Fani Antoniou
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Research Interests
Fani Antoniou has a total of 25 co-authors. Here are the top co-authors by number of shared publications:
- Georgios N. Aretoulis
Laboratory of Planning and Project Management, School of Civil Engineering, Faculty of Engineering, Aristotle University of Thessaloniki, Aristotle University of Thessaloniki Campus, 54124 Thessaloniki, Greece
12 shared publications - Dimitrios Konstantinidis
Department of Civil Engineering, Alexander Technological Educational Institute of Thessaloniki, Thessaloniki, Greece
5 shared publications - Marina Marinelli
School of Civil Engineering, National Technical University of Athens, Zografou Campus, Iroon Politechniou 9, Zografou, 15772 Athens, Greece
4 shared publications Glykeria P. Kalfakakou
Aristotle University of Thessaloniki, Greece
3 shared publications- Marianna Kalogeraki
Department of Environmental Engineering, International Hellenic University, 57400 Sindos, Greece
3 shared publications - Alexandra Vassiliki Tsioulpa
Department of Environmental Engineering, International Hellenic University, 57 400 Sindos, Greece
2 shared publications
Latest Publications
- 20 October 2026
- Published by Emerald Publishing in International Journal of Managing Projects in Business
- p. 1-26
The law of supply and demand applied to project data management: a novel concept
Purpose: To introduce a novel exploratory conceptual framework which adapts the classical economic Law of Supply and Demand (LoS&D) to project data management and reframes time as the regulatory factor to optimise the timing and value of data for confident decision-making throughout the project lifecycle. Design/methodology/approach: This conceptual study adopts a qualitative theory-adaptation methodology to bridge economic principles and project data environments supported by three systematic literature reviews to investigate whether LoS&D principles have been previously applied to project data environments. Findings: It is confirmed that LoS&D has not previously been applied to the management of project data. Two exploratory constructs are defined, i.e. Data Equilibrium (DE) and Time Equilibrium (TE), to represent the balance between data supply and demand. These constructs are operationalised through organisational and project-level examples while examining their interaction with modern data governance and data science tools. Furthermore, the study evaluates the conceptual, organisational, behavioural and technological challenges to real-world implementation and synthesises these insights into a structured research agenda. Originality/value: The article offers originality by proposing a novel concept that has the potential to transform the management of project data from a routine administrative function into a predictive system. The exploratory conceptual framework provides an initial roadmap for treating project data as analogous to a dynamic “value asset”, reframing traditional challenges like data overload or scarcity as measurable imbalances in a lifecycle-driven system and proposes a comprehensive future research agenda that identifies research priorities, questions and methodologies for theory development and empirical validation.
- 20 October 2026
- Published by Emerald Publishing in International Journal of Managing Projects in Business
- p. 1-26
The law of supply and demand applied to project data management: a novel concept
Purpose: To introduce a novel exploratory conceptual framework which adapts the classical economic Law of Supply and Demand (LoS&D) to project data management and reframes time as the regulatory factor to optimise the timing and value of data for confident decision-making throughout the project lifecycle. Design/methodology/approach: This conceptual study adopts a qualitative theory-adaptation methodology to bridge economic principles and project data environments supported by three systematic literature reviews to investigate whether LoS&D principles have been previously applied to project data environments. Findings: It is confirmed that LoS&D has not previously been applied to the management of project data. Two exploratory constructs are defined, i.e. Data Equilibrium (DE) and Time Equilibrium (TE), to represent the balance between data supply and demand. These constructs are operationalised through organisational and project-level examples while examining their interaction with modern data governance and data science tools. Furthermore, the study evaluates the conceptual, organisational, behavioural and technological challenges to real-world implementation and synthesises these insights into a structured research agenda. Originality/value: The article offers originality by proposing a novel concept that has the potential to transform the management of project data from a routine administrative function into a predictive system. The exploratory conceptual framework provides an initial roadmap for treating project data as analogous to a dynamic “value asset”, reframing traditional challenges like data overload or scarcity as measurable imbalances in a lifecycle-driven system and proposes a comprehensive future research agenda that identifies research priorities, questions and methodologies for theory development and empirical validation.
- Open Access
- 10 August 2026
- Published by MDPI AG in Sustainability
- Vol. 18 (16) , 8154
ESG Maturity in the Construction Industry: A Global Review and New Insights from Greece
The objectives of this study are to evaluate the level of awareness and readiness for adoption of practices related to ESG criteria and sustainability in the construction industry. Following a systematic literature review it is revealed that by 2023, only 19 scientific publications had addressed ESG issues specifically within the construction sector while in the past two years, nearly three times as many were published, a fact that demonstrates the growing research interest in ESG practices in the construction sector. It provides new empirical insights by focusing on small to medium enterprises in the Greek construction industry rather than large construction companies with established ESG reporting strategies. Interviews using open-ended questionnaires constructed based on the core ESG indicators defined in the 2022 ESG Disclosure Guidelines published by the Athens Stock Exchange Data collection, were carried out to collect data on the subject. It is shown that most SMEs demonstrate low awareness of formal ESG frameworks and insufficient readiness to adopt ESG practices. In some cases, it was found that sustainability actions exist for limited numbers of ESG indicators, but they are not integrated into a structured ESG company strategy. Overall, the results emphasize the emerging importance of ESG criteria for the construction sector and highlight the need for clearer guidelines, stronger support mechanisms, and standardized assessment tools to advance ESG adoption and support the industry’s improvement in its sustainability performance. To support industry transition, the study concludes with a practical ESG implementation roadmap designed to help Greek construction SMEs progress toward structured, measurable, and scalable sustainability practices.
- 10 August 2026
- Published by MDPI AG in Sustainability
- Vol. 18 (16) , 8154
Open AccessESG Maturity in the Construction Industry: A Global Review and New Insights from Greece
The objectives of this study are to evaluate the level of awareness and readiness for adoption of practices related to ESG criteria and sustainability in the construction industry. Following a systematic literature review it is revealed that by 2023, only 19 scientific publications had addressed ESG issues specifically within the construction sector while in the past two years, nearly three times as many were published, a fact that demonstrates the growing research interest in ESG practices in the construction sector. It provides new empirical insights by focusing on small to medium enterprises in the Greek construction industry rather than large construction companies with established ESG reporting strategies. Interviews using open-ended questionnaires constructed based on the core ESG indicators defined in the 2022 ESG Disclosure Guidelines published by the Athens Stock Exchange Data collection, were carried out to collect data on the subject. It is shown that most SMEs demonstrate low awareness of formal ESG frameworks and insufficient readiness to adopt ESG practices. In some cases, it was found that sustainability actions exist for limited numbers of ESG indicators, but they are not integrated into a structured ESG company strategy. Overall, the results emphasize the emerging importance of ESG criteria for the construction sector and highlight the need for clearer guidelines, stronger support mechanisms, and standardized assessment tools to advance ESG adoption and support the industry’s improvement in its sustainability performance. To support industry transition, the study concludes with a practical ESG implementation roadmap designed to help Greek construction SMEs progress toward structured, measurable, and scalable sustainability practices.
- Open Access
Sustainability Certifications in Building Projects: Adoption Insights from the Greek Construction Sector in the European Context
Sustainability certification schemes (SCSs) such as LEED, BREEAM, etc., are widely accepted as an effective tool for the promotion of sustainable design principles and lifecycle carbon reduction in building projects. Greece, despite having a relatively small real estate market, presents solid activity in this field, but the related research remains extremely limited. Following a comprehensive quantitative data analysis regarding the use of SCSs in Greece and Europe, this paper examines adoption determinants, challenges, and prospects in the Greek construction sector, drawing on semi-structured interviews. The findings show that LEED dominates the Greek market, and although the SCS benefits are well documented in the literature, the overall market demand is largely confined to office and commercial developments and constrained by affordability concerns, low market awareness, supply chain constraints, administrative complexity, and project coordination challenges. Nevertheless, as future prospects are positive overall, the research provides recommendations towards targeted actions for policy-makers, industry professionals, and other stakeholders. This can encourage supply chain development and accelerate certification uptake, thereby supporting national sustainability objectives and the implementation of European climate and energy policies.
Open AccessSustainability Certifications in Building Projects: Adoption Insights from the Greek Construction Sector in the European Context
Sustainability certification schemes (SCSs) such as LEED, BREEAM, etc., are widely accepted as an effective tool for the promotion of sustainable design principles and lifecycle carbon reduction in building projects. Greece, despite having a relatively small real estate market, presents solid activity in this field, but the related research remains extremely limited. Following a comprehensive quantitative data analysis regarding the use of SCSs in Greece and Europe, this paper examines adoption determinants, challenges, and prospects in the Greek construction sector, drawing on semi-structured interviews. The findings show that LEED dominates the Greek market, and although the SCS benefits are well documented in the literature, the overall market demand is largely confined to office and commercial developments and constrained by affordability concerns, low market awareness, supply chain constraints, administrative complexity, and project coordination challenges. Nevertheless, as future prospects are positive overall, the research provides recommendations towards targeted actions for policy-makers, industry professionals, and other stakeholders. This can encourage supply chain development and accelerate certification uptake, thereby supporting national sustainability objectives and the implementation of European climate and energy policies.
- Open Access
- 19 September 2025
- Published by MDPI AG in Applied Sciences
- Vol. 15 (18) , 10237
Client-Oriented Highway Construction Cost Estimation Models Using Machine Learning
Accurate cost estimation during the conceptual and feasibility phase of highway projects is essential for informed decision making by public contracting authorities. Existing approaches often rely on pavement cross-section descriptors, general project classifications, or quantity estimates of major work categories that are not reliably available at the early planning stage, while focusing on one or more key asset categories such as roadworks, bridges or tunnels. This study makes a novel contribution to both scientific literature and practice by proposing the first early-stage highway construction cost estimation model that explicitly incorporates roadworks, interchanges, tunnels and bridges, using only readily available or easily derived geometric characteristics. A comprehensive and practical approach was adopted by developing and comparing models across multiple machine learning (ML) methods, including Multilayer Perceptron-Artificial Neural Network (MLP-ANN), Radial Basis Function-Artificial Neural Network (RBF-ANN), Multiple Linear Regression (MLR), Random Forests (RF), Support Vector Regression (SVR), XGBoost Technique, and K-Nearest Neighbors (KNN). Results demonstrate that the MLR model based on six independent variables—mainline length, service road length, number of interchanges, total area of structures, tunnel length, and number of culverts—consistently outperformed more complex alternatives. The full MLR model, including its coefficients and standardized parameters, is provided, enabling direct replication and immediate use by contracting authorities, hence supporting more informed decisions on project funding and procurement.
- 19 September 2025
- Published by MDPI AG in Applied Sciences
- Vol. 15 (18) , 10237
Open AccessClient-Oriented Highway Construction Cost Estimation Models Using Machine Learning
Accurate cost estimation during the conceptual and feasibility phase of highway projects is essential for informed decision making by public contracting authorities. Existing approaches often rely on pavement cross-section descriptors, general project classifications, or quantity estimates of major work categories that are not reliably available at the early planning stage, while focusing on one or more key asset categories such as roadworks, bridges or tunnels. This study makes a novel contribution to both scientific literature and practice by proposing the first early-stage highway construction cost estimation model that explicitly incorporates roadworks, interchanges, tunnels and bridges, using only readily available or easily derived geometric characteristics. A comprehensive and practical approach was adopted by developing and comparing models across multiple machine learning (ML) methods, including Multilayer Perceptron-Artificial Neural Network (MLP-ANN), Radial Basis Function-Artificial Neural Network (RBF-ANN), Multiple Linear Regression (MLR), Random Forests (RF), Support Vector Regression (SVR), XGBoost Technique, and K-Nearest Neighbors (KNN). Results demonstrate that the MLR model based on six independent variables—mainline length, service road length, number of interchanges, total area of structures, tunnel length, and number of culverts—consistently outperformed more complex alternatives. The full MLR model, including its coefficients and standardized parameters, is provided, enabling direct replication and immediate use by contracting authorities, hence supporting more informed decisions on project funding and procurement.
- Open Access
Ranking Public Infrastructure Project Success Using Multi-Criteria Analysis
Project success is a complex and debated concept in construction project management, even more so for public sector infrastructure projects. This study proposes a new, data-driven methodology to assess the success of public infrastructure projects using a multi-criteria decision-making framework. By utilizing empirical data from 30 completed road infrastructure projects the study applies the Technique for Order Preference by Similarity to Ideal Situation (TOPSIS) method to evaluate performance across four key success criteria: cost, time, quality, and project management. An integrated Success Index (SI) was then calculated using the Simple Additive Weighting (SAW) method under two different weighting scenarios. Results show that projects with shorter durations and simpler scopes consistently achieved higher SI scores, while larger, more complex projects were more prone to delays, cost overruns, and quality issues. This study contributes to scientific research by utilizing real, archival project data rather than relying on expert opinions to quantify project success from the client contracting authority’s perspective rather than that of the contractor. Hence, the proposed model serves as a practical, adaptable tool for public contracting authorities seeking to benchmark and improve project performance.
Open AccessRanking Public Infrastructure Project Success Using Multi-Criteria Analysis
Project success is a complex and debated concept in construction project management, even more so for public sector infrastructure projects. This study proposes a new, data-driven methodology to assess the success of public infrastructure projects using a multi-criteria decision-making framework. By utilizing empirical data from 30 completed road infrastructure projects the study applies the Technique for Order Preference by Similarity to Ideal Situation (TOPSIS) method to evaluate performance across four key success criteria: cost, time, quality, and project management. An integrated Success Index (SI) was then calculated using the Simple Additive Weighting (SAW) method under two different weighting scenarios. Results show that projects with shorter durations and simpler scopes consistently achieved higher SI scores, while larger, more complex projects were more prone to delays, cost overruns, and quality issues. This study contributes to scientific research by utilizing real, archival project data rather than relying on expert opinions to quantify project success from the client contracting authority’s perspective rather than that of the contractor. Hence, the proposed model serves as a practical, adaptable tool for public contracting authorities seeking to benchmark and improve project performance.
- Open Access
- 20 November 2024
- Published by MDPI AG in Sustainability
- Vol. 16 (22) , 10143
Ranking the Barriers to the Energy Upgrading of Buildings Using the Best-Worst Method
The global need to reduce energy demand has led European governments to accelerate their endeavors to achieve their targets regarding nearly zero-energy buildings. Despite the implementation of funding initiatives for the energy upgrading of buildings in EU member states and other European countries, research has shown that the absorption rates of the offered funds remain low. This research aims to assess the significance of the barriers to improving the energy efficiency of Greece’s building stock. This is achieved by ranking the identified barriers using the best-worst method (BWM). The innovation provided by this study is that the data obtained are based on the experience of three categories of stakeholders, including professionals in the field, i.e., engineers and skilled workers, and homeowners. The results show that all three groups are discouraged from performing the energy upgrading of buildings due to economic barriers but also technological barriers related to a lack of training in the use of and slow development of related new technologies.
- 20 November 2024
- Published by MDPI AG in Sustainability
- Vol. 16 (22) , 10143
Open AccessRanking the Barriers to the Energy Upgrading of Buildings Using the Best-Worst Method
The global need to reduce energy demand has led European governments to accelerate their endeavors to achieve their targets regarding nearly zero-energy buildings. Despite the implementation of funding initiatives for the energy upgrading of buildings in EU member states and other European countries, research has shown that the absorption rates of the offered funds remain low. This research aims to assess the significance of the barriers to improving the energy efficiency of Greece’s building stock. This is achieved by ranking the identified barriers using the best-worst method (BWM). The innovation provided by this study is that the data obtained are based on the experience of three categories of stakeholders, including professionals in the field, i.e., engineers and skilled workers, and homeowners. The results show that all three groups are discouraged from performing the energy upgrading of buildings due to economic barriers but also technological barriers related to a lack of training in the use of and slow development of related new technologies.
- 17 September 2024
- Published by Springer Nature in Life Cycle Reliability and Safety Engineering
- Vol. 13 (4) , 483-503
Qualitative prioritization of accident risks in the mining industry
- 17 September 2024
- Published by Springer Nature in Life Cycle Reliability and Safety Engineering
- Vol. 13 (4) , 483-503
Qualitative prioritization of accident risks in the mining industry
- Open Access
Claim Management and Dispute Resolution in the Construction Industry: Current Research Trends Using Novel Technologies
In the Architecture, Engineering and Construction (AEC) industry claims arise frequently, often resulting in disputes. Claim management should be efficient to prevent claims from escalating into disputes, and if disputes are still unavoidable, they should be resolved without delay for the construction process to resume. First, by conducting a bibliometric review, this paper attempts to investigate the literature on construction claims and dispute resolution practices by employing the Scopus database and VOSviewer to retrieve and analyze related sources. The overall trend of research by country, source, and authors is detected, and the emergence of novel technologies such as BIM, blockchain, and smart contracts appearing after 2020 concerning the investigation into construction claim management and dispute resolution was identified. Second, a content analysis on the most recent publications published between 2020 and 2022 was undertaken, indicating six main research themes that represent current research trends. The employment of novel technologies to enhance claim management and dispute resolution practices in the AEC sector is identified, as well. Finally, in order to assist construction professionals and researchers in their work to address construction claims and disputes more efficiently, potential research directions are proposed.
Open AccessClaim Management and Dispute Resolution in the Construction Industry: Current Research Trends Using Novel Technologies
In the Architecture, Engineering and Construction (AEC) industry claims arise frequently, often resulting in disputes. Claim management should be efficient to prevent claims from escalating into disputes, and if disputes are still unavoidable, they should be resolved without delay for the construction process to resume. First, by conducting a bibliometric review, this paper attempts to investigate the literature on construction claims and dispute resolution practices by employing the Scopus database and VOSviewer to retrieve and analyze related sources. The overall trend of research by country, source, and authors is detected, and the emergence of novel technologies such as BIM, blockchain, and smart contracts appearing after 2020 concerning the investigation into construction claim management and dispute resolution was identified. Second, a content analysis on the most recent publications published between 2020 and 2022 was undertaken, indicating six main research themes that represent current research trends. The employment of novel technologies to enhance claim management and dispute resolution practices in the AEC sector is identified, as well. Finally, in order to assist construction professionals and researchers in their work to address construction claims and disputes more efficiently, potential research directions are proposed.
- Open Access
Should We Depend on Expert Opinion or Statistics? A Meta-Analysis of Accident-Contributing Factors in Construction
International research overflows with studies looking into the causes of construction accidents. Hundreds of studies by postgraduate students in the past 20 years focus on identifying and assessing risks contributing to accidents on Greek construction workplace sites. Many base their work on results from questionnaire surveys that collect the opinions of construction site professionals or on the analysis of data from actual accident records or statistics. Consequently, this study seeks to determine if the data source leads to differing conclusions by using two techniques to synthesize individual results and rank the accident-contributing factors investigated in the original studies. The first utilizes their relative importance index (RII) values, and the second uses their overall ranking index (ORI) to execute meta-analyses. The professional opinion concludes that factors related to operative behavior are the most significant accident-contributing factors. At the same time, actual accident statistics point to site risk factors of the construction process itself as the most important, indicating that expert opinion of Greek professionals should be considered in conjunction with data from actual accident records to provide the focus points for mitigation and assurance of safe construction sites in Greece.
Open AccessShould We Depend on Expert Opinion or Statistics? A Meta-Analysis of Accident-Contributing Factors in Construction
International research overflows with studies looking into the causes of construction accidents. Hundreds of studies by postgraduate students in the past 20 years focus on identifying and assessing risks contributing to accidents on Greek construction workplace sites. Many base their work on results from questionnaire surveys that collect the opinions of construction site professionals or on the analysis of data from actual accident records or statistics. Consequently, this study seeks to determine if the data source leads to differing conclusions by using two techniques to synthesize individual results and rank the accident-contributing factors investigated in the original studies. The first utilizes their relative importance index (RII) values, and the second uses their overall ranking index (ORI) to execute meta-analyses. The professional opinion concludes that factors related to operative behavior are the most significant accident-contributing factors. At the same time, actual accident statistics point to site risk factors of the construction process itself as the most important, indicating that expert opinion of Greek professionals should be considered in conjunction with data from actual accident records to provide the focus points for mitigation and assurance of safe construction sites in Greece.
- Open Access
Assessing the Delay, Cost, and Quality Risks of Claims on Construction Contract Performance
Conflicts are frequent within the complex professional environment of the construction industry. If claims cannot be overcome amicably, they result in disputes that lead to litigation. Identification of the causes of these claims and their impact on the duration, cost, and quality of the final project is expected to facilitate the prevention of unsuccessful performance of construction contracts. The novelty of this study is that after codifying the most common causes of construction contract claims derived from the extant literature, they are further investigated in terms of their probability of occurrence and the perceived impact they have on the project completion time, its total cost, and quality. Based on calculated relative importance indices from expert opinion, this paper proposes probability and severity of impact values for 39 common causes of claims in the construction industry. These can be applied to calculate their risk values for stakeholders in public construction contracts to plan mitigation measures for contractual claims. The findings show that the top five highest risk causes of contractual claims in the Greek construction industry are changes in quantities, work, or scope, design quality deficiencies or errors, payment delays, delays in work progress, and the financial failure of the contractor.
Open AccessAssessing the Delay, Cost, and Quality Risks of Claims on Construction Contract Performance
Conflicts are frequent within the complex professional environment of the construction industry. If claims cannot be overcome amicably, they result in disputes that lead to litigation. Identification of the causes of these claims and their impact on the duration, cost, and quality of the final project is expected to facilitate the prevention of unsuccessful performance of construction contracts. The novelty of this study is that after codifying the most common causes of construction contract claims derived from the extant literature, they are further investigated in terms of their probability of occurrence and the perceived impact they have on the project completion time, its total cost, and quality. Based on calculated relative importance indices from expert opinion, this paper proposes probability and severity of impact values for 39 common causes of claims in the construction industry. These can be applied to calculate their risk values for stakeholders in public construction contracts to plan mitigation measures for contractual claims. The findings show that the top five highest risk causes of contractual claims in the Greek construction industry are changes in quantities, work, or scope, design quality deficiencies or errors, payment delays, delays in work progress, and the financial failure of the contractor.