Federica Bertoni
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Federica Bertoni has a total of 11 co-authors. Here are the top co-authors by number of shared publications:
- Matteo Giuliani
Politecnico di Milano
3 shared publications - Andrea Castelletti
Politecnico di Milano
2 shared publications A. Castelletti
Department of Electronics, Information, and Bioengineering Politecnico di Milano Milan Italy
1 shared publicationAndrea Castelletti
Associate Professor, Dept. of Electronics, Information, and Bioengineering, Politecnico di Milano, P.za Leonardo da Vinci, 32, 20133 Milano, Italy
1 shared publication- Claus Davidsen
Department of Environmental Engineering, Technical University of Denmark, 2800, Kgs. Lyngby, Denmark
1 shared publication - Jazmin Zatarain Salazar1 shared publication
Latest Publications
- Open Access
- 27 February 2021
- Published by Springer Nature
- p. 119-128
Advancing Joint Design and Operation of Water Resources Systems Under Uncertainty
Globally, many countries are actively seeking to maximize the hydropower potential of major river basins, yielding proposals for constructing approximately 3,700 major dams in the near future. The planning of new water reservoir systems raises several major challenges that must be conjunctively accounted for within the system design phase, in order to design efficient yet sustainable infrastructures able to satisfy multiple water needs and perform well under a wide range of external future changes. This contribution aims at advancing the current planning and operation of water reservoir systems, focusing on the coupling of dam sizing and operation design in order to thoroughly capture their interdependencies also with respect to uncertainty in the main external drivers.
- 27 February 2021
- Published by Springer Nature
- p. 119-128
Open AccessAdvancing Joint Design and Operation of Water Resources Systems Under Uncertainty
Globally, many countries are actively seeking to maximize the hydropower potential of major river basins, yielding proposals for constructing approximately 3,700 major dams in the near future. The planning of new water reservoir systems raises several major challenges that must be conjunctively accounted for within the system design phase, in order to design efficient yet sustainable infrastructures able to satisfy multiple water needs and perform well under a wide range of external future changes. This contribution aims at advancing the current planning and operation of water reservoir systems, focusing on the coupling of dam sizing and operation design in order to thoroughly capture their interdependencies also with respect to uncertainty in the main external drivers.
- 1 April 2020
- Published by American Society of Civil Engineers (ASCE) in Journal of Water Resources Planning and Management
- Vol. 146 (4)
Integrated Design of Dam Size and Operations via Reinforcement Learning
In the water systems analysis literature and practice, planning (i.e., dam sizing) and management (i.e., operation design) have been for long time addressed as two weakly interconnected problems, and this often resulted in oversized, poorly performing infrastructures. Recently, several authors started exploring the interdependent nature of these two problems, introducing new integrated approaches to simultaneously design water infrastructures and their operations. Yet, the high computational burden is a likely downside of these methods, a large share of which require solving one optimal operation design problem for every candidate dam size, making it unfeasible to explore the entire planning and associated operation decision space. This paper contributes a novel reinforcement learning (RL)-based approach to integrate dam sizing and operation design while significantly containing computational costs with respect to alternative state-of-the-art methods. The approach first optimizes a single operating policy parametric in the dam size and then searches for the best reservoir size operated using this policy. The parametric policy is computed through a novel batch-mode RL algorithm, called Planning Fitted Q-Iteration (pFQI). The proposed RL approach is tested on a numerical case study, where the water infrastructure must be sized and operated to meet downstream users’ water demand while minimizing construction costs. Results show that the proposed RL approach is able to identify more efficient system configurations with respect to traditional sizing approaches that neglect the optimal operation design phase. Furthermore, when compared with other integrated approaches, the pFQI algorithm is proven to be computationally more efficient.
- 1 April 2020
- Published by American Society of Civil Engineers (ASCE) in Journal of Water Resources Planning and Management
- Vol. 146 (4)
Integrated Design of Dam Size and Operations via Reinforcement Learning
In the water systems analysis literature and practice, planning (i.e., dam sizing) and management (i.e., operation design) have been for long time addressed as two weakly interconnected problems, and this often resulted in oversized, poorly performing infrastructures. Recently, several authors started exploring the interdependent nature of these two problems, introducing new integrated approaches to simultaneously design water infrastructures and their operations. Yet, the high computational burden is a likely downside of these methods, a large share of which require solving one optimal operation design problem for every candidate dam size, making it unfeasible to explore the entire planning and associated operation decision space. This paper contributes a novel reinforcement learning (RL)-based approach to integrate dam sizing and operation design while significantly containing computational costs with respect to alternative state-of-the-art methods. The approach first optimizes a single operating policy parametric in the dam size and then searches for the best reservoir size operated using this policy. The parametric policy is computed through a novel batch-mode RL algorithm, called Planning Fitted Q-Iteration (pFQI). The proposed RL approach is tested on a numerical case study, where the water infrastructure must be sized and operated to meet downstream users’ water demand while minimizing construction costs. Results show that the proposed RL approach is able to identify more efficient system configurations with respect to traditional sizing approaches that neglect the optimal operation design phase. Furthermore, when compared with other integrated approaches, the pFQI algorithm is proven to be computationally more efficient.
- Open Access
- 23 March 2020
- Published by Copernicus GmbH
Robust Infrastructure Sequencing and Management for Growing Food Energy and Water Demands in the Zambezi River Basin
Fast population growth and economic development in several African countries is driving large infrastructure investments for growing energy, food and water demands which will likely strain existing ecosystem services. To minimize negative impacts and guarantee long-term success and sustainability of these investments, careful management and temporal planning of existing and new infrastructure is required. Our study focuses on the Zambezi River Basin (ZRB), a transboundary system supporting key economic growth and poverty reduction across its multiple riparian countries, while sustaining essential ecosystem services. The ZRB currently encompasses five hydropower dams, with three additional dams planned. The goal of this study is to generate efficient pathways that allow the temporal sequencing of planned dam projects along with robust management strategies that balance food, energy and environmental demands. A participatory approach is adopted at an early stage by running a Negotiation Simulation Lab (NSL) to elicit stakeholders’ preferences and concerns supporting both model development and formulation of the optimization problem. Specifically, the pathway design is structured in three stages: first, optimal control policies are generated using Evolutionary Multi-objective Direct Policy Search for all possible combinations of dams projects; the time of construction is subsequently optimized, including the update of the system operation when a new dam is built, by balancing the benefits and the costs of additional infrastructure investments which are activated by projections of population growth triggering higher water and energy demands, finally promising policies are tested under a broad set of irrigation demand and streamflow scenarios. Our analysis shows that the rising demands cause all the planned dams to be built within the planning horizon from 2020-2060. The study also indicates that the operational preferences are key since they dictate the system’s performance across multiple objectives and this behavior prevails under a larger suite of plausible future scenarios. Overall, our study provides a novel approach that integrates infrastructure investment planning that can be coupled with cooperative operations to meet growing regional demands while involving stakeholders in crucial stages of the decision making process.
- 23 March 2020
- Published by Copernicus GmbH
Open AccessRobust Infrastructure Sequencing and Management for Growing Food Energy and Water Demands in the Zambezi River Basin
Fast population growth and economic development in several African countries is driving large infrastructure investments for growing energy, food and water demands which will likely strain existing ecosystem services. To minimize negative impacts and guarantee long-term success and sustainability of these investments, careful management and temporal planning of existing and new infrastructure is required. Our study focuses on the Zambezi River Basin (ZRB), a transboundary system supporting key economic growth and poverty reduction across its multiple riparian countries, while sustaining essential ecosystem services. The ZRB currently encompasses five hydropower dams, with three additional dams planned. The goal of this study is to generate efficient pathways that allow the temporal sequencing of planned dam projects along with robust management strategies that balance food, energy and environmental demands. A participatory approach is adopted at an early stage by running a Negotiation Simulation Lab (NSL) to elicit stakeholders’ preferences and concerns supporting both model development and formulation of the optimization problem. Specifically, the pathway design is structured in three stages: first, optimal control policies are generated using Evolutionary Multi-objective Direct Policy Search for all possible combinations of dams projects; the time of construction is subsequently optimized, including the update of the system operation when a new dam is built, by balancing the benefits and the costs of additional infrastructure investments which are activated by projections of population growth triggering higher water and energy demands, finally promising policies are tested under a broad set of irrigation demand and streamflow scenarios. Our analysis shows that the rising demands cause all the planned dams to be built within the planning horizon from 2020-2060. The study also indicates that the operational preferences are key since they dictate the system’s performance across multiple objectives and this behavior prevails under a larger suite of plausible future scenarios. Overall, our study provides a novel approach that integrates infrastructure investment planning that can be coupled with cooperative operations to meet growing regional demands while involving stakeholders in crucial stages of the decision making process.
- Open Access
- 23 March 2020
- Published by Copernicus GmbH
Informed water infrastructure design: improving coupled dam sizing and operation by streamflow forecasts
There is a large body of recent research that is capitalizing on the improved skill of state-of-the-art hydroclimatic services for investigating their value in informing water reservoir operations. Yet, the potential value of these services in informing infrastructure design is still unexplored. In this work, we investigate the added value of hydroclimatic services in the planning of water reservoirs, composed of the joint design of the infrastructure’s size and its operations informed by streamflow forecasts. We demonstrate the potential of our approach through an ex-post design analysis of the Kariba dam in the Zambezi river basin, which is the largest man-made reservoir in Africa. The reservoir is operated for hydropower production and irrigation supply. Specifically, we search for flexible operating policies informed by streamflow forecasts that allow the design of smaller and less costly reservoirs with respect to solutions that do not rely on forecast information. This requires selecting the most informative forecast lead times to use in the dam design phase, which depends on both infrastructural reservoir characteristics and tradeoffs across performance objectives. After estimating the value of perfect forecasts, we analyze its sensitivity with respect to using imperfect synthetic forecasts characterized by different biases. The results show that informing the infrastructure design with perfect streamflow forecasts allows reducing capital costs by 20% with respect to a baseline solution not informed by any forecast, while maintaining the same performance in terms of hydropower production and water supply. Forecast overestimation results in the most critical synthetic forecast bias, reducing their value by 8%. Moreover, our analysis show that forecast value is highly sensitive to reservoir size and operational tradeoffs, ultimately representing a valuable tool for supporting the ongoing planning of 3,700 major dams worldwide.
- 23 March 2020
- Published by Copernicus GmbH
Open AccessInformed water infrastructure design: improving coupled dam sizing and operation by streamflow forecasts
There is a large body of recent research that is capitalizing on the improved skill of state-of-the-art hydroclimatic services for investigating their value in informing water reservoir operations. Yet, the potential value of these services in informing infrastructure design is still unexplored. In this work, we investigate the added value of hydroclimatic services in the planning of water reservoirs, composed of the joint design of the infrastructure’s size and its operations informed by streamflow forecasts. We demonstrate the potential of our approach through an ex-post design analysis of the Kariba dam in the Zambezi river basin, which is the largest man-made reservoir in Africa. The reservoir is operated for hydropower production and irrigation supply. Specifically, we search for flexible operating policies informed by streamflow forecasts that allow the design of smaller and less costly reservoirs with respect to solutions that do not rely on forecast information. This requires selecting the most informative forecast lead times to use in the dam design phase, which depends on both infrastructural reservoir characteristics and tradeoffs across performance objectives. After estimating the value of perfect forecasts, we analyze its sensitivity with respect to using imperfect synthetic forecasts characterized by different biases. The results show that informing the infrastructure design with perfect streamflow forecasts allows reducing capital costs by 20% with respect to a baseline solution not informed by any forecast, while maintaining the same performance in terms of hydropower production and water supply. Forecast overestimation results in the most critical synthetic forecast bias, reducing their value by 8%. Moreover, our analysis show that forecast value is highly sensitive to reservoir size and operational tradeoffs, ultimately representing a valuable tool for supporting the ongoing planning of 3,700 major dams worldwide.
- Open Access
- 21 December 2019
- Published by American Geophysical Union (AGU) in Earth's Future
- Vol. 7 (12) , 1367-1390
Discovering Dependencies, Trade‐Offs, and Robustness in Joint Dam Design and Operation: An Ex‐Post Assessment of the Kariba Dam
Globally, many countries are actively seeking to maximize the hydropower potential of major river basins, yielding proposals for constructing approximately 3,700 major dams in the near future. At present, economic cost‐benefit analyses are the dominant approach for evaluating candidate dam designs. Yet they typically fail to explore the interdependence of dam design and operation by (i) monetizing and aggregating potentially conflicting and heterogeneous objectives into a single metric and (ii) using predefined operating rules aimed at maximizing specific performance objectives for the dams to be designed. Careful consideration of alternative reservoir operating schemes can help to avoid biases in how optimal dam sizes are identified while also clarifying their capacity to adapt to changing hydroclimatic conditions and human demands. This paper presents an integrated framework to solve coupled dam sizing and operation design problems. The framework combines Multiobjective Robust Decision Making and Evolutionary Multiobjective Direct Policy Search into a novel approach to dam sizing, which internalizes the operation design problem and explicitly considers uncertainty in external drivers. We demonstrate the potential of this integrated dam design framework through an ex‐post design analysis of the Kariba dam in the Zambezi river basin. Our results show that careful exploration of the coupled planning/operation search space yields designs that significantly outperform the existing Kariba system. Moreover, we demonstrate that our framework leads to a significant reduction in capital costs (i.e., smaller reservoir sizes) while simultaneously improving system robustness with respect to changing hydroclimatology and human irrigation demands.
- 21 December 2019
- Published by American Geophysical Union (AGU) in Earth's Future
- Vol. 7 (12) , 1367-1390
Open AccessDiscovering Dependencies, Trade‐Offs, and Robustness in Joint Dam Design and Operation: An Ex‐Post Assessment of the Kariba Dam
Globally, many countries are actively seeking to maximize the hydropower potential of major river basins, yielding proposals for constructing approximately 3,700 major dams in the near future. At present, economic cost‐benefit analyses are the dominant approach for evaluating candidate dam designs. Yet they typically fail to explore the interdependence of dam design and operation by (i) monetizing and aggregating potentially conflicting and heterogeneous objectives into a single metric and (ii) using predefined operating rules aimed at maximizing specific performance objectives for the dams to be designed. Careful consideration of alternative reservoir operating schemes can help to avoid biases in how optimal dam sizes are identified while also clarifying their capacity to adapt to changing hydroclimatic conditions and human demands. This paper presents an integrated framework to solve coupled dam sizing and operation design problems. The framework combines Multiobjective Robust Decision Making and Evolutionary Multiobjective Direct Policy Search into a novel approach to dam sizing, which internalizes the operation design problem and explicitly considers uncertainty in external drivers. We demonstrate the potential of this integrated dam design framework through an ex‐post design analysis of the Kariba dam in the Zambezi river basin. Our results show that careful exploration of the coupled planning/operation search space yields designs that significantly outperform the existing Kariba system. Moreover, we demonstrate that our framework leads to a significant reduction in capital costs (i.e., smaller reservoir sizes) while simultaneously improving system robustness with respect to changing hydroclimatology and human irrigation demands.
- Open Access
Optimization of regional water - power systems under cooling constraints and climate change