Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Yifang Liu has a total of 13 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    P2P: Point Cloud to Panel Layout Optimization

    by Nisha Deborah Philips, Yifang Liu, Nolan W. Hayes, Diana Hun, Bryan P. Maldonado

    Building envelope retrofits, despite their benefits on enhancing energy efficiency, progress slowly due to high operating costs. Overclad panelized systems present an attractive solution to make retrofits affordable and easy to install. However, several stages of the retrofit process remain disconnected, suboptimal, and require significant human intervention. This study aims to bridge the gap between digital twin generation and overclad panel installation by automating the design of an optimal panel layout directly from a building envelope point cloud. In this end-to-end approach, the dimensional twin is generated by segmenting the facade point cloud. The facade then undergoes a three-step process to generate an optimized panel layout for integration with automated placement systems.

  • Open Access

    Integration of a real-time orientation measurement system for a real-time evaluator (RTE) to measure the position and orientation of crane-lifted components

    by Balaji Selvakumar, Nolan W Hayes, Yifang Liu, Bryan P Maldonado, Mengjia Tang, Diana Hun

    Prefabrication of building components holds the potential to revolutionize the construction industry. Prefabrication consists of manufacturing building components, modules, and other elements in a factory to be shipped and installed on a construction site. Prefabricated components have been produced for various applications including precast concrete panels for new construction and exterior wall retrofits. The manufacturing process has seen much innovation in recent years; however, the installation process has seen minimal advancements. A real-time evaluator (RTE) was developed to reduce the installation cost of prefabricated components by reducing installation time, decreasing rework, and improving accuracy. The RTE uses off-the-shelf hardware and novel algorithms to assist erectors with component installation by measuring the real-time positions of connections and prefabricated components, providing installation guidance through a graphical user interface, and monitoring the accumulated installation errors. An overview of the RTE and the proposed workflow is presented. Previous on-site demonstrations provided valuable feedback from users on the potential areas for improvement of the system. One common request was real-time measurement of component orientation during lifting, a process that previously required that the component remain stationary while the laser tracker cycled through target prisms. This paper will present the incorporation and testing of a real-time orientation measurement system as it was implemented into the RTE, allowing for measurement of component orientation during movement.

  • Open Access

    Dynamic Analysis of a Six-Cable Parallel Robot for Automated Panelized Building Retrofits

    by Yifang Liu, Nolan Hayes, Diana Hun, Bryan Maldonado

    Cable-Driven Parallel Robots (CDPRs) are highly suitable for automated panelized building retrofits, thanks to their compact footprint and high payload-to-weight ratio. A common CDPR configuration featuring eight cables, where the anchors form a rectangular prism in front of the building facade, offers a large wrench feasible workspace and good control versatility. However, installing upper anchor points requires additional support structures, such as towers or beams, increasing setup complexity and posing logistical challenges in construction settings. To mitigate these challenges, we propose a six-cable CDPR model specifically designed for automated panelized building retrofits. Although the feasible workspace is limited, our analysis shows that the proposed CDPR adequately covers the critical areas required for panel installation. To validate that the six-cable system can effectively transport the end effector to the desired installation pose, we calculated optimal trajectories based on a constrained dynamic model. The simulation results of the six-cable CDPR demonstrate promising potential for automated panelized building retrofits, effectively balancing simplicity, cost-effectiveness, and functionality.


  • Open Access

    Deep Point Cloud Building Envelope Segmentation (DeeP-CuBES) using Deep Learning

    by Balaji Selvakumar, Yifang Liu, Nolan W. Hayes, Diana Hun, Bryan P. Maldonado

    Building Information Modeling (BIM) plays an important role in building design and construction, particularly for achieving energy-efficient retrofits. Building envelope retrofits using panelized prefabricated system, such as those popularized by the Energiesprong program, need accurate as-built dimensions of facade features (windows, doors, etc.) to achieve the desired thermal and air tightness. Traditionally, building surveying is done manually, resulting in a timeconsuming and labor-intensive process. Recently, 3D point clouds from terrestrial LiDAR have been used to automate the generation of as-built dimensions of existing buildings. However, automated BIM using LiDAR relies on solving the point cloud semantic segmentation (PCSS) problem. In this work, we propose a robust pipeline for solving the PCSS problem using deep neural networks, focusing on overcoming challenges posed by imbalanced datasets and complex architectural features. We introduce the first high-density, labeled, and validated building envelope point cloud dataset derived from multiple building scans, specifically curated to tackle challenges in facade-level segmentation. Results from the trained neural networks show that advanced attentionbased architectures and incorporating radiometry (light intensity and RGB) features significantly boost segmentation accuracy for windows and doors.

  • Open Access

    Dynamic Modeling, Trajectory Optimization, and Linear Control of Cable-Driven Parallel Robots for Automated Panelized Building Retrofits

    by Yifang Liu, Bryan P. Maldonado

    The construction industry faces a growing need for automation to reduce costs, improve accuracy and productivity, and address labor shortages. One area that stands to benefit significantly from automation is panelized prefabricated building envelope retrofits, which can improve a building’s energy efficiency in heating and cooling interior spaces. In this paper, we propose using cable-driven parallel robots (CDPRs), which can effectively lift and handle large objects, to install these panels. However, implementing CDPRs presents significant challenges because of their nonlinear dynamics, complex trajectory planning, and precise control requirements. To tackle these challenges, this work focuses on a new application of established control and trajectory optimization theories in a CDPR simulation of a building envelope retrofit under real-world conditions. We first model the dynamics of CDPRs, highlighting the critical role of damping in system behavior. Building on this dynamic model, we formulate a trajectory optimization problem to generate feasible and efficient motion plans for the robot under operational and environmental constraints. Given the high precision required in the construction industry, accurately tracking the optimized trajectory is essential. However, challenges such as partial observability and external vibrations complicate this task. To address these issues, a Linear Quadratic Gaussian control framework is applied, enabling the robot to track the optimized trajectories with precision. Simulation results show that the proposed controller enables precise end effector positioning with errors under 4 mm, even in the presence of external wind disturbances. Through comprehensive simulations, our approach allows for an in-depth exploration of the system’s nonlinear dynamics, trajectory optimization, and control strategies under controlled yet highly realistic conditions. The results demonstrate the feasibility of CDPRs for automating panel installation and provide insights into their practical deployment.


  • Stability-Based Sequence Planning for Robotic Dry-Stacking of Natural Stones

    by Yifang Liu, Nils Napp

    The ability to autonomously build strong, dry-stacked structures with in-situ objects would enable new robotic applications in disaster response and remote site preparation. Previous works have demonstrated that heuristics adapted from masonry manuals allow robots to build freestanding dry-stacked structures but have failed to evaluate the strength of the structures. In this letter, we focus on the stability of the dry-stacked structures in both simulation and physical implementation. To estimate the strength of a wall, we physically construct and destructively test a single wall building plan multiple times. We then validate that the simulated strength predicts the strength of the physical walls. We show that evaluating strength throughout the planning process can significantly improve the final stability of structures. Furthermore, we observe that stronger walls are easier to build with a robot because they are more resilient to execution errors. We also investigate the role of execution errors that are due to the limited manipulation skills of a position controlled pinch grip for object placement and show that it is not necessarily a limiting factor to building strong walls.


  • Errors in Collective Robotic Construction

    by Jiahe Chen, Yifang Liu, Adam Pacheck, Hadas Kress-Gazit, Nils Napp, Kirstin Petersen