Enrico Fagotti
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Enrico Fagotti has a total of 284 co-authors. Here are the top co-authors by number of shared publications:
A. Pisent
10 shared publicationsM. Poggi
9 shared publications- Michele Comunian
INFN Laboratori Nazionali di Legnaro, I-35020, Legnaro (Pd), Italy
9 shared publications - Giovanni Bisoffi
INFN Laboratori Nazionali di Legnaro, viala dell'università 2, 35126 Legnaro, Italy
7 shared publications A.M. Porcellato
5 shared publicationsS. Canella
5 shared publications
Latest Publications
- Open Access
- 9 June 2026
- Published by MDPI AG in Instruments
- Vol. 10 (2) , 33
Machine Learning-Driven Beam Tuning Using Adaptive Region Bayesian Optimization at INFN-LNL
Machine Learning (ML) techniques are increasingly being adopted in particle accelerator operations to enable efficient control of complex systems. At INFN–LNL, we investigated both offline and real-time ML-driven approaches to enhance beam quality, reduce setup time, and improve reliability across different accelerator facilities. As part of this effort, we developed Adaptive Region Bayesian Optimization (ARBO), a custom Bayesian Optimization algorithm that dynamically expands its search domain when the predicted optimum approaches a boundary. Offline studies applied ARBO to the design optimization of the medium-energy beam transport line of the ANTHEM BNCT facility. Real-time online tests demonstrated the effectiveness of ARBO. At PIAVE–ALPI, the combined transmission improved from 44.2% to 52.6%, corresponding to an ALPI-only increase from approximately 69% to 82%, approaching the theoretical maximum of 93%. At the ESS normal-conducting linac, ARBO enabled the simultaneous tuning of more than 50 control elements while improving transmission and maintaining stable trajectory correction. These results indicate that adaptive optimization strategies can substantially improve accelerator performance and support future advances in ML-assisted accelerator operations.
- 9 June 2026
- Published by MDPI AG in Instruments
- Vol. 10 (2) , 33
Open AccessMachine Learning-Driven Beam Tuning Using Adaptive Region Bayesian Optimization at INFN-LNL
Machine Learning (ML) techniques are increasingly being adopted in particle accelerator operations to enable efficient control of complex systems. At INFN–LNL, we investigated both offline and real-time ML-driven approaches to enhance beam quality, reduce setup time, and improve reliability across different accelerator facilities. As part of this effort, we developed Adaptive Region Bayesian Optimization (ARBO), a custom Bayesian Optimization algorithm that dynamically expands its search domain when the predicted optimum approaches a boundary. Offline studies applied ARBO to the design optimization of the medium-energy beam transport line of the ANTHEM BNCT facility. Real-time online tests demonstrated the effectiveness of ARBO. At PIAVE–ALPI, the combined transmission improved from 44.2% to 52.6%, corresponding to an ALPI-only increase from approximately 69% to 82%, approaching the theoretical maximum of 93%. At the ESS normal-conducting linac, ARBO enabled the simultaneous tuning of more than 50 control elements while improving transmission and maintaining stable trajectory correction. These results indicate that adaptive optimization strategies can substantially improve accelerator performance and support future advances in ML-assisted accelerator operations.
- 2 September 2021
- Published by IOP Publishing in Nuclear Fusion
- Vol. 61 (11) , 116002
Neutron production measurement in the 125 mA 5 MeV deuteron beam commissioning of Linear IFMIF Prototype Accelerator (LIPAc) RFQ
The validation of the Linear IFMIF Prototype Accelerator (LIPAc) is being conducted in Rokkasho Fusion Institute of QST, Aomori, Japan. The beam commissioning of the novel LIPAc RFQ has been progressing significantly, and the acceleration of the world highest current deuteron beam of 125 mA to 5 MeV (1 ms, 1 Hz pulsed beam) was achieved for the 1st time in July 2019. This study is devoted to evaluating the amount of beam loss during the high current acceleration phase by measuring the neutron produced by the interaction of the beam with accelerator components so as to verify the accelerator design. The foil activation method and the 3He neutron probes were utilized. It turned out that there was no significant trace of unexpected beam loss at the high energy section of the RFQ and the Medium Energy Beam Transport (MEBT) section.The measurement using the 3He neutron probes provided an evidence that the beam loss was well controlled in the RFQ cavity as designed. This study concludes that the LIPAc RFQ as well as MEBT is working well as predicted by the design calculation, and its concept is successful.
- 2 September 2021
- Published by IOP Publishing in Nuclear Fusion
- Vol. 61 (11) , 116002
Neutron production measurement in the 125 mA 5 MeV deuteron beam commissioning of Linear IFMIF Prototype Accelerator (LIPAc) RFQ
The validation of the Linear IFMIF Prototype Accelerator (LIPAc) is being conducted in Rokkasho Fusion Institute of QST, Aomori, Japan. The beam commissioning of the novel LIPAc RFQ has been progressing significantly, and the acceleration of the world highest current deuteron beam of 125 mA to 5 MeV (1 ms, 1 Hz pulsed beam) was achieved for the 1st time in July 2019. This study is devoted to evaluating the amount of beam loss during the high current acceleration phase by measuring the neutron produced by the interaction of the beam with accelerator components so as to verify the accelerator design. The foil activation method and the 3He neutron probes were utilized. It turned out that there was no significant trace of unexpected beam loss at the high energy section of the RFQ and the Medium Energy Beam Transport (MEBT) section.The measurement using the 3He neutron probes provided an evidence that the beam loss was well controlled in the RFQ cavity as designed. This study concludes that the LIPAc RFQ as well as MEBT is working well as predicted by the design calculation, and its concept is successful.
- 17 August 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Plasma Science
- Vol. 49 (9) , 2987-2996
Functional Overview of the RF Power System for the LIPAc RFQ
Design, development, manufacturing, and test activities of the RF power system (RFPS) for Linear IFMIF Prototype Accelerator (LIPAc) were completed in Europe. Installation and commissioning activities were carried out at the International Fusion Materials Irradiation Facility-Engineering Validation and Engineering Design Activities (IFMIF/EVEDA) site in Rokkasho, Japan. Challenging IFMIF requirements led to a number of innovations during design and development. Commissioning required a major effort on calibration and fine setting and led to development of new functionalities. The RFPS was validated under full power and 125-mA deuteron beam loading conditions, in the radio frequency quadrupole (RFQ), demonstrating good performance. This article is an overview about how technical challenges impacted the prototype RFPS design and its functional evolution during commissioning, cavity conditioning, and beam operation of the RFQ.
- 17 August 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Plasma Science
- Vol. 49 (9) , 2987-2996
Functional Overview of the RF Power System for the LIPAc RFQ
Design, development, manufacturing, and test activities of the RF power system (RFPS) for Linear IFMIF Prototype Accelerator (LIPAc) were completed in Europe. Installation and commissioning activities were carried out at the International Fusion Materials Irradiation Facility-Engineering Validation and Engineering Design Activities (IFMIF/EVEDA) site in Rokkasho, Japan. Challenging IFMIF requirements led to a number of innovations during design and development. Commissioning required a major effort on calibration and fine setting and led to development of new functionalities. The RFPS was validated under full power and 125-mA deuteron beam loading conditions, in the radio frequency quadrupole (RFQ), demonstrating good performance. This article is an overview about how technical challenges impacted the prototype RFPS design and its functional evolution during commissioning, cavity conditioning, and beam operation of the RFQ.
- 25 April 2019
- Published by IOP Publishing in Nuclear Fusion
- Vol. 59 (10) , 106001
Deuteron beam commissioning of the linear IFMIF prototype accelerator ion source and low energy beam transport
During the EVEDA (Engineering Validation and Engineering Design Activities) phase of the IFMIF (International Fusion Materials Irradiation Facility) project, a 125 mA/9 MeV prototype accelerator (LIPAc) has to be built, tested an operated in Rokkasho-Mura (Japan). Involved in this project for several years, CEA/Saclay designed the injector of this accelerator which is composed by an ECR ion source, delivering a 140 mA deuteron beam at 100 keV, and a low energy beam transport (LEBT) line to match the beam for the injection into the RFQ. In this paper, the components of the LIPAc injector are described. The commissioning of the ion source and LEBT with beam started in November 2014. The different phases of the commissioning are explained and some noticeable experimental results obtained with a D+ beam at 100 keV are presented.
- 25 April 2019
- Published by IOP Publishing in Nuclear Fusion
- Vol. 59 (10) , 106001
Deuteron beam commissioning of the linear IFMIF prototype accelerator ion source and low energy beam transport
During the EVEDA (Engineering Validation and Engineering Design Activities) phase of the IFMIF (International Fusion Materials Irradiation Facility) project, a 125 mA/9 MeV prototype accelerator (LIPAc) has to be built, tested an operated in Rokkasho-Mura (Japan). Involved in this project for several years, CEA/Saclay designed the injector of this accelerator which is composed by an ECR ion source, delivering a 140 mA deuteron beam at 100 keV, and a low energy beam transport (LEBT) line to match the beam for the injection into the RFQ. In this paper, the components of the LIPAc injector are described. The commissioning of the ion source and LEBT with beam started in November 2014. The different phases of the commissioning are explained and some noticeable experimental results obtained with a D+ beam at 100 keV are presented.
- Open Access
- 1 May 2018
- Published by IOP Publishing in Journal of Physics: Conference Series
- Vol. 1021 (1) , 012010
LINUS, the Integrated LNL Neutron Source facility
LINUS is a project at the INFN Legnaro National Laboratories (LNL, Italy) to create a suite of different neutron sources (LSNS, NEPIR, SLOWNE) driven by existing accelerators. LSNS, driven by a 40 mA, 5 MeV proton RFQ, will use Li and Be targets to deliver cold, thermal, epithermal and fast neutrons. The SPES high current (0.75 mA), 70 MeV proton cyclotron will drive the NEPIR and SLOWNE facilities. NEPIR will alternatively deliver quasi mono-energetic neutrons with energy peak down to 20 MeV, and a neutron beam with a continuous energy distribution similar to that of neutrons present in the Earth atmosphere in the accessible energy range. SLOWNE is an intense neutron source for applications outside the LSNS range.
- 1 May 2018
- Published by IOP Publishing in Journal of Physics: Conference Series
- Vol. 1021 (1) , 012010
Open AccessLINUS, the Integrated LNL Neutron Source facility
LINUS is a project at the INFN Legnaro National Laboratories (LNL, Italy) to create a suite of different neutron sources (LSNS, NEPIR, SLOWNE) driven by existing accelerators. LSNS, driven by a 40 mA, 5 MeV proton RFQ, will use Li and Be targets to deliver cold, thermal, epithermal and fast neutrons. The SPES high current (0.75 mA), 70 MeV proton cyclotron will drive the NEPIR and SLOWNE facilities. NEPIR will alternatively deliver quasi mono-energetic neutrons with energy peak down to 20 MeV, and a neutron beam with a continuous energy distribution similar to that of neutrons present in the Earth atmosphere in the accessible energy range. SLOWNE is an intense neutron source for applications outside the LSNS range.
- Open Access
- 1 May 2018
- Published by Elsevier in Nuclear Materials and Energy
- Vol. 15, 143-147
Status of the RFQ linac installation and conditioning of the Linear IFMIF Prototype Accelerator
- 1 May 2018
- Published by Elsevier in Nuclear Materials and Energy
- Vol. 15, 143-147
Open AccessStatus of the RFQ linac installation and conditioning of the Linear IFMIF Prototype Accelerator
- 1 June 2016
- Published by Elsevier in Nuclear Instruments and Methods in Physics Research Section B: Beam Interactions with Materials and Atoms
- Vol. 376, 402-407
Progress in the design and construction of SPES at INFN-LNL
- 1 June 2016
- Published by Elsevier in Nuclear Instruments and Methods in Physics Research Section B: Beam Interactions with Materials and Atoms
- Vol. 376, 402-407
Progress in the design and construction of SPES at INFN-LNL
- 25 November 2015
- Published by AIP Publishing in Review of Scientific Instruments
- Vol. 87 (2) , 02B320
First experiments with the negative ion source NIO1
Neutral Beam Injectors (NBIs), which need to be strongly optimized in the perspective of DEMO reactor, request a thorough understanding of the negative ion source used and of the multi-beamlet optics. A relatively compact radio frequency (rf) ion source, named NIO1 (Negative Ion Optimization 1), with 9 beam apertures for a total H− current of 130 mA, 60 kV acceleration voltage, was installed at Consorzio RFX, including a high voltage deck and an X-ray shield, to provide a test bench for source optimizations for activities in support to the ITER NBI test facility. NIO1 status and plasma experiments both with air and with hydrogen as filling gas are described. Transition from a weak plasma to an inductively coupled plasma is clearly evident for the former gas and may be triggered by rising the rf power (over 0.5 kW) at low pressure (equal or below 2 Pa). Transition in hydrogen plasma requires more rf power (over 1.5 kW).
- 25 November 2015
- Published by AIP Publishing in Review of Scientific Instruments
- Vol. 87 (2) , 02B320
First experiments with the negative ion source NIO1
Neutral Beam Injectors (NBIs), which need to be strongly optimized in the perspective of DEMO reactor, request a thorough understanding of the negative ion source used and of the multi-beamlet optics. A relatively compact radio frequency (rf) ion source, named NIO1 (Negative Ion Optimization 1), with 9 beam apertures for a total H− current of 130 mA, 60 kV acceleration voltage, was installed at Consorzio RFX, including a high voltage deck and an X-ray shield, to provide a test bench for source optimizations for activities in support to the ITER NBI test facility. NIO1 status and plasma experiments both with air and with hydrogen as filling gas are described. Transition from a weak plasma to an inductively coupled plasma is clearly evident for the former gas and may be triggered by rising the rf power (over 0.5 kW) at low pressure (equal or below 2 Pa). Transition in hydrogen plasma requires more rf power (over 1.5 kW).
- 1 January 2015
- Published by Jagiellonian University in Acta Physica Polonica B
- Vol. 46 (3)
The SPES Project at LNL: Status of the Project, Technical Challenges, Instrumentation, Scientific Program
- 1 January 2015
- Published by Jagiellonian University in Acta Physica Polonica B
- Vol. 46 (3)
The SPES Project at LNL: Status of the Project, Technical Challenges, Instrumentation, Scientific Program
- 1 October 2014
- Published by Elsevier in Fusion Engineering and Design
- Vol. 89 (9-10) , 2388-2392
Hardware availability calculations and results of the IFMIF accelerator facility
- 1 October 2014
- Published by Elsevier in Fusion Engineering and Design
- Vol. 89 (9-10) , 2388-2392
Hardware availability calculations and results of the IFMIF accelerator facility