Renato de Matta
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Renato de Matta has a total of 2 co-authors. Here are the top co-authors by number of shared publications:
- Vernon N. Hsu
The Chinese University of Hong Kong, Department of Decision Sciences and Managerial Economics, Shatin, New Territories, Hong Kong
2 shared publications - Timothy J. Lowe
Tippie College of Business, University of Iowa
1 shared publication
Latest Publications
- 26 October 2021
- Published by Springer Nature in Annals of Operations Research
- Vol. 320 (2) , 695-725
Product price alignment with seller service rating and consumer satisfaction
- 26 October 2021
- Published by Springer Nature in Annals of Operations Research
- Vol. 320 (2) , 695-725
Product price alignment with seller service rating and consumer satisfaction
- 1 September 2021
- Published by Taylor & Francis in IISE Transactions on Healthcare Systems Engineering
- Vol. 12 (2) , 111-129
Patient-centric surgeons’ case mix problem
This paper studies a single-period tactical planning problem to find the surgeons’ case mix of a hospital surgical unit such that the total patient value per dollar spent on healthcare resources (the TPV) is maximized. We represent the relationship between the surgeons’ volume and patient outcomes using the learning curve. We formulate the problem as a nonlinear integer programming model. The problem belongs to the class of nonquadratic transportation problems in which it is proven that no algorithm solving the problem in strongly polynomial time exists. We develop a Lagrangian-based heuristic solution approach that exploits the special structure of the problem. Using simulated and real data, we show that the diversity in surgeons’ experience complements a surgical unit in a way that good patient outcomes of experienced surgeons counterbalance the average but improving patient outcomes of less experienced surgeons while the less experienced surgeons gain more experience.
- 1 September 2021
- Published by Taylor & Francis in IISE Transactions on Healthcare Systems Engineering
- Vol. 12 (2) , 111-129
Patient-centric surgeons’ case mix problem
This paper studies a single-period tactical planning problem to find the surgeons’ case mix of a hospital surgical unit such that the total patient value per dollar spent on healthcare resources (the TPV) is maximized. We represent the relationship between the surgeons’ volume and patient outcomes using the learning curve. We formulate the problem as a nonlinear integer programming model. The problem belongs to the class of nonquadratic transportation problems in which it is proven that no algorithm solving the problem in strongly polynomial time exists. We develop a Lagrangian-based heuristic solution approach that exploits the special structure of the problem. Using simulated and real data, we show that the diversity in surgeons’ experience complements a surgical unit in a way that good patient outcomes of experienced surgeons counterbalance the average but improving patient outcomes of less experienced surgeons while the less experienced surgeons gain more experience.
- 11 November 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Engineering Management
- Vol. 69 (6) , 3154-3170
Integrating Inventory-Based Financing in Production Planning Decisions
In this article, we study a multiproduct multiperiod production planning problem faced by a cash-strapped manufacturer, who utilizes inventory-based financing (IBF) to capture additional demand during peak season, which otherwise will not be met due to cash shortage. Each product has a unique selling season and its production incurs a significant setup cost. We formulate the problem as an integer program and show the special case with one product is NP-hard. By exploiting the inherent structure of three distinct but related decisions, i.e., the production, financing, and working capital allocation decisions, we develop a Lagrangian relaxation-based branch-and-bound procedure to solve the model. Through a series of numerical experiments using real data, this article presents managerial insights into how the manufacturer's optimal production plan could differ with and without IBF. In an optimal plan, we show the profit maximizing strategy for the cash-strapped manufacturer is to overstock and pledge inventories to secure more loans prior to peak demand periods.
- 11 November 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Engineering Management
- Vol. 69 (6) , 3154-3170
Integrating Inventory-Based Financing in Production Planning Decisions
In this article, we study a multiproduct multiperiod production planning problem faced by a cash-strapped manufacturer, who utilizes inventory-based financing (IBF) to capture additional demand during peak season, which otherwise will not be met due to cash shortage. Each product has a unique selling season and its production incurs a significant setup cost. We formulate the problem as an integer program and show the special case with one product is NP-hard. By exploiting the inherent structure of three distinct but related decisions, i.e., the production, financing, and working capital allocation decisions, we develop a Lagrangian relaxation-based branch-and-bound procedure to solve the model. Through a series of numerical experiments using real data, this article presents managerial insights into how the manufacturer's optimal production plan could differ with and without IBF. In an optimal plan, we show the profit maximizing strategy for the cash-strapped manufacturer is to overstock and pledge inventories to secure more loans prior to peak demand periods.
- Open Access
- 1 October 2020
- Published by Emerald Publishing in Foundations and Trends® in Technology, Information and Operations Management
- Vol. 14 (1-2) , 147-164
Production Planning with Inventory-Based Financing
This paper uses a mixed integer programming model to study a production and inventory planning problem faced by a manufacturer who utilizes Inventory-Based Financing (IBF) to capture additional demands during peak seasons that otherwise will not be met due to a shortage of working capital. By exploiting the problem's inherent structure of three distinct but related manufacturer decisions, i.e., the production, financing and working capital allocation decisions, the paper develops a branch-and-bound procedure to solve the model which is shown to be NP-hard. Through a series of numerical experiments, our study provides a number of interesting managerial insights into how the manufacturer's optimal production and inventory plans could differ with and without IBF. Specifically, we find that (a) the manufacturer would strategically overstock his inventory for the purpose of securing more loans, and this overstocking behavior is more acute in periods immediately prior to the peak demand period; and (b) the manufacturer could take advantage of the difference in peak and non-peak seasons of product demands by partially financing the production of one product through pledging the cycle inventory of another product.
- 1 October 2020
- Published by Emerald Publishing in Foundations and Trends® in Technology, Information and Operations Management
- Vol. 14 (1-2) , 147-164
Open AccessProduction Planning with Inventory-Based Financing
This paper uses a mixed integer programming model to study a production and inventory planning problem faced by a manufacturer who utilizes Inventory-Based Financing (IBF) to capture additional demands during peak seasons that otherwise will not be met due to a shortage of working capital. By exploiting the problem's inherent structure of three distinct but related manufacturer decisions, i.e., the production, financing and working capital allocation decisions, the paper develops a branch-and-bound procedure to solve the model which is shown to be NP-hard. Through a series of numerical experiments, our study provides a number of interesting managerial insights into how the manufacturer's optimal production and inventory plans could differ with and without IBF. Specifically, we find that (a) the manufacturer would strategically overstock his inventory for the purpose of securing more loans, and this overstocking behavior is more acute in periods immediately prior to the peak demand period; and (b) the manufacturer could take advantage of the difference in peak and non-peak seasons of product demands by partially financing the production of one product through pledging the cycle inventory of another product.
- 2 October 2017
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 56 (19) , 6412-6429
Scheduling a manufacturing process with restrictions on resource availability
This paper examines the scheduling of a drug packaging operation which requires assigning resources to production lines during set-up in order to satisfy product specifications. We present mixed integer programming models of the problem and develop a Lagrangian heuristic to solve the models. Real data from a drug company and randomly generated data are used to test the models. Results show the efficacy of our solution approach to find good feasible schedules. We discuss some of the practical benefits and potential issues about the production schedules obtained using the models.
- 2 October 2017
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 56 (19) , 6412-6429
Scheduling a manufacturing process with restrictions on resource availability
This paper examines the scheduling of a drug packaging operation which requires assigning resources to production lines during set-up in order to satisfy product specifications. We present mixed integer programming models of the problem and develop a Lagrangian heuristic to solve the models. Real data from a drug company and randomly generated data are used to test the models. Results show the efficacy of our solution approach to find good feasible schedules. We discuss some of the practical benefits and potential issues about the production schedules obtained using the models.
- 16 March 2017
- Published by Springer Nature in Annals of Operations Research
- Vol. 272 (1-2) , 389-427
Product costing in the strategic formation of a supply chain
- 16 March 2017
- Published by Springer Nature in Annals of Operations Research
- Vol. 272 (1-2) , 389-427
Product costing in the strategic formation of a supply chain
- 28 September 2016
- Published by Wiley in International Transactions in Operational Research
- Vol. 26 (3) , 1096-1117
Minimizing the total waiting time of intermediate products in a manufacturing process
A mixed model production plan may use a schedule that will consecutively produce a small batch of each product model on a production line. However, it may be necessary to deviate from this schedule and produce the models in larger batches at a manufacturing cell in the production line if the manufacturing cell cannot support many setups. A potential problem with large batches is that products that are produced early must wait for its turn at the next step of the production process. When additional operations are performed on products that wait in order to restore its quality, it is imperative to schedule production such that the total time products wait is minimized. We model the problem as scheduling jobs on a single machine with setups and deadlines such that the total waiting time is minimized. We develop a tabu search based heuristic and branch‐and‐bound algorithm to solve the model. Results show that the heuristic solution to 30‐product–3‐product model problems is within 3% of its optimal solution.
- 28 September 2016
- Published by Wiley in International Transactions in Operational Research
- Vol. 26 (3) , 1096-1117
Minimizing the total waiting time of intermediate products in a manufacturing process
A mixed model production plan may use a schedule that will consecutively produce a small batch of each product model on a production line. However, it may be necessary to deviate from this schedule and produce the models in larger batches at a manufacturing cell in the production line if the manufacturing cell cannot support many setups. A potential problem with large batches is that products that are produced early must wait for its turn at the next step of the production process. When additional operations are performed on products that wait in order to restore its quality, it is imperative to schedule production such that the total time products wait is minimized. We model the problem as scheduling jobs on a single machine with setups and deadlines such that the total waiting time is minimized. We develop a tabu search based heuristic and branch‐and‐bound algorithm to solve the model. Results show that the heuristic solution to 30‐product–3‐product model problems is within 3% of its optimal solution.
- 6 January 2016
- Published by Springer Nature in Annals of Operations Research
- Vol. 257 (1-2) , 45-75
Contingency planning during the formation of a supply chain
- 6 January 2016
- Published by Springer Nature in Annals of Operations Research
- Vol. 257 (1-2) , 45-75
Contingency planning during the formation of a supply chain