Claus Davidsen
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Claus Davidsen has a total of 8 co-authors. Here are the top co-authors by number of shared publications:
- Peter Bauer-Gottwein
University of Copenhagen, Department of Geosciences and Natural Resource Management, Rolighedsvej 23, 1958 Frederiksberg C, Denmark
5 shared publications - Dan Rosbjerg
Technical University of Denmark
3 shared publications - Suxia Liu
Key Laboratory of Water Cycle and Related Land Surface Processes, Institute of Geographic Sciences and Natural Resources Research, Chinese Academy of Sciences, Beijing 100101, China
3 shared publications X. Mo
2 shared publications- Federica Bertoni
Politecnico di Milano
1 shared publication - Raphaël Payet-Burin
Department of Environmental Engineering, Technical University of Denmark, Kgs. Lyngby, 2800, Denmark
1 shared publication
Latest Publications
- Open Access
Optimization of regional water - power systems under cooling constraints and climate change
- Open Access
Multi-Objective Optimization for Analysis of Changing Trade-Offs in the Nepalese Water–Energy–Food Nexus with Hydropower Development
While the water–energy–food nexus approach is becoming increasingly important for more efficient resource utilization and economic development, limited quantitative tools are available to incorporate the approach in decision-making. We propose a spatially explicit framework that couples two well-established water and power system models to develop a decision support tool combining multiple nexus objectives in a linear objective function. To demonstrate our framework, we compare eight Nepalese power development scenarios based on five nexus objectives: minimization of power deficit, maintenance of water availability for irrigation to support food self-sufficiency, reduction in flood risk, maintenance of environmental flows, and maximization of power export. The deterministic multi-objective optimization model is spatially resolved to enable realistic representation of the nexus linkages and accounts for power transmission constraints using an optimal power flow approach. Basin inflows, hydropower plant specifications, reservoir characteristics, reservoir rules, irrigation water demand, environmental flow requirements, power demand, and transmission line properties are provided as model inputs. The trade-offs and synergies among these objectives were visualized for each scenario under multiple environmental flow and power demand requirements. Spatially disaggregated model outputs allowed for the comparison of scenarios not only based on fulfillment of nexus objectives but also scenario compatibility with existing infrastructure, supporting the identification of projects that enhance overall system efficiency. Though the model is applied to the Nepalese nexus from a power development perspective here, it can be extended and adapted for other problems.
Open AccessMulti-Objective Optimization for Analysis of Changing Trade-Offs in the Nepalese Water–Energy–Food Nexus with Hydropower Development
While the water–energy–food nexus approach is becoming increasingly important for more efficient resource utilization and economic development, limited quantitative tools are available to incorporate the approach in decision-making. We propose a spatially explicit framework that couples two well-established water and power system models to develop a decision support tool combining multiple nexus objectives in a linear objective function. To demonstrate our framework, we compare eight Nepalese power development scenarios based on five nexus objectives: minimization of power deficit, maintenance of water availability for irrigation to support food self-sufficiency, reduction in flood risk, maintenance of environmental flows, and maximization of power export. The deterministic multi-objective optimization model is spatially resolved to enable realistic representation of the nexus linkages and accounts for power transmission constraints using an optimal power flow approach. Basin inflows, hydropower plant specifications, reservoir characteristics, reservoir rules, irrigation water demand, environmental flow requirements, power demand, and transmission line properties are provided as model inputs. The trade-offs and synergies among these objectives were visualized for each scenario under multiple environmental flow and power demand requirements. Spatially disaggregated model outputs allowed for the comparison of scenarios not only based on fulfillment of nexus objectives but also scenario compatibility with existing infrastructure, supporting the identification of projects that enhance overall system efficiency. Though the model is applied to the Nepalese nexus from a power development perspective here, it can be extended and adapted for other problems.
- Open Access
- 19 February 2016
- Published by Copernicus GmbH in Hydrology and Earth System Sciences
- Vol. 20 (2) , 771-785
The cost of ending groundwater overdraft on the North China Plain
Overexploitation of groundwater reserves is a major environmental problem around the world. In many river basins, groundwater and surface water are used conjunctively and joint optimization strategies are required. A hydroeconomic modeling approach is used to find cost-optimal sustainable surface water and groundwater allocation strategies for a river basin, given an arbitrary initial groundwater level in the aquifer. A simplified management problem with conjunctive use of scarce surface water and groundwater under inflow and recharge uncertainty is presented. Because of head-dependent groundwater pumping costs the optimization problem is nonlinear and non-convex, and a genetic algorithm is used to solve the one-step-ahead subproblems with the objective of minimizing the sum of immediate and expected future costs. A real-world application in the water-scarce Ziya River basin in northern China is used to demonstrate the model capabilities. Persistent overdraft from the groundwater aquifers on the North China Plain has caused declining groundwater levels. The model maps the marginal cost of water in different scenarios, and the minimum cost of ending groundwater overdraft in the basin is estimated to be CNY 5.58 billion yr−1. The study shows that it is cost-effective to slowly recover the groundwater aquifer to a level close to the surface, while gradually lowering the groundwater value to the equilibrium at CNY 2.15 m−3. The model can be used to guide decision-makers to economic efficient long-term sustainable management of groundwater and surface water resources.
- 19 February 2016
- Published by Copernicus GmbH in Hydrology and Earth System Sciences
- Vol. 20 (2) , 771-785
Open AccessThe cost of ending groundwater overdraft on the North China Plain
Overexploitation of groundwater reserves is a major environmental problem around the world. In many river basins, groundwater and surface water are used conjunctively and joint optimization strategies are required. A hydroeconomic modeling approach is used to find cost-optimal sustainable surface water and groundwater allocation strategies for a river basin, given an arbitrary initial groundwater level in the aquifer. A simplified management problem with conjunctive use of scarce surface water and groundwater under inflow and recharge uncertainty is presented. Because of head-dependent groundwater pumping costs the optimization problem is nonlinear and non-convex, and a genetic algorithm is used to solve the one-step-ahead subproblems with the objective of minimizing the sum of immediate and expected future costs. A real-world application in the water-scarce Ziya River basin in northern China is used to demonstrate the model capabilities. Persistent overdraft from the groundwater aquifers on the North China Plain has caused declining groundwater levels. The model maps the marginal cost of water in different scenarios, and the minimum cost of ending groundwater overdraft in the basin is estimated to be CNY 5.58 billion yr−1. The study shows that it is cost-effective to slowly recover the groundwater aquifer to a level close to the surface, while gradually lowering the groundwater value to the equilibrium at CNY 2.15 m−3. The model can be used to guide decision-makers to economic efficient long-term sustainable management of groundwater and surface water resources.
- Open Access
- 22 June 2015
- Published by Copernicus GmbH in EGUsphere
The cost of ending groundwater overdraft on the North China Plain
Over-exploitation of groundwater reserves is a major environmental problem around the world. In many river basins, groundwater and surface water are used conjunctively and joint optimization strategies are required. A hydroeconomic modelling approach is used to find cost-optimal sustainable surface water and groundwater allocation strategies for a river basin, given an arbitrary initial groundwater level in the aquifer. A simplified management problem with conjunctive use of scarce surface water and groundwater under inflow and recharge uncertainty is presented. Because of head-dependent groundwater pumping costs the optimization problem is non-linear and non-convex, and a genetic algorithm is used to solve the 1-step-ahead sub-problems with the objective of minimizing the sum of immediate and expected future costs. A real-world application in the Ziya River Basin in northern China is used to demonstrate the model capabilities. Persistent overdraft from the groundwater aquifers on the North China Plain has caused declining groundwater tables, salinization and infiltration of \\hack{\\break} wastewater. The model maps the opportunity cost of water in different scenarios, and the cost of ending groundwater overdraft in the basin is estimated to be 5.47 billion CNY yr−1. The model can be used to guide decision makers to ensure long-term sustainability of groundwater and surface water resources management in the basin in an economically optimal way.
- 22 June 2015
- Published by Copernicus GmbH in EGUsphere
Open AccessThe cost of ending groundwater overdraft on the North China Plain
Over-exploitation of groundwater reserves is a major environmental problem around the world. In many river basins, groundwater and surface water are used conjunctively and joint optimization strategies are required. A hydroeconomic modelling approach is used to find cost-optimal sustainable surface water and groundwater allocation strategies for a river basin, given an arbitrary initial groundwater level in the aquifer. A simplified management problem with conjunctive use of scarce surface water and groundwater under inflow and recharge uncertainty is presented. Because of head-dependent groundwater pumping costs the optimization problem is non-linear and non-convex, and a genetic algorithm is used to solve the 1-step-ahead sub-problems with the objective of minimizing the sum of immediate and expected future costs. A real-world application in the Ziya River Basin in northern China is used to demonstrate the model capabilities. Persistent overdraft from the groundwater aquifers on the North China Plain has caused declining groundwater tables, salinization and infiltration of \\hack{\\break} wastewater. The model maps the opportunity cost of water in different scenarios, and the cost of ending groundwater overdraft in the basin is estimated to be 5.47 billion CNY yr−1. The model can be used to guide decision makers to ensure long-term sustainability of groundwater and surface water resources management in the basin in an economically optimal way.
- Open Access
- 22 June 2015
- Published by Copernicus GmbH
Supplementary material to "The cost of ending groundwater overdraft on the North China Plain"
- 22 June 2015
- Published by Copernicus GmbH
Open AccessSupplementary material to "The cost of ending groundwater overdraft on the North China Plain"