Joseph Rand
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Joseph Rand has a total of 52 co-authors. Here are the top co-authors by number of shared publications:
Ben Hoen
Energy Markets and Policy Department, Lawrence Berkeley National Laboratory, Berkeley, CA, United States
6 shared publicationsGundula Hübner
4 shared publicationsJoachim Seel
4 shared publications- Ben Hoen
Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA (United States)
3 shared publications Debi Elliott
Regional Research Institute for Human Services (RRI), Portland State University, Portland, OR, USA
3 shared publicationsJohannes Pohl
3 shared publications
Latest Publications
- Open Access
- 29 July 2026
- Published by Elsevier in SSRN Electronic Journal
Is Energy-Only Interconnection Working? Empirical Evidence from Two Decades of US Market Data
Growth in electricity demand and generation is increasingly constrained by generator interconnection bottlenecks, with 2,061 gigawatts of proposed capacity stalled in US queues. Energy-only, or non-firm, interconnection is intended to let generators connect to the grid more cheaply and quickly by accepting "as-available" service. Texas's "connect and manage" model has made this approach central to reform debates, but most US regions instead offer two service options: firm Network Resource Interconnection Service (NRIS) and non-firm Energy Resource Interconnection Service (ERIS). Using a dataset of over 36,000 interconnection requests and 4,500 cost studies spanning two decades, we show that ERIS fails to function as a true non-firm access option, offering neither cheaper nor faster interconnection. The historical network-upgrade cost discount associated with ERIS is driven by a "threshold effect," providing financial relief only when network upgrades are entirely avoided. Once physical upgrades are triggered, non-firm (ERIS) and firm (NRIS) interconnection face statistically comparable costs. As mounting grid constraints have cut the share of zero-cost ERIS outcomes from 80% to 10%, ERIS's financial and temporal advantages have largely evaporated and developer demand for this service has contracted. Our results suggest that the concept of "energy-only" interconnection is not inherently flawed; rather, ERIS's observed performance stems from restrictive study methodologies that do not reflect the characteristics of a true non-firm service option. These findings point to an opportunity to align interconnection rules with as-available grid access through operational redispatch, and to examine whether capacity value can remain informed by grid constraints without being dictated by interconnection service. Note: This manuscript is one of two complementary papers on energy-only interconnection. The companion paper reviews the regulatory and institutional design of ERIS and is also available as an SSRN preprint under the title, ‘A Review of United States Energy-only Generator Interconnection Service Policy and Considerations for Reform’, available at: https://ssrn.com/abstract=6870718
- 29 July 2026
- Published by Elsevier in SSRN Electronic Journal
Open AccessIs Energy-Only Interconnection Working? Empirical Evidence from Two Decades of US Market Data
Growth in electricity demand and generation is increasingly constrained by generator interconnection bottlenecks, with 2,061 gigawatts of proposed capacity stalled in US queues. Energy-only, or non-firm, interconnection is intended to let generators connect to the grid more cheaply and quickly by accepting "as-available" service. Texas's "connect and manage" model has made this approach central to reform debates, but most US regions instead offer two service options: firm Network Resource Interconnection Service (NRIS) and non-firm Energy Resource Interconnection Service (ERIS). Using a dataset of over 36,000 interconnection requests and 4,500 cost studies spanning two decades, we show that ERIS fails to function as a true non-firm access option, offering neither cheaper nor faster interconnection. The historical network-upgrade cost discount associated with ERIS is driven by a "threshold effect," providing financial relief only when network upgrades are entirely avoided. Once physical upgrades are triggered, non-firm (ERIS) and firm (NRIS) interconnection face statistically comparable costs. As mounting grid constraints have cut the share of zero-cost ERIS outcomes from 80% to 10%, ERIS's financial and temporal advantages have largely evaporated and developer demand for this service has contracted. Our results suggest that the concept of "energy-only" interconnection is not inherently flawed; rather, ERIS's observed performance stems from restrictive study methodologies that do not reflect the characteristics of a true non-firm service option. These findings point to an opportunity to align interconnection rules with as-available grid access through operational redispatch, and to examine whether capacity value can remain informed by grid constraints without being dictated by interconnection service. Note: This manuscript is one of two complementary papers on energy-only interconnection. The companion paper reviews the regulatory and institutional design of ERIS and is also available as an SSRN preprint under the title, ‘A Review of United States Energy-only Generator Interconnection Service Policy and Considerations for Reform’, available at: https://ssrn.com/abstract=6870718
- Open Access
- 17 June 2025
- Published by Frontiers Media SA in Frontiers in Sustainable Energy Policy
- Vol. 4, 1579170
More power to them: U.S. large-scale solar neighbors' support for additional solar
Large-scale solar (LSS) electric capacity is expanding rapidly in the U.S., with over 18 GW added in 2023 and over 40 GW in 2024; high levels of LSS deployment are anticipated to continue in coming years to meet growing electricity demand. Such deployment relies on sustained support from host community members and local governments, but that support is not assured, with community opposition now a leading cause of LSS project delays and cancellations. We conducted a nationally representative, stratified random survey of LSS neighbors (living within 3 miles) in order to better understand factors correlated with sentiments about LSS and levels of support and opposition for additional LSS development among residents with direct lived experience. Overall, we find most LSS neighbors are neutral or supportive of additional LSS in or near their communities. While some objective measures—such as the size of the project nearest the respondent, the respondent's education level, and whether they have solar on their own home—are important correlates with support, subjective sentiments and perceptions of respondents are much more informative. Perceptions about how LSS helps or hinders community quality of life, landscape aesthetics, residential property values, climate change, and community interests and priorities were especially salient. In addition, respondents' familiarity with their local project was influential: seeing the project more frequently generally corresponded to lower support for additional LSS. Broadly, we find evidence to reject the NIMBY hypothesis, and, conversely, more evidence to support the relationship between LSS support and community values, identity, sense of place, and protection of that place.
- 17 June 2025
- Published by Frontiers Media SA in Frontiers in Sustainable Energy Policy
- Vol. 4, 1579170
Open AccessMore power to them: U.S. large-scale solar neighbors' support for additional solar
Large-scale solar (LSS) electric capacity is expanding rapidly in the U.S., with over 18 GW added in 2023 and over 40 GW in 2024; high levels of LSS deployment are anticipated to continue in coming years to meet growing electricity demand. Such deployment relies on sustained support from host community members and local governments, but that support is not assured, with community opposition now a leading cause of LSS project delays and cancellations. We conducted a nationally representative, stratified random survey of LSS neighbors (living within 3 miles) in order to better understand factors correlated with sentiments about LSS and levels of support and opposition for additional LSS development among residents with direct lived experience. Overall, we find most LSS neighbors are neutral or supportive of additional LSS in or near their communities. While some objective measures—such as the size of the project nearest the respondent, the respondent's education level, and whether they have solar on their own home—are important correlates with support, subjective sentiments and perceptions of respondents are much more informative. Perceptions about how LSS helps or hinders community quality of life, landscape aesthetics, residential property values, climate change, and community interests and priorities were especially salient. In addition, respondents' familiarity with their local project was influential: seeing the project more frequently generally corresponded to lower support for additional LSS. Broadly, we find evidence to reject the NIMBY hypothesis, and, conversely, more evidence to support the relationship between LSS support and community values, identity, sense of place, and protection of that place.
- Open Access
- 1 September 2024
- Published by Office of Scientific and Technical Information (OSTI)
Hybrid Power Plants: Status of Operating and Proposed Plants, 2024 Edition [Slides]
Improving battery technology and the growth of variable renewable generation are driving a surge of interest in “hybrid” power plants that combine, for example, wind or solar generating capacity with co-located batteries. While most of the current interest involves pairing photovoltaic (PV) plants with batteries, other types of hybrid or co-located plants with wide-ranging configurations have been part of the U.S. electricity mix for decades. This annually updated briefing tracks and maps existing hybrid or co-located plants across the United States while also synthesizing data from power purchase agreements (PPAs) and generation interconnection queues to shed light on near- and long-term development pipelines. The scope includes “co-located hybrids” that pair two or more resources (e.g., multiple types of generation and/or generation with storage) that are operated largely independently behind a single point of interconnection, and “full hybrids” that also feature coordinated operations of the co-located resources. The focus is on plants with one megawatt (MW) or more of capacity; smaller (often behind-the-meter) projects are also increasingly common, but are not included in this data synthesis.
- 1 September 2024
- Published by Office of Scientific and Technical Information (OSTI)
Open AccessHybrid Power Plants: Status of Operating and Proposed Plants, 2024 Edition [Slides]
Improving battery technology and the growth of variable renewable generation are driving a surge of interest in “hybrid” power plants that combine, for example, wind or solar generating capacity with co-located batteries. While most of the current interest involves pairing photovoltaic (PV) plants with batteries, other types of hybrid or co-located plants with wide-ranging configurations have been part of the U.S. electricity mix for decades. This annually updated briefing tracks and maps existing hybrid or co-located plants across the United States while also synthesizing data from power purchase agreements (PPAs) and generation interconnection queues to shed light on near- and long-term development pipelines. The scope includes “co-located hybrids” that pair two or more resources (e.g., multiple types of generation and/or generation with storage) that are operated largely independently behind a single point of interconnection, and “full hybrids” that also feature coordinated operations of the co-located resources. The focus is on plants with one megawatt (MW) or more of capacity; smaller (often behind-the-meter) projects are also increasingly common, but are not included in this data synthesis.
- Open Access
- 11 April 2024
- Published by Office of Scientific and Technical Information (OSTI)
Perceptions of Large-Scale Solar Project Neighbors: Results From a National Survey [Slides]
Driven by favorable economics, policy factors, and decarbonization goals, large-scale solar (LSS, defined here as ground-mounted photovoltaic projects ≥1 MWDC) has expanded rapidly in recent years, with more than 90 gigawatts (GW) now installed across the United States. Growth in LSS deployment is anticipated to accelerate in response to growing electricity demand and utility, state, and federal decarbonization goals. This continued expansion hinges, in part, on the continued support of local residents and decision-makers in communities hosting LSS projects. Understanding the perceptions and attitudes of existing LSS neighbors is critical to inform and enable future LSS deployment, and to improve outcomes for those host communities. As of 2022, there were more than 10 million U.S. homes within 3 miles of LSS plants. Yet, until recently, no comprehensive study had examined the experiences and perceptions of these LSS neighbors. In 2023, a Berkeley Lab team worked with the University of Michigan and Michigan State University to conduct the first-of-its-kind nationally representative survey of LSS neighbors as part of the Community-Centered Solar Development research project. The survey effort ultimately collected 984 responses from residents within 3 miles of existing LSS projects. The survey results are available for download via the full summary analysis slide deck report, as well as a shorter (~4 page) summary brief. The survey instrument (questionnaire) is also available for download for those interested in understanding the survey design or replicating questions in future research.
- 11 April 2024
- Published by Office of Scientific and Technical Information (OSTI)
Open AccessPerceptions of Large-Scale Solar Project Neighbors: Results From a National Survey [Slides]
Driven by favorable economics, policy factors, and decarbonization goals, large-scale solar (LSS, defined here as ground-mounted photovoltaic projects ≥1 MWDC) has expanded rapidly in recent years, with more than 90 gigawatts (GW) now installed across the United States. Growth in LSS deployment is anticipated to accelerate in response to growing electricity demand and utility, state, and federal decarbonization goals. This continued expansion hinges, in part, on the continued support of local residents and decision-makers in communities hosting LSS projects. Understanding the perceptions and attitudes of existing LSS neighbors is critical to inform and enable future LSS deployment, and to improve outcomes for those host communities. As of 2022, there were more than 10 million U.S. homes within 3 miles of LSS plants. Yet, until recently, no comprehensive study had examined the experiences and perceptions of these LSS neighbors. In 2023, a Berkeley Lab team worked with the University of Michigan and Michigan State University to conduct the first-of-its-kind nationally representative survey of LSS neighbors as part of the Community-Centered Solar Development research project. The survey effort ultimately collected 984 responses from residents within 3 miles of existing LSS projects. The survey results are available for download via the full summary analysis slide deck report, as well as a shorter (~4 page) summary brief. The survey instrument (questionnaire) is also available for download for those interested in understanding the survey design or replicating questions in future research.
- Open Access
- 9 April 2024
- Published by Office of Scientific and Technical Information (OSTI)
Queued Up: 2024 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2023 [Slides]
Electric transmission system operators (ISOs, RTOs, or utilities) require projects seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. The amount of new electric capacity in these queues is growing dramatically, with nearly 2,600 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). However, most projects that apply for interconnection are ultimately withdrawn, and those that are built are taking longer on average to complete the required studies and become operational. Data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. This annually updated briefing and data file compiles and analyzes interconnection queue data from all seven ISOs/RTOs alongside 44 non-ISO utilities, which collectively represent over 95% of the currently installed U.S. electric generating capacity. -The total capacity active in the queues is growing year-over-year, with over 1,570 GW of generation and an estimated 1,030 GW of storage capacity as of the end of 2023. -In total, over 1,480 GW of zero-carbon generating capacity is currently seeking transmission access. Solar (1,086 GW) accounts for the largest share of generation capacity in the queues. Substantial wind (366 GW) capacity is also seeking interconnection, 1/3 of which is for offshore projects (120 GW). -Solar and battery storage are – by far – the fastest growing resources in the queues. Combined, they account for over 80% of new capacity entering the queues in 2023. -Proposed fossil fuel generation much lower, with 79 GW of natural gas and 1.5 GW of coal currently proposed. -Hybrid projects (co-locating multiple generation and/or storage types) comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 571 GW of solar hybrids (primarily solar+battery) and 48 GW of wind hybrids are currently active in the queues. Over half of the battery storage capacity in the queues is paired with some form of generation (mostly solar). -However, much of this proposed capacity will not ultimately be built. Among a subset of queues for which data are available, only 19% of the projects (and 14% of capacity) seeking connection from 2000 to 2018 have been built as of the end of 2023. -Interconnection wait times are also on the rise: The typical duration from connection request to commercial operation increased from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2023 (with a median of 5 years for projects built in 2023).
- 9 April 2024
- Published by Office of Scientific and Technical Information (OSTI)
Open AccessQueued Up: 2024 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2023 [Slides]
Electric transmission system operators (ISOs, RTOs, or utilities) require projects seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. The amount of new electric capacity in these queues is growing dramatically, with nearly 2,600 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). However, most projects that apply for interconnection are ultimately withdrawn, and those that are built are taking longer on average to complete the required studies and become operational. Data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. This annually updated briefing and data file compiles and analyzes interconnection queue data from all seven ISOs/RTOs alongside 44 non-ISO utilities, which collectively represent over 95% of the currently installed U.S. electric generating capacity. -The total capacity active in the queues is growing year-over-year, with over 1,570 GW of generation and an estimated 1,030 GW of storage capacity as of the end of 2023. -In total, over 1,480 GW of zero-carbon generating capacity is currently seeking transmission access. Solar (1,086 GW) accounts for the largest share of generation capacity in the queues. Substantial wind (366 GW) capacity is also seeking interconnection, 1/3 of which is for offshore projects (120 GW). -Solar and battery storage are – by far – the fastest growing resources in the queues. Combined, they account for over 80% of new capacity entering the queues in 2023. -Proposed fossil fuel generation much lower, with 79 GW of natural gas and 1.5 GW of coal currently proposed. -Hybrid projects (co-locating multiple generation and/or storage types) comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 571 GW of solar hybrids (primarily solar+battery) and 48 GW of wind hybrids are currently active in the queues. Over half of the battery storage capacity in the queues is paired with some form of generation (mostly solar). -However, much of this proposed capacity will not ultimately be built. Among a subset of queues for which data are available, only 19% of the projects (and 14% of capacity) seeking connection from 2000 to 2018 have been built as of the end of 2023. -Interconnection wait times are also on the rise: The typical duration from connection request to commercial operation increased from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2023 (with a median of 5 years for projects built in 2023).
- Open Access
- 21 June 2023
- Published by Office of Scientific and Technical Information (OSTI)
Community Centered Solar Development (CCSD) Case Study Interviews [Slides]
Large-scale solar (LSS, defined here as ground-mounted photovoltaic projects ≥1 MWDC) has grown rapidly in the U.S., accounting for nearly half of new electric generating capacity added to the U.S. grid in 2022. All sources of electricity bring positive and negative impacts to hosting communities and the rapid growth of LSS has increased the urgency to understand those impacts. Yet, information about the potential positive and negative impacts of LSS on host communities, and the factors or drivers leading to support or opposition to a project, is lacking. This information gap limits how project developers, municipalities, and local siting authorities can address community concerns and appropriately align proposed projects to best suit and benefit local communities. As part of Berkeley Lab’s Community-Centered Solar Development (CCSD) project, this research set out to explore deep insights and perceptions from LSS stakeholders that only qualitative data can provide to identify key factors driving project success or threatened failure. Case studies, such as those utilized in this research, are uniquely adept at capturing the subjective experience of individuals and at identifying variables, structures, and interactions between stakeholders. Our case studies included 54 semi-structured interviews across 7 different LSS sites, representing a diversity of geographies,more » project sizes (MW), site types (i.e., greenfield, agrivoltaic, and brownfield / contaminated sites), zoning jurisdiction types, and more (Table 1). In addition to local residents living in close proximity to these LSS sites, we interviewed other key stakeholders involved in the projects such as developers, decision-makers, utility representatives, landowners, and individuals from community-based organizations. The overarching aim of this case study research was two-fold: (1) to inform subsequent tasks in the CCSD research project (including an upcoming national survey of LSS neighbors), and (2) to provide insights into the following set of research questions: -What are the key positive and negative drivers leading to support and opposition to LSS projects? -To what extent do LSS projects exacerbate or mitigate perceived inequities and marginalization within hosting communities and how can those inequities be mitigated going forward? -What strategies can communities employ to align LSS development with local land-use plans and community needs and values? The research findings and next steps are described in this slide deck report. « less
- 21 June 2023
- Published by Office of Scientific and Technical Information (OSTI)
Open AccessCommunity Centered Solar Development (CCSD) Case Study Interviews [Slides]
Large-scale solar (LSS, defined here as ground-mounted photovoltaic projects ≥1 MWDC) has grown rapidly in the U.S., accounting for nearly half of new electric generating capacity added to the U.S. grid in 2022. All sources of electricity bring positive and negative impacts to hosting communities and the rapid growth of LSS has increased the urgency to understand those impacts. Yet, information about the potential positive and negative impacts of LSS on host communities, and the factors or drivers leading to support or opposition to a project, is lacking. This information gap limits how project developers, municipalities, and local siting authorities can address community concerns and appropriately align proposed projects to best suit and benefit local communities. As part of Berkeley Lab’s Community-Centered Solar Development (CCSD) project, this research set out to explore deep insights and perceptions from LSS stakeholders that only qualitative data can provide to identify key factors driving project success or threatened failure. Case studies, such as those utilized in this research, are uniquely adept at capturing the subjective experience of individuals and at identifying variables, structures, and interactions between stakeholders. Our case studies included 54 semi-structured interviews across 7 different LSS sites, representing a diversity of geographies,more » project sizes (MW), site types (i.e., greenfield, agrivoltaic, and brownfield / contaminated sites), zoning jurisdiction types, and more (Table 1). In addition to local residents living in close proximity to these LSS sites, we interviewed other key stakeholders involved in the projects such as developers, decision-makers, utility representatives, landowners, and individuals from community-based organizations. The overarching aim of this case study research was two-fold: (1) to inform subsequent tasks in the CCSD research project (including an upcoming national survey of LSS neighbors), and (2) to provide insights into the following set of research questions: -What are the key positive and negative drivers leading to support and opposition to LSS projects? -To what extent do LSS projects exacerbate or mitigate perceived inequities and marginalization within hosting communities and how can those inequities be mitigated going forward? -What strategies can communities employ to align LSS development with local land-use plans and community needs and values? The research findings and next steps are described in this slide deck report. « less
- Open Access
- 14 April 2023
- Published by Office of Scientific and Technical Information (OSTI)
Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2022 [Slides]
Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2022, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 2,000 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (947 GW) and battery storage (~680 GW) are – by far – the fastest growing resources in the queues; combined they accounted for over 80% of new capacity entering the queues in 2022. Substantial wind (300 GW) capacity is also seeking interconnection, 38% of which is for offshore projects (113 GW). In total, about 1,250 GW of zero-carbon generating capacity is currently seeking transmission access, as is 82 GW of natural gas capacity. Hybrids projects (co-locating multiple generation and/or storage types) comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 457 GW of solar hybrids (primarily solar+battery) and 24 GW of wind hybrids are currently active in the queues; over half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 21% of the projects (and 14% of capacity) seeking connection from 2000 to 2017 have been built as of the end of 2022. Additionally, interconnection wait times are on the rise: The typical duration from connection request to commercial operation increased from <2 years for projects built in 2000-2007 to nearly 4 years for those built in 2018-2022 (with a median of 5 years for projects built in 2022).
- 14 April 2023
- Published by Office of Scientific and Technical Information (OSTI)
Open AccessQueued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2022 [Slides]
Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2022, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 2,000 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (947 GW) and battery storage (~680 GW) are – by far – the fastest growing resources in the queues; combined they accounted for over 80% of new capacity entering the queues in 2022. Substantial wind (300 GW) capacity is also seeking interconnection, 38% of which is for offshore projects (113 GW). In total, about 1,250 GW of zero-carbon generating capacity is currently seeking transmission access, as is 82 GW of natural gas capacity. Hybrids projects (co-locating multiple generation and/or storage types) comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 457 GW of solar hybrids (primarily solar+battery) and 24 GW of wind hybrids are currently active in the queues; over half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 21% of the projects (and 14% of capacity) seeking connection from 2000 to 2017 have been built as of the end of 2022. Additionally, interconnection wait times are on the rise: The typical duration from connection request to commercial operation increased from <2 years for projects built in 2000-2007 to nearly 4 years for those built in 2018-2022 (with a median of 5 years for projects built in 2022).
- Open Access
- 6 May 2022
- Published by Wiley in Wind Energy
- Vol. 25 (8) , 1363-1378
Expert perspectives on the wind plant of the future
Wind power technology has changed rapidly in recent years. Technology innovation, evolving power markets, and competing land and ocean uses continue to influence the design and operation of wind turbines and plants. Anticipating these trends and their impact on future facilities can inform commercial strategies and research priorities. Drawing from a recent survey of 140 of the world's foremost wind experts, we identify expectations of future wind plant design in 2035, both for onshore and offshore wind. Experts anticipate continued growth in turbine size, to 5.5 (onshore) and 17 MW (offshore), with plants located in increasingly less favorable wind and siting regimes. They expect plant sizes of 1,100 MW for fixed‐bottom and 600 MW for floating offshore wind. Experts forecast enhanced grid‐system value from wind through significant to widespread use of larger rotors, hybrid projects with batteries and hydrogen production, and more. To explain experts' perspectives on future plant design and operation, we identify five mechanisms: economies of unit, plant, and resource scale; grid‐system value economies; and production efficiencies. We characterize learning effects as a moderating influence on the strength of these mechanisms. In combination, experts predict that these design choices support levelized cost of energy reductions of 27% (onshore) and 17%–35% (floating and fixed‐bottom offshore) by 2035 compared to today, while enhancing wind energy's grid service offerings. Our findings provide a much‐needed benchmark for representing future wind technologies in power sector models and address a critical research gap by explaining the economics behind wind energy design choices.
- 6 May 2022
- Published by Wiley in Wind Energy
- Vol. 25 (8) , 1363-1378
Open AccessExpert perspectives on the wind plant of the future
Wind power technology has changed rapidly in recent years. Technology innovation, evolving power markets, and competing land and ocean uses continue to influence the design and operation of wind turbines and plants. Anticipating these trends and their impact on future facilities can inform commercial strategies and research priorities. Drawing from a recent survey of 140 of the world's foremost wind experts, we identify expectations of future wind plant design in 2035, both for onshore and offshore wind. Experts anticipate continued growth in turbine size, to 5.5 (onshore) and 17 MW (offshore), with plants located in increasingly less favorable wind and siting regimes. They expect plant sizes of 1,100 MW for fixed‐bottom and 600 MW for floating offshore wind. Experts forecast enhanced grid‐system value from wind through significant to widespread use of larger rotors, hybrid projects with batteries and hydrogen production, and more. To explain experts' perspectives on future plant design and operation, we identify five mechanisms: economies of unit, plant, and resource scale; grid‐system value economies; and production efficiencies. We characterize learning effects as a moderating influence on the strength of these mechanisms. In combination, experts predict that these design choices support levelized cost of energy reductions of 27% (onshore) and 17%–35% (floating and fixed‐bottom offshore) by 2035 compared to today, while enhancing wind energy's grid service offerings. Our findings provide a much‐needed benchmark for representing future wind technologies in power sector models and address a critical research gap by explaining the economics behind wind energy design choices.
- Open Access
- 13 January 2020
- Published by Springer Nature in Scientific Data
- Vol. 7 (1) , 1-12
A continuously updated, geospatially rectified database of utility-scale wind turbines in the United States
Over 60,000 utility-scale wind turbines are installed in the United States as of October, 2019, representing over 97 gigawatts of electric power capacity; US wind turbine installations continue to grow at a rapid pace. Yet, until April 2018, no publicly-available, regularly updated data source existed to describe those turbines and their locations. Under a cooperative research and development agreement, analysts from three organizations collaborated to develop and release the United States Wind Turbine Database (USWTDB) - a publicly available, continuously updated, spatially rectified data source of locations and attributes of utility-scale wind turbines in the United States. Technical specifications and wind facility data, incorporated from five sources, undergo rigorous quality control. The location of each turbine is visually verified using high-resolution aerial imagery. The quarterly-updated data are available in a variety of formats, including an interactive web application, comma-separated values (CSV), shapefile, and application programming interface (API). The data are used widely by academic researchers, engineers and developers from wind energy companies, government agencies, planners, educators, and the general public.
- 13 January 2020
- Published by Springer Nature in Scientific Data
- Vol. 7 (1) , 1-12
Open AccessA continuously updated, geospatially rectified database of utility-scale wind turbines in the United States
Over 60,000 utility-scale wind turbines are installed in the United States as of October, 2019, representing over 97 gigawatts of electric power capacity; US wind turbine installations continue to grow at a rapid pace. Yet, until April 2018, no publicly-available, regularly updated data source existed to describe those turbines and their locations. Under a cooperative research and development agreement, analysts from three organizations collaborated to develop and release the United States Wind Turbine Database (USWTDB) - a publicly available, continuously updated, spatially rectified data source of locations and attributes of utility-scale wind turbines in the United States. Technical specifications and wind facility data, incorporated from five sources, undergo rigorous quality control. The location of each turbine is visually verified using high-resolution aerial imagery. The quarterly-updated data are available in a variety of formats, including an interactive web application, comma-separated values (CSV), shapefile, and application programming interface (API). The data are used widely by academic researchers, engineers and developers from wind energy companies, government agencies, planners, educators, and the general public.
- Top Cited PapersOpen Access
- 1 November 2019
- Published by Elsevier in Energy Policy
- Vol. 134
Attitudes of U.S. Wind Turbine Neighbors: Analysis of a Nationwide Survey
- 1 November 2019
- Published by Elsevier in Energy Policy
- Vol. 134
Top Cited PapersOpen AccessAttitudes of U.S. Wind Turbine Neighbors: Analysis of a Nationwide Survey