Zhe Xu
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Zhe Xu has a total of 10 co-authors. Here are the top co-authors by number of shared publications:
Song Zhao
School of Economics and Management Beihang University Beijing 100191 China
5 shared publicationsYining Yu
School of Economics and Management Beihang University Beijing 100191 China
3 shared publicationsDongning Liu
2 shared publicationsFang Xie
Shandong Technology and Business University
1 shared publicationFeifei Li
School of Economics and Management, Beihang University, Beijing, China
1 shared publicationJiayi Zhao
Beihang Univ
1 shared publication
Latest Publications
- 1 September 2026
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 152 (9)
A Generalizable Deep Reinforcement Learning–Based Algorithm for Priority Rule Scheduling in Stochastic Resource-Constrained Project Scheduling
In practical construction project scheduling, deterministic project information is available at the planning stage, and uncertainty arises during project execution. For the stochastic resource-constrained project scheduling problem (SRCPSP), existing approaches typically infer probability distributions from historical data or expert judgment during planning. However, accurately estimating such distributions is often difficult in practice. Accordingly, this study proposes a deep reinforcement learning (DRL)–based framework for online solution of the SRCPSP. The scheduling process is formulated as a Markov decision problem, and a multi-instance trained DRL agent is developed to dynamically select priority rules (PRs) during execution, based on deterministic information available at the planning stage and stochastic realizations encountered during execution. The computational experiments on a project scheduling problem library (PSPLIB) and a real-world case study show that the proposed method outperforms all traditional PR-based methods for the SRCPSP under five different distributions, validating its effectiveness, practicality and generalizability.
- 1 September 2026
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 152 (9)
A Generalizable Deep Reinforcement Learning–Based Algorithm for Priority Rule Scheduling in Stochastic Resource-Constrained Project Scheduling
In practical construction project scheduling, deterministic project information is available at the planning stage, and uncertainty arises during project execution. For the stochastic resource-constrained project scheduling problem (SRCPSP), existing approaches typically infer probability distributions from historical data or expert judgment during planning. However, accurately estimating such distributions is often difficult in practice. Accordingly, this study proposes a deep reinforcement learning (DRL)–based framework for online solution of the SRCPSP. The scheduling process is formulated as a Markov decision problem, and a multi-instance trained DRL agent is developed to dynamically select priority rules (PRs) during execution, based on deterministic information available at the planning stage and stochastic realizations encountered during execution. The computational experiments on a project scheduling problem library (PSPLIB) and a real-world case study show that the proposed method outperforms all traditional PR-based methods for the SRCPSP under five different distributions, validating its effectiveness, practicality and generalizability.
- Open Access
- 23 February 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 12, 29204-29221
A Two-Layer Approach for the Decentralized Multi-Project Scheduling Problem Sharing Multi-Skilled Staff
With the rapid development of economic globalization and information technology, the projects undertaken by enterprises are gradually becoming larger and more complex. The multi-project management model has become the norm in enterprise management, and it shows a trend of decentralization in terms of geographical distribution and management environment. This decentralization mainly manifests in the fact that each project has its own private information and benefit objectives and shares limited global resources with other projects during the execution process, forming a decentralized decision-making environment. As an extension of the resource-constrained project scheduling problem (RCPSP), the decentralized resource-constrained multi-project scheduling problem (DRCMPSP) is a project scheduling problem that integrates single project scheduling and global resource coordination allocation in a decentralized decision-making environment with multiple independent decision-makers. Furthermore, when considering global resources as multi-skilled staff, the decentralized resource-constrained multi-project scheduling problem sharing multi-skilled staff (DRCMPSP-MS) studied in this paper is proposed. A two-layer model containing local scheduling and global coordination decision-making is established to describe this problem. To solve this problem, a two-layer approach (TLA) is proposed. In the local scheduling layer, a bat algorithm based on forward-backward scheduling (BAFBS) is developed to generate local baseline schedules to minimize the single-project completion time. In the global coordination decision-making layer, a variable neighborhood tabu search algorithm with greedy assignment strategy (VNTS-GAS) is designed to resolve global resource conflicts to minimize the multi-project total tardiness cost. Computational experiments are conducted based on the Multi-Project Scheduling Problem LIBrary (MPSPLIB) dataset. The results show that the BAFBS can obtain high-quality local baseline schedules. Compared to the existing decentralized and centralized methods, our proposed TLA can obtain better solutions on most problem subsets, which proves that our approach can effectively coordinate the allocation of multi-skilled staff among multiple projects.
- 23 February 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 12, 29204-29221
Open AccessA Two-Layer Approach for the Decentralized Multi-Project Scheduling Problem Sharing Multi-Skilled Staff
With the rapid development of economic globalization and information technology, the projects undertaken by enterprises are gradually becoming larger and more complex. The multi-project management model has become the norm in enterprise management, and it shows a trend of decentralization in terms of geographical distribution and management environment. This decentralization mainly manifests in the fact that each project has its own private information and benefit objectives and shares limited global resources with other projects during the execution process, forming a decentralized decision-making environment. As an extension of the resource-constrained project scheduling problem (RCPSP), the decentralized resource-constrained multi-project scheduling problem (DRCMPSP) is a project scheduling problem that integrates single project scheduling and global resource coordination allocation in a decentralized decision-making environment with multiple independent decision-makers. Furthermore, when considering global resources as multi-skilled staff, the decentralized resource-constrained multi-project scheduling problem sharing multi-skilled staff (DRCMPSP-MS) studied in this paper is proposed. A two-layer model containing local scheduling and global coordination decision-making is established to describe this problem. To solve this problem, a two-layer approach (TLA) is proposed. In the local scheduling layer, a bat algorithm based on forward-backward scheduling (BAFBS) is developed to generate local baseline schedules to minimize the single-project completion time. In the global coordination decision-making layer, a variable neighborhood tabu search algorithm with greedy assignment strategy (VNTS-GAS) is designed to resolve global resource conflicts to minimize the multi-project total tardiness cost. Computational experiments are conducted based on the Multi-Project Scheduling Problem LIBrary (MPSPLIB) dataset. The results show that the BAFBS can obtain high-quality local baseline schedules. Compared to the existing decentralized and centralized methods, our proposed TLA can obtain better solutions on most problem subsets, which proves that our approach can effectively coordinate the allocation of multi-skilled staff among multiple projects.
- 6 November 2023
- Published by Wiley in International Transactions in Operational Research
- Vol. 31 (3) , 1631-1670
A two‐layer approach for solving robust decentralized multiproject scheduling problem with multi‐skilled staff
Uncertain activity durations and multi‐skilled staff allocation are two practical factors that are difficult to cope with in real project management. This paper studies a new decentralized resource‐constrained multiproject scheduling problem with uncertain activity durations and multi‐skilled staff allocation. The robust project scheduling is employed to tackle uncertainty. We name it the robust decentralized resource‐constrained multiproject scheduling problem with multi‐skilled staff (RDMPSP‐MS). To formulate this problem, a two‐layer model containing local scheduling and global coordination decision‐making is established based on the multiagent system. To solve this model, a two‐layer approach (TLA) is developed. In the TLA, a starting time criticality heuristic method is adopted to handle the local scheduling problem, and a global resource allocation heuristic algorithm is designed to allocate multi‐skilled staff. The computational experiments are conducted on the adapted Multi‐Project Scheduling Problem LIBrary (MPSPLIB) data set. The results show that the proposed TLA outperforms seven heuristic algorithms based on priority rules regarding solution quality and efficiency on most problem subsets. It is further verified that the robustness of the baseline schedule deteriorates with the increase in problem size and activity duration variability level. Additionally, the results of this research provide practical guidance for managers who expect to determine reasonable project deadlines in a decentralized multiproject environment.
- 6 November 2023
- Published by Wiley in International Transactions in Operational Research
- Vol. 31 (3) , 1631-1670
A two‐layer approach for solving robust decentralized multiproject scheduling problem with multi‐skilled staff
Uncertain activity durations and multi‐skilled staff allocation are two practical factors that are difficult to cope with in real project management. This paper studies a new decentralized resource‐constrained multiproject scheduling problem with uncertain activity durations and multi‐skilled staff allocation. The robust project scheduling is employed to tackle uncertainty. We name it the robust decentralized resource‐constrained multiproject scheduling problem with multi‐skilled staff (RDMPSP‐MS). To formulate this problem, a two‐layer model containing local scheduling and global coordination decision‐making is established based on the multiagent system. To solve this model, a two‐layer approach (TLA) is developed. In the TLA, a starting time criticality heuristic method is adopted to handle the local scheduling problem, and a global resource allocation heuristic algorithm is designed to allocate multi‐skilled staff. The computational experiments are conducted on the adapted Multi‐Project Scheduling Problem LIBrary (MPSPLIB) data set. The results show that the proposed TLA outperforms seven heuristic algorithms based on priority rules regarding solution quality and efficiency on most problem subsets. It is further verified that the robustness of the baseline schedule deteriorates with the increase in problem size and activity duration variability level. Additionally, the results of this research provide practical guidance for managers who expect to determine reasonable project deadlines in a decentralized multiproject environment.
- Open Access
- 23 March 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 11, 29554-29565
A Two-Stage Algorithm Based on 12 Priority Rules for the Stochastic Distributed Resource-Constrained Multi-Project Scheduling Problem With Multi-Skilled Staff
In practical multi-skilled resource-constrained multi-project management, the activity duration is often affected by some factors (e.g., rework, increased workload), leading to uncertainty. Moreover, multiple projects are often managed under a distributed decision-making environment. To deal with uncertain activity durations in distributed multi-project management with multi-skilled staff, this paper studies a stochastic distributed resource-constrained multi-project scheduling problem with multi-skilled staff (MS-SDRCMPSP). In a distributed decision-making environment, a two-stage model with local scheduling and global coordination stages is established to describe MS-SDRCMPSP. A two-stage algorithm with 12 priority rules (TSA-12PRs) is proposed, these 12 priority rules are composed of 4 activity priority rules and 3 resource priority rules. In the local schedule stage, 4 activity priority rules (PRs) are applied to obtain the local schedule plan. In the global coordination phase, we develop 3 resource PRs based on variable neighborhood search (VNS), of which VNS is used to solve the execution order of conflicting projects, and 3 resource PRs are developed to formulate multi-skilled resource assignment strategies. Based on the multi-skilled instances adapted from benchmark instances, we evaluate the performance of the 12 PRs on different instances. The experiment results show that two PRs among 12 PRs perform better than other PRs in all-size instances. Comparing the two-stage algorithm with better two PRs with other approaches in literatures, we find that our method performs better than other approaches, especially in large-size instances. In addition, further experiments show that our method is more conducive to shortening the CPU runtime on distributed problems than centralized methods.
- 23 March 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 11, 29554-29565
Open AccessA Two-Stage Algorithm Based on 12 Priority Rules for the Stochastic Distributed Resource-Constrained Multi-Project Scheduling Problem With Multi-Skilled Staff
In practical multi-skilled resource-constrained multi-project management, the activity duration is often affected by some factors (e.g., rework, increased workload), leading to uncertainty. Moreover, multiple projects are often managed under a distributed decision-making environment. To deal with uncertain activity durations in distributed multi-project management with multi-skilled staff, this paper studies a stochastic distributed resource-constrained multi-project scheduling problem with multi-skilled staff (MS-SDRCMPSP). In a distributed decision-making environment, a two-stage model with local scheduling and global coordination stages is established to describe MS-SDRCMPSP. A two-stage algorithm with 12 priority rules (TSA-12PRs) is proposed, these 12 priority rules are composed of 4 activity priority rules and 3 resource priority rules. In the local schedule stage, 4 activity priority rules (PRs) are applied to obtain the local schedule plan. In the global coordination phase, we develop 3 resource PRs based on variable neighborhood search (VNS), of which VNS is used to solve the execution order of conflicting projects, and 3 resource PRs are developed to formulate multi-skilled resource assignment strategies. Based on the multi-skilled instances adapted from benchmark instances, we evaluate the performance of the 12 PRs on different instances. The experiment results show that two PRs among 12 PRs perform better than other PRs in all-size instances. Comparing the two-stage algorithm with better two PRs with other approaches in literatures, we find that our method performs better than other approaches, especially in large-size instances. In addition, further experiments show that our method is more conducive to shortening the CPU runtime on distributed problems than centralized methods.
- 8 April 2022
- Published by Springer Nature in Applied Intelligence
- Vol. 52 (15) , 18081-18100
A sealed bid auction-based two-stage approach for a decentralized multiproject scheduling problem with resource transfers
- 8 April 2022
- Published by Springer Nature in Applied Intelligence
- Vol. 52 (15) , 18081-18100
A sealed bid auction-based two-stage approach for a decentralized multiproject scheduling problem with resource transfers
- Open Access
- 18 December 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 8, 227780-227792
A Multi-PR Heuristic for Distributed Multi-Project Scheduling With Uncertain Duration
Multiple projects are often managed and run in a decentralized setting. In this paper, considering the uncertainty in project implementation, we study the distributed multi-project scheduling problem with uncertain duration. A multi-PR heuristic (MPR-H) is then proposed to dynamically coordinate the global resource conflicts while minimizing the expected total tardiness cost. Three priority rules based on current known information are also proposed and incorporated in our approach. We further consider the opportunistic behaviour of self-interested agents and design a payment negotiation process which is added to the MPR-H. In this paper, we then evaluate the performance of the MPR-H on the benchmark dataset MPSPLIB. The computational results confirm that MPR-H achieves significant improvements in comparison with several state-of-the-art distributed/centralized algorithms. The proposed algorithm also provides the senior manager with an efficient method to allocate global resources for large-size and strong conflicting instances under various activity duration distributions. Besides, we show that multi-projects with relative slack global resource constraints are more affected by the change of uncertainty. By analyzing the strategic behaviour of the agents in problems with two projects, we also show that in our MPR-H with payment negotiation approach, rational agents have to behave truthfully that is the dominant-strategy equilibrium leading to high-quality results.
- 18 December 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 8, 227780-227792
Open AccessA Multi-PR Heuristic for Distributed Multi-Project Scheduling With Uncertain Duration
Multiple projects are often managed and run in a decentralized setting. In this paper, considering the uncertainty in project implementation, we study the distributed multi-project scheduling problem with uncertain duration. A multi-PR heuristic (MPR-H) is then proposed to dynamically coordinate the global resource conflicts while minimizing the expected total tardiness cost. Three priority rules based on current known information are also proposed and incorporated in our approach. We further consider the opportunistic behaviour of self-interested agents and design a payment negotiation process which is added to the MPR-H. In this paper, we then evaluate the performance of the MPR-H on the benchmark dataset MPSPLIB. The computational results confirm that MPR-H achieves significant improvements in comparison with several state-of-the-art distributed/centralized algorithms. The proposed algorithm also provides the senior manager with an efficient method to allocate global resources for large-size and strong conflicting instances under various activity duration distributions. Besides, we show that multi-projects with relative slack global resource constraints are more affected by the change of uncertainty. By analyzing the strategic behaviour of the agents in problems with two projects, we also show that in our MPR-H with payment negotiation approach, rational agents have to behave truthfully that is the dominant-strategy equilibrium leading to high-quality results.
- Open Access
- 9 October 2018
- Published by Public Library of Science (PLoS) in PLOS ONE
- Vol. 13 (10) , e0205445
A multi-agent system for distributed multi-project scheduling with two-stage decomposition
A two-stage decomposition approach based on a novel multi-agent system (MAS) is proposed for the distributed resource constrained multi-project scheduling problem (DRCMPSP). In stage one, from the point of view of each local project manager, a forward-backward hybrid genetic algorithm (FBHGA) is developed to generate an initial local schedule with the objective of minimizing individual project makespan. In stage two, from the global perspective of project management office, a sequential game-based negotiation mechanism is employed to eliminate global resource conflicts with the objective of minimizing total tardiness cost (TTC). The proposed approach is tested on 140 benchmark problem instances. According to the computational results, high-quality local project schedules can be obtained by FBHGA in stage one. Furthermore, it is observed that our method is capable of dealing with various complex multi-project instances under different degrees of resource conflicts in reasonable CPU running time. Compared to the existing decentralized methods for DRCMPSP, the proposed approach with sequential game-based negotiation mechanism shows the superiority in producing multi-project schedules with lower TTC, especially for large-size and strong conflicting instances.
- 9 October 2018
- Published by Public Library of Science (PLoS) in PLOS ONE
- Vol. 13 (10) , e0205445
Open AccessA multi-agent system for distributed multi-project scheduling with two-stage decomposition
A two-stage decomposition approach based on a novel multi-agent system (MAS) is proposed for the distributed resource constrained multi-project scheduling problem (DRCMPSP). In stage one, from the point of view of each local project manager, a forward-backward hybrid genetic algorithm (FBHGA) is developed to generate an initial local schedule with the objective of minimizing individual project makespan. In stage two, from the global perspective of project management office, a sequential game-based negotiation mechanism is employed to eliminate global resource conflicts with the objective of minimizing total tardiness cost (TTC). The proposed approach is tested on 140 benchmark problem instances. According to the computational results, high-quality local project schedules can be obtained by FBHGA in stage one. Furthermore, it is observed that our method is capable of dealing with various complex multi-project instances under different degrees of resource conflicts in reasonable CPU running time. Compared to the existing decentralized methods for DRCMPSP, the proposed approach with sequential game-based negotiation mechanism shows the superiority in producing multi-project schedules with lower TTC, especially for large-size and strong conflicting instances.
- 30 March 2018
- Published by Springer Nature in Arabian Journal for Science and Engineering
- Vol. 44 (3) , 2503-2517
Experimental Evaluation of Overlapping Strategy for the Multimode Resource-Constrained Project Scheduling Problem
- 30 March 2018
- Published by Springer Nature in Arabian Journal for Science and Engineering
- Vol. 44 (3) , 2503-2517
Experimental Evaluation of Overlapping Strategy for the Multimode Resource-Constrained Project Scheduling Problem