Georgios N. Aretoulis
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
Georgios N. Aretoulis has a total of 70 co-authors. Here are the top co-authors by number of shared publications:
- Fani Antoniou
Department of Environmental Engineering, International Hellenic University, Sindos, 57400 Thessaloniki, Greece
12 shared publications Eleni Aretouli
University of Ioannina
11 shared publicationsJason Papathanasiou
Department of Business Administration, University of Macedonia, 54124 Thessaloniki, Greece
9 shared publicationsGlykeria P. Kalfakakou
8 shared publicationsDimitra Manou
Law School, Aristotle University of Thessaloniki
7 shared publications- Georgios Tsaples
University of Macedonia
7 shared publications
Latest Publications
- Open Access
- 16 March 2026
- Published by Emerald Publishing in International Journal of Organization Theory & Behavior
- Vol. 29 (3) , 1-20
Optimizing distance learning educational programs research project. Results and lesson learned from the conduction of university courses
Purpose: Optimizing Distance Learning Educational Programs Research Project (ODLEP) aimed at increasing the performance of educational courses by creating the best students’ groups and assigning to them the most appropriate instructor. The present study sought to explore the link and correlation that may exist among the attributes and characteristics of students, their learning and teaching preferences with the course performance. Four questionnaires were constructed for the purpose of the study. Design/methodology/approach: The ODLEP approach was implemented in the context of the provision of 12 university courses. The questionnaires captured the students' and instructors’ learning and teaching preferences and their personality traits and the final assessment of the courses conducted. A significant number of students from 12 different courses of the undergraduate and postgraduate curriculum of the partnering universities participated in the survey. The responses were recorded in an SPSS database. Two types of analyses were performed. The first one involved descriptive statistics analysis and the second one involved correlation analysis using the crosstab method. Findings: It became evident that the ODLEP approach led to optimized performance of the courses and specifically in the case where the groups of students were created and assigned to the optimum instructor based on personality traits, learning and teaching preferences. Originality/value: It is the first time that a system creates collaborative groups of students and assign them to appropriate instructors based on psychometric test, learning and teaching preferences and multicriteria decision analysis.
- 16 March 2026
- Published by Emerald Publishing in International Journal of Organization Theory & Behavior
- Vol. 29 (3) , 1-20
Open AccessOptimizing distance learning educational programs research project. Results and lesson learned from the conduction of university courses
Purpose: Optimizing Distance Learning Educational Programs Research Project (ODLEP) aimed at increasing the performance of educational courses by creating the best students’ groups and assigning to them the most appropriate instructor. The present study sought to explore the link and correlation that may exist among the attributes and characteristics of students, their learning and teaching preferences with the course performance. Four questionnaires were constructed for the purpose of the study. Design/methodology/approach: The ODLEP approach was implemented in the context of the provision of 12 university courses. The questionnaires captured the students' and instructors’ learning and teaching preferences and their personality traits and the final assessment of the courses conducted. A significant number of students from 12 different courses of the undergraduate and postgraduate curriculum of the partnering universities participated in the survey. The responses were recorded in an SPSS database. Two types of analyses were performed. The first one involved descriptive statistics analysis and the second one involved correlation analysis using the crosstab method. Findings: It became evident that the ODLEP approach led to optimized performance of the courses and specifically in the case where the groups of students were created and assigned to the optimum instructor based on personality traits, learning and teaching preferences. Originality/value: It is the first time that a system creates collaborative groups of students and assign them to appropriate instructors based on psychometric test, learning and teaching preferences and multicriteria decision analysis.
- Open Access
- 31 December 2025
- Published by Asociatia Managerilor si Inginerilor Economisti din Romania (A.M.I.E.R.) in Review of Management and Economic Engineering
- Vol. 24 (4) , 228-240
ANALYSIS OF THE ACTIVITY OF THE MANAGER-LEADER AND THE PERFORMANCE OF PROJECT TEAMS IN AN AUTOMOTIVE COMPANY
Our research aims to identify the elements that determine a manager to be a good leader and how the performance of project teams in an automotive company is closely related to the manager's activity. For this, we conducted a simple descriptive, cross-sectional research, which involved collecting information about the problem under investigation by conducting the research only once, on a sample of respondents who were administered a questionnaire with 17 questions divided into three parts. The results obtained after processing the obtained results helped us identify those elements that determine a manager to be a good leader, but also how the performance of project teams is closely related to the activity carried out by the manager.
- 31 December 2025
- Published by Asociatia Managerilor si Inginerilor Economisti din Romania (A.M.I.E.R.) in Review of Management and Economic Engineering
- Vol. 24 (4) , 228-240
Open AccessANALYSIS OF THE ACTIVITY OF THE MANAGER-LEADER AND THE PERFORMANCE OF PROJECT TEAMS IN AN AUTOMOTIVE COMPANY
Our research aims to identify the elements that determine a manager to be a good leader and how the performance of project teams in an automotive company is closely related to the manager's activity. For this, we conducted a simple descriptive, cross-sectional research, which involved collecting information about the problem under investigation by conducting the research only once, on a sample of respondents who were administered a questionnaire with 17 questions divided into three parts. The results obtained after processing the obtained results helped us identify those elements that determine a manager to be a good leader, but also how the performance of project teams is closely related to the activity carried out by the manager.
- Open Access
- 3 November 2025
- Published by MDPI AG in Algorithms
- Vol. 18 (11) , 696
An Innovative Approach Regarding Efficient and Expedited Early Building Renovation Cost Estimation Utilizing ANNs and the TOPSIS Methodology
Early cost assessment is an essential part of building construction strategy; however, preliminary estimates are occasionally unreliable given incomplete data, which causes budgetary overruns. In general, traditional prediction techniques are imprecise and sluggish, particularly while the project scope is still unclear. By introducing a hybrid framework that utilizes ANNs for renovation cost estimation and features enhancements by the TOPSIS method to guarantee contextual relevance and input accuracy, the present research overcomes these drawbacks. Utilizing data from projects that are structurally and contextually comparable enhances the model’s predicted reliability and robustness. The study builds, trains, and tests two ANN models using IBM SPSS Statistics software, which is based on a thorough literature review and actual renovation data from construction businesses. One model utilized 53 data points from prior building renovation projects, whereas the second model employed 11 data points from post-TOPSIS technique building renovation projects. The Radial Basis Function (RBF) procedure is the basis for models that include 14 input data such as total initial cost, estimated completion time, initial demolition drainage cost, initial cost of plumbing work, initial heating cost, initial cost of electrical work, initial cost of masonry coatings, initial cost of plasterboard construction, initial bathroom cost, initial flooring costs, initial frame cost, initial door cost, initial paint cost, and initial kitchen construction cost, and one output data, the total final cost. The models show excellent performance with near 0.5 relative error and up to 0.3 monetary units sum of squares error before applying the TOPSIS method and nearly 0.6 relative error and up to 0.8 monetary units sum of squares error after the TOPSIS implementation, proving the usefulness and demonstrating the speed of the ANN in estimating overall renovation costs in combination with the TOPSIS approach. By employing this hybridized approach, the entire contingent procedure is expedited and accomplished more rapidly.
- 3 November 2025
- Published by MDPI AG in Algorithms
- Vol. 18 (11) , 696
Open AccessAn Innovative Approach Regarding Efficient and Expedited Early Building Renovation Cost Estimation Utilizing ANNs and the TOPSIS Methodology
Early cost assessment is an essential part of building construction strategy; however, preliminary estimates are occasionally unreliable given incomplete data, which causes budgetary overruns. In general, traditional prediction techniques are imprecise and sluggish, particularly while the project scope is still unclear. By introducing a hybrid framework that utilizes ANNs for renovation cost estimation and features enhancements by the TOPSIS method to guarantee contextual relevance and input accuracy, the present research overcomes these drawbacks. Utilizing data from projects that are structurally and contextually comparable enhances the model’s predicted reliability and robustness. The study builds, trains, and tests two ANN models using IBM SPSS Statistics software, which is based on a thorough literature review and actual renovation data from construction businesses. One model utilized 53 data points from prior building renovation projects, whereas the second model employed 11 data points from post-TOPSIS technique building renovation projects. The Radial Basis Function (RBF) procedure is the basis for models that include 14 input data such as total initial cost, estimated completion time, initial demolition drainage cost, initial cost of plumbing work, initial heating cost, initial cost of electrical work, initial cost of masonry coatings, initial cost of plasterboard construction, initial bathroom cost, initial flooring costs, initial frame cost, initial door cost, initial paint cost, and initial kitchen construction cost, and one output data, the total final cost. The models show excellent performance with near 0.5 relative error and up to 0.3 monetary units sum of squares error before applying the TOPSIS method and nearly 0.6 relative error and up to 0.8 monetary units sum of squares error after the TOPSIS implementation, proving the usefulness and demonstrating the speed of the ANN in estimating overall renovation costs in combination with the TOPSIS approach. By employing this hybridized approach, the entire contingent procedure is expedited and accomplished more rapidly.
- Open Access
- 17 September 2024
- Published by Elsevier in Solar Compass
- Vol. 12
Supporting strategy for investment evaluation of photovoltaic power generation engineering projects using multi-criteria decision analysis methods
- 17 September 2024
- Published by Elsevier in Solar Compass
- Vol. 12
Open AccessSupporting strategy for investment evaluation of photovoltaic power generation engineering projects using multi-criteria decision analysis methods
- Open Access
- 2 September 2024
- Published by MDPI AG in Algorithms
- Vol. 17 (9)
Radial Basis Function (RBF) and Multilayer Perceptron (MLP) Comparative Analysis on Building Renovation Cost Estimation: The Case of Greece
Renovation of buildings has become a major area of development for the construction industry. In the building construction sector, generating a precise and trustworthy cost estimate before building begins is the greatest challenge. Emphasizing the value of using ANN models to forecast the total cost of a building renovation project is the ultimate objective. As a result, building firms may be able to avoid financial losses as long as there is as little discrepancy between projected and actual costs for remodeling works in progress. To address the gap in the research, Greek contractors specializing in building renovations provided a sizable dataset of real project cost data. To build cost prediction ANNs, the collected data had to be organized, assessed, and appropriately encoded. The network was developed, trained, and tested using IBM SPSS Statistics software 28.0.0.0. The dependent variable is the final cost. The independent variables are initial cost, estimated completion time, actual completion time, delay time, initial and final demolition-drainage costs, cost of expenses, initial and final plumbing costs, initial and final heating costs, initial and final electrical costs, initial and final masonry costs, initial and final construction costs of plasterboard construction, initial and final cost of bathrooms, initial and final cost of flooring, initial and final cost of frames, initial and final cost of doors, initial and final cost of paint, and initial and final cost of kitchen construction. The first procedure that was employed was the radial basis function (RBF). The efficiency of the RBFNN model was evaluated and analyzed during training and testing, with up to 6% sum of squares error and nearly 0% relative error in the training sample, which accounted for roughly 70% of the total sample. The second procedure implemented was the method called the multi-layer perceptron (MLP). The efficiency of the MLPNN model was assessed and examined during training and testing; the training sample, which made up around 70% of the overall sample, had a relative error of 0–7% and a sum of squares error ranging from 1% to 5%, confirming specifically the efficacy of RBFNN in calculating the overall cost of renovations.
- 2 September 2024
- Published by MDPI AG in Algorithms
- Vol. 17 (9)
Open AccessRadial Basis Function (RBF) and Multilayer Perceptron (MLP) Comparative Analysis on Building Renovation Cost Estimation: The Case of Greece
Renovation of buildings has become a major area of development for the construction industry. In the building construction sector, generating a precise and trustworthy cost estimate before building begins is the greatest challenge. Emphasizing the value of using ANN models to forecast the total cost of a building renovation project is the ultimate objective. As a result, building firms may be able to avoid financial losses as long as there is as little discrepancy between projected and actual costs for remodeling works in progress. To address the gap in the research, Greek contractors specializing in building renovations provided a sizable dataset of real project cost data. To build cost prediction ANNs, the collected data had to be organized, assessed, and appropriately encoded. The network was developed, trained, and tested using IBM SPSS Statistics software 28.0.0.0. The dependent variable is the final cost. The independent variables are initial cost, estimated completion time, actual completion time, delay time, initial and final demolition-drainage costs, cost of expenses, initial and final plumbing costs, initial and final heating costs, initial and final electrical costs, initial and final masonry costs, initial and final construction costs of plasterboard construction, initial and final cost of bathrooms, initial and final cost of flooring, initial and final cost of frames, initial and final cost of doors, initial and final cost of paint, and initial and final cost of kitchen construction. The first procedure that was employed was the radial basis function (RBF). The efficiency of the RBFNN model was evaluated and analyzed during training and testing, with up to 6% sum of squares error and nearly 0% relative error in the training sample, which accounted for roughly 70% of the total sample. The second procedure implemented was the method called the multi-layer perceptron (MLP). The efficiency of the MLPNN model was assessed and examined during training and testing; the training sample, which made up around 70% of the overall sample, had a relative error of 0–7% and a sum of squares error ranging from 1% to 5%, confirming specifically the efficacy of RBFNN in calculating the overall cost of renovations.
- Open Access
Urban Polycentricity and Architectural Heritage: A PROMETHEE-Based Multicriteria Approach
Polycentricity is a multiscalar concept referring to the interconnections of neighboring spatial areas in search of synergies. More specifically, urban polycentricity has lately gained increasing momentum in academic research and strategic planning as urban polycentric structures could stimulate urban and regional performance in a sustainable way. Architectural heritage, with its connotative meanings, is among the indicators of incorporation in polycentric networking. The present paper investigates the challenges of implementing urban polycentricity methodological approaches to highlight new polycentric networks based on built architectural heritage. In this study, appointed architectural assets are considered as nodes of the potential networks. As a new research strand, the MCDA PROMETHEE method is applied to compile and assemble all indicators (namely, rank size and node hierarchy, accessibility, transportation, and digital promotion). The ultimate research goal is to build a new polycentricity index as an innovative methodological tool to highlight polycentric networking synergies on interurban and intraregional scales. The region of Thrace in Northern Greece is chosen to apply the proposed methodology. Research on ways to couple polycentricity and PROMETHEE methods is limited, and thus, the proposed methodological approach is expected to contribute to the field of urban and regional strategies for researchers and practitioners.
Open AccessUrban Polycentricity and Architectural Heritage: A PROMETHEE-Based Multicriteria Approach
Polycentricity is a multiscalar concept referring to the interconnections of neighboring spatial areas in search of synergies. More specifically, urban polycentricity has lately gained increasing momentum in academic research and strategic planning as urban polycentric structures could stimulate urban and regional performance in a sustainable way. Architectural heritage, with its connotative meanings, is among the indicators of incorporation in polycentric networking. The present paper investigates the challenges of implementing urban polycentricity methodological approaches to highlight new polycentric networks based on built architectural heritage. In this study, appointed architectural assets are considered as nodes of the potential networks. As a new research strand, the MCDA PROMETHEE method is applied to compile and assemble all indicators (namely, rank size and node hierarchy, accessibility, transportation, and digital promotion). The ultimate research goal is to build a new polycentricity index as an innovative methodological tool to highlight polycentric networking synergies on interurban and intraregional scales. The region of Thrace in Northern Greece is chosen to apply the proposed methodology. Research on ways to couple polycentricity and PROMETHEE methods is limited, and thus, the proposed methodological approach is expected to contribute to the field of urban and regional strategies for researchers and practitioners.
- 1 July 2024
- Published by IATED Academy in EDULEARN Proceedings
- Vol. 1, 10490-10495
MATCHING GROUPS OF STUDENTS AND INSTRUCTORS IN DISTANCE EDUCATION: LITERATURE REVIEW AND A BIBLIOMETRIC ANALYSIS
- 1 July 2024
- Published by IATED Academy in EDULEARN Proceedings
- Vol. 1, 10490-10495
MATCHING GROUPS OF STUDENTS AND INSTRUCTORS IN DISTANCE EDUCATION: LITERATURE REVIEW AND A BIBLIOMETRIC ANALYSIS
- 1 July 2024
- Published by IATED Academy in EDULEARN Proceedings
- Vol. 1, 10496-10504
MULTICRITERIA ANALYSIS AND DISTANCE LEARNING. CONCEPTS AND SYNERGIES THROUGH A LITERATURE REVIEW AND BIBLIOMETRIC ANALYSIS
- 1 July 2024
- Published by IATED Academy in EDULEARN Proceedings
- Vol. 1, 10496-10504
MULTICRITERIA ANALYSIS AND DISTANCE LEARNING. CONCEPTS AND SYNERGIES THROUGH A LITERATURE REVIEW AND BIBLIOMETRIC ANALYSIS
- Open Access
A Final Cost Estimating Model for Building Renovation Projects
The construction sector in Greece has been developing radically in the field of building renovations. The foremost problem for projects in the building construction industry is producing an accurate and reliable cost estimate at the onset of construction. The artificial neural network (AΝΝ) approach, using data available at the early stages of the project, can help resolve or prevent any kind of difficulty that could make the successful completion of a building less likely. ANNs have been highly efficient in gaining results which could prevent the failure of building constructions projects. The ultimate goal is to highlight the usefulness of the adoption of ANNs models to predict the final cost of a building renovation project. Thus, construction companies could avoid financial failure, provided that the gap between cost prediction and final cost for renovation projects is minimized. This paper presents an artificial neural network (ANN) approach for predicting renovation costs in Greek construction projects. The study, based on a comprehensive literature review and real renovation data from construction companies, employs IBM SPSS Statistics software to build, train, and test the ANN model. The model, which uses initial cost, estimated time, and initial demolition cost as inputs, is based on the radial basis function procedure. The model presents high performance with up to 2% sum of squares error and near zero relative error, demonstrating the ANN’s effectiveness in estimating total renovation costs.
Open AccessA Final Cost Estimating Model for Building Renovation Projects
The construction sector in Greece has been developing radically in the field of building renovations. The foremost problem for projects in the building construction industry is producing an accurate and reliable cost estimate at the onset of construction. The artificial neural network (AΝΝ) approach, using data available at the early stages of the project, can help resolve or prevent any kind of difficulty that could make the successful completion of a building less likely. ANNs have been highly efficient in gaining results which could prevent the failure of building constructions projects. The ultimate goal is to highlight the usefulness of the adoption of ANNs models to predict the final cost of a building renovation project. Thus, construction companies could avoid financial failure, provided that the gap between cost prediction and final cost for renovation projects is minimized. This paper presents an artificial neural network (ANN) approach for predicting renovation costs in Greek construction projects. The study, based on a comprehensive literature review and real renovation data from construction companies, employs IBM SPSS Statistics software to build, train, and test the ANN model. The model, which uses initial cost, estimated time, and initial demolition cost as inputs, is based on the radial basis function procedure. The model presents high performance with up to 2% sum of squares error and near zero relative error, demonstrating the ANN’s effectiveness in estimating total renovation costs.