaction and provides a certain level of resilience against power outages. Researchers have attempted to quantify these benefits; however, their work is based on simplified simulations with numerous assumptions. To correctly understand the benefits, an actual building must be monitored. Therefore, information needs to be gathered on indoor and outdoor temperatures, HVAC energy consumption, thermostat setpoints, temperatures, and thermal transport in CLT components to comprehend how these parameters are affected by the CLT’s thermal mass. These data are needed to reduce the number of assumptions and calibrate simulation models to optimize HVAC controls to minimize overall energy consumption, reduce energy use and higher fees during peak demand, and maintain occupant comfort. Additionally, the calibrated simulation model allows the optimization exercise to be repeated in various US climates. Potential benefits can be tailored to buildings in various locations, and decisions can be made on where CLT construction could be most advantageous. Furthermore, monitoring and simulation results are needed to evaluate the durability of the CLT structures in different climates. This project’s researchers gathered information to help understand and quantify the benefits of CLT buildings concerning operational energy, moderated indoor temperatures, and comfort; the dynamic operation to provide grid services; and resilience in times of power outage. Through the corroboration of simulation models with real-world measurements, this study paves the way for extrapolating findings to other climatic zones and building typologies, thereby broadening the understanding of CLT’s multifaceted benefits and reinforcing its position as a material of choice in sustainable construction.