Gian Franco Napa-García
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Gian Franco Napa-García has a total of 31 co-authors. Here are the top co-authors by number of shared publications:
- André Teófilo Beck
Department of Structural Engineering, São Carlos School of Engineering, University of São Paulo, São Carlos, Brazil
6 shared publications - Vanessaq Almeida de Godoy
Universitat Politècnica de València
3 shared publications - Adrian Torrico Siacara
Universidade de São Paulo
2 shared publications - Marcos Massao Futai
Universidade de São Paulo
2 shared publications - Taís Renata Câmara
VALE S.A., Brazil
2 shared publications - Vidal Torres
Mining, Vale Institute of Technology (ITV), Belo Horizonte, Brazil
2 shared publications
Latest Publications
- 9 June 2024
- Published by Springer Nature in International Journal of Geosynthetics and Ground Engineering
- Vol. 10 (3) , 1-17
Reliability Analysis of an Earth Dam Under Rainfall Effects
- 9 June 2024
- Published by Springer Nature in International Journal of Geosynthetics and Ground Engineering
- Vol. 10 (3) , 1-17
Reliability Analysis of an Earth Dam Under Rainfall Effects
- Open Access
- 10 March 2022
- Published by Springer Nature in SN Applied Sciences
- Vol. 4 (4) , 1-23
Reliability analysis of an earth dam in operating conditions using direct coupling
In this study, we present a numerical investigation of the direct coupling between the deterministic GeoStudio package (Seepage/W and Slope/W software) and the StRAnD reliability package for normal operating conditions of an existing old earth dam over time. Direct coupling avoids errors associated to point estimate methods and to using response surface surrogates. One relevant feature of the study is the use of realistic pore water pressures for each equilibrium analysis, accomplished by considering a long-term steady-state analysis as an initial condition, followed by four years of equilibrium analysis, before each transient seepage analysis. All reliability analysis were performed using the first-order reliability method. The most important random parameters found in sensitivity analyses are four dam body parameters (saturated hydraulic conductivity,ks; specific weight,γ; effective cohesion,c′; and friction angle,ϕ′) and two filter parameters (ksandϕ′). A range of values of the relationship between the reliability index (β) and the factor of safety (FS) was found for all probabilistic and deterministic results. Finally, a large difference in terms of critical deterministic and probabilistic slip surfaces is identified for the same time of analysis.Article highlights: Realistic pore water pressures used in dam equilibrium analysis, by considering random seepage analysis in previous 5 to 30 days. Direct coupling of deterministic and reliability softwares avoids errors associated to point estimate and response surface surrogate methods. Existing old earth dam studied in Normal Operating Condition. For same analysis time, large differences are observed between critical deterministic and probabilistic slip surfaces.
- 10 March 2022
- Published by Springer Nature in SN Applied Sciences
- Vol. 4 (4) , 1-23
Open AccessReliability analysis of an earth dam in operating conditions using direct coupling
In this study, we present a numerical investigation of the direct coupling between the deterministic GeoStudio package (Seepage/W and Slope/W software) and the StRAnD reliability package for normal operating conditions of an existing old earth dam over time. Direct coupling avoids errors associated to point estimate methods and to using response surface surrogates. One relevant feature of the study is the use of realistic pore water pressures for each equilibrium analysis, accomplished by considering a long-term steady-state analysis as an initial condition, followed by four years of equilibrium analysis, before each transient seepage analysis. All reliability analysis were performed using the first-order reliability method. The most important random parameters found in sensitivity analyses are four dam body parameters (saturated hydraulic conductivity,ks; specific weight,γ; effective cohesion,c′; and friction angle,ϕ′) and two filter parameters (ksandϕ′). A range of values of the relationship between the reliability index (β) and the factor of safety (FS) was found for all probabilistic and deterministic results. Finally, a large difference in terms of critical deterministic and probabilistic slip surfaces is identified for the same time of analysis.Article highlights: Realistic pore water pressures used in dam equilibrium analysis, by considering random seepage analysis in previous 5 to 30 days. Direct coupling of deterministic and reliability softwares avoids errors associated to point estimate and response surface surrogate methods. Existing old earth dam studied in Normal Operating Condition. For same analysis time, large differences are observed between critical deterministic and probabilistic slip surfaces.
- 30 April 2020
- Published by Springer Nature in International Journal of Civil Engineering
- Vol. 18 (7) , 827-834
Post-cycling Interface Strength Test of Geogrids
- 30 April 2020
- Published by Springer Nature in International Journal of Civil Engineering
- Vol. 18 (7) , 827-834
Post-cycling Interface Strength Test of Geogrids
- Open Access
- 1 April 2020
- Published by Elsevier in Journal of Rock Mechanics and Geotechnical Engineering
- Vol. 12 (2) , 366-380
Reliability analysis of earth dams using direct coupling
- 1 April 2020
- Published by Elsevier in Journal of Rock Mechanics and Geotechnical Engineering
- Vol. 12 (2) , 366-380
Open AccessReliability analysis of earth dams using direct coupling
- Open Access
- 1 March 2020
- Published by FapUNIFESP (SciELO) in REM - International Engineering Journal
- Vol. 73 (1) , 119-126
Analysis of the impacts of slope angle variation on slope stability and NPV via two different final pit definition techniques
The traditionally and widely used Lerchs-Grossmann algorithm presents well-known limitations that newer propositions attempt to overcome. The direct block schedule (DBS) methodology, which has gained relevance with computational advances, obtains the final pit as a natural result of production sequencing, different from Lerchs-Grossmann-based algorithms. This process flow applies constraints in the final pit definition stage attempting to provide a more realistic result and to minimize risks. Slope instability is a common and inherent risk to open pit mining and may affect the project's net present value (NPV). A study of the impacts of slope angle variations on safety indexes and final pit NPV provides an auxiliary tool for the overall slope angle definition process. This article presents a case study in which the effects of variations of the overall slope angle on the safety factor (SF) and project NPV were analyzed. A total of 25 pits were generated by each studied final pit definition methodology, and each pit had the sections with the varied slope angles analyzed in the stability assessment, resulting in a total of 150 slopes analyzed. A comparison between the results obtained by the two different methodologies implemented in commercial software is presented. The results show no relationship between the NPV and the overall slope angle using the DBS methodology. An analysis of the results for each geotechnical sector obtained by the traditional methodology was conducted and may contribute to the trade-off analysis between the best slope angle to achieve a reasonable SF and the maximum NPV.
- 1 March 2020
- Published by FapUNIFESP (SciELO) in REM - International Engineering Journal
- Vol. 73 (1) , 119-126
Open AccessAnalysis of the impacts of slope angle variation on slope stability and NPV via two different final pit definition techniques
The traditionally and widely used Lerchs-Grossmann algorithm presents well-known limitations that newer propositions attempt to overcome. The direct block schedule (DBS) methodology, which has gained relevance with computational advances, obtains the final pit as a natural result of production sequencing, different from Lerchs-Grossmann-based algorithms. This process flow applies constraints in the final pit definition stage attempting to provide a more realistic result and to minimize risks. Slope instability is a common and inherent risk to open pit mining and may affect the project's net present value (NPV). A study of the impacts of slope angle variations on safety indexes and final pit NPV provides an auxiliary tool for the overall slope angle definition process. This article presents a case study in which the effects of variations of the overall slope angle on the safety factor (SF) and project NPV were analyzed. A total of 25 pits were generated by each studied final pit definition methodology, and each pit had the sections with the varied slope angles analyzed in the stability assessment, resulting in a total of 150 slopes analyzed. A comparison between the results obtained by the two different methodologies implemented in commercial software is presented. The results show no relationship between the NPV and the overall slope angle using the DBS methodology. An analysis of the results for each geotechnical sector obtained by the traditional methodology was conducted and may contribute to the trade-off analysis between the best slope angle to achieve a reasonable SF and the maximum NPV.
- Open Access
- 1 September 2019
- Published by Elsevier in International Journal of Mining Science and Technology
- Vol. 29 (5) , 797-801
Optimization of room-and-pillar dimensions using automated numerical models
- 1 September 2019
- Published by Elsevier in International Journal of Mining Science and Technology
- Vol. 29 (5) , 797-801
Open AccessOptimization of room-and-pillar dimensions using automated numerical models
- Open Access
- 1 March 2019
- Published by FapUNIFESP (SciELO) in REM - International Engineering Journal
- Vol. 72 (1) , 133-139
Development and application of a flexible numerical model to evaluate the safety of room-and-pillar mines
The design of room-and-pillar mines relies on the correct estimation of the safety indicator of the underground structures formed by the excavation of drifts. Thus, the study of the geomechanical behavior is of vital importance. The mathematical models play an important role in the identification of problematic areas and allows different configurations to be tested in a safe manner. This article presents the development and application of a flexible and automatic routine to quantify the safety of room-and-pillar mines in terms of the safety factor of pillar and room convergence. The commercial software package FLAC3D was used to implement a computation routine in FISH language that can automatically represent the main characteristics of the geomechanical conditions, lithology and geometric features of a room-and-pillar project in a fast and accurate manner. A case study was performed on a manganese ore mine in order to demonstrate the capabilities of the developed routine.
- 1 March 2019
- Published by FapUNIFESP (SciELO) in REM - International Engineering Journal
- Vol. 72 (1) , 133-139
Open AccessDevelopment and application of a flexible numerical model to evaluate the safety of room-and-pillar mines
The design of room-and-pillar mines relies on the correct estimation of the safety indicator of the underground structures formed by the excavation of drifts. Thus, the study of the geomechanical behavior is of vital importance. The mathematical models play an important role in the identification of problematic areas and allows different configurations to be tested in a safe manner. This article presents the development and application of a flexible and automatic routine to quantify the safety of room-and-pillar mines in terms of the safety factor of pillar and room convergence. The commercial software package FLAC3D was used to implement a computation routine in FISH language that can automatically represent the main characteristics of the geomechanical conditions, lithology and geometric features of a room-and-pillar project in a fast and accurate manner. A case study was performed on a manganese ore mine in order to demonstrate the capabilities of the developed routine.
- 22 February 2019
- Published by Springer Nature
- p. 371-380
Three-Dimensional Integral Modeling of Large Open-Pit Slopes: An Innovative Stability Analysis
- 22 February 2019
- Published by Springer Nature
- p. 371-380
Three-Dimensional Integral Modeling of Large Open-Pit Slopes: An Innovative Stability Analysis
- 1 March 2018
- Published by Elsevier in International Journal of Rock Mechanics and Mining Sciences
- Vol. 103, 116-122
Improvement of analytical factor of safety estimation of falling failure mode in roof wedge stability
- 1 March 2018
- Published by Elsevier in International Journal of Rock Mechanics and Mining Sciences
- Vol. 103, 116-122
Improvement of analytical factor of safety estimation of falling failure mode in roof wedge stability