Abstract
A mixed model production plan may use a schedule that will consecutively produce a small batch of each product model on a production line. However, it may be necessary to deviate from this schedule and produce the models in larger batches at a manufacturing cell in the production line if the manufacturing cell cannot support many setups. A potential problem with large batches is that products that are produced early must wait for its turn at the next step of the production process. When additional operations are performed on products that wait in order to restore its quality, it is imperative to schedule production such that the total time products wait is minimized. We model the problem as scheduling jobs on a single machine with setups and deadlines such that the total waiting time is minimized. We develop a tabu search based heuristic and branch‐and‐bound algorithm to solve the model. Results show that the heuristic solution to 30‐product–3‐product model problems is within 3% of its optimal solution.
Funding Information
  • Lary and Lori Wright Research Fellowship

This publication has 23 references indexed in Scilit: