Francisco Martínez-Moreno
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Francisco Martínez-Moreno has a total of 31 co-authors. Here are the top co-authors by number of shared publications:
- Eduardo Lorenzo
Solar Energy Institute Polytechnic University of Madrid Madrid Spain
8 shared publications - Javier Muñoz
Instituto de Energía Solar, Grupo de Sistemas Fotovoltaicos, Universidad Politécnica de Madrid (IES-UPM), Ciudad Universitaria s/n, 28040 Madrid, Spain
4 shared publications - Luis Narvarte
Instituto de Energía Solar, Universidad Politécnica de Madrid (IES-UPM), 28040 Madrid, Spain
3 shared publications R. Moretón
3 shared publicationsG. Sala
Instituto de Energía Solar, UPM, Ciudad Universitaria s/n, 28040 Madrid, Spain
2 shared publicationsLuis Fialho
2 shared publications
Latest Publications
- 11 August 2022
- Published by Elsevier in Solar Energy
- Vol. 243, 327-335
First bifacial PV modules early 1983
- 11 August 2022
- Published by Elsevier in Solar Energy
- Vol. 243, 327-335
First bifacial PV modules early 1983
- Open Access
- 1 April 2019
- Published by Elsevier in Energy Conversion and Management
- Vol. 186, 516-525
On the number of PV modules in series for large-power irrigation systems
- 1 April 2019
- Published by Elsevier in Energy Conversion and Management
- Vol. 186, 516-525
Open AccessOn the number of PV modules in series for large-power irrigation systems
- Open Access
Development and Test of Solutions to Enlarge the Power of PV Irrigation and Application to a 140 kW PV-Diesel Representative Case
The current state of the art of photovoltaic (PV) irrigation systems is limited to PV peak powers below 40 kWp, which does not cover the irrigation needs of farmers, co-operatives, irrigator communities, and agro-industries. This limitation of power is due to two main technical barriers: The quick intermittence of PV power due to the passing of clouds, and the maladjustment between PV production and water needs. This paper presents new solutions that have been developed to overcome these barriers and their application to the design and performance of a 140 kWp hybrid PV-diesel system for the drip irrigation of 195 ha of olive trees in Alter do Chão, Portugal. The performance of the solutions was analysed during two years of real operation. As the performance of the PV system is not only affected by intrinsic-to-design characteristics, but also by circumstances external to the system, new performance indices were developed. As an example, the percentage of use of PV electricity, PVSH, was 78% and 82% in 2017 and 2018, respectively, and the performance ratio of the PV part, PRPV, was 0.79 and 0.80. The economic feasibility was also analysed based on experimental data, resulting in savings in the levelized cost of electricity of 61%.
Open AccessDevelopment and Test of Solutions to Enlarge the Power of PV Irrigation and Application to a 140 kW PV-Diesel Representative Case
The current state of the art of photovoltaic (PV) irrigation systems is limited to PV peak powers below 40 kWp, which does not cover the irrigation needs of farmers, co-operatives, irrigator communities, and agro-industries. This limitation of power is due to two main technical barriers: The quick intermittence of PV power due to the passing of clouds, and the maladjustment between PV production and water needs. This paper presents new solutions that have been developed to overcome these barriers and their application to the design and performance of a 140 kWp hybrid PV-diesel system for the drip irrigation of 195 ha of olive trees in Alter do Chão, Portugal. The performance of the solutions was analysed during two years of real operation. As the performance of the PV system is not only affected by intrinsic-to-design characteristics, but also by circumstances external to the system, new performance indices were developed. As an example, the percentage of use of PV electricity, PVSH, was 78% and 82% in 2017 and 2018, respectively, and the performance ratio of the PV part, PRPV, was 0.79 and 0.80. The economic feasibility was also analysed based on experimental data, resulting in savings in the levelized cost of electricity of 61%.
- 1 January 2018
- Published by Elsevier in Solar Energy Materials and Solar Cells
- Vol. 174, 485-493
In-the-field PID related experiences
- 1 January 2018
- Published by Elsevier in Solar Energy Materials and Solar Cells
- Vol. 174, 485-493
In-the-field PID related experiences
- 1 October 2017
- Published by Elsevier in Solar Energy
- Vol. 155, 880-892
Uncertainties on the outdoor characterization of PV modules and the calibration of reference modules
- 1 October 2017
- Published by Elsevier in Solar Energy
- Vol. 155, 880-892
Uncertainties on the outdoor characterization of PV modules and the calibration of reference modules
- Open Access
- 1 October 2017
- Published by Elsevier in Renewable and Sustainable Energy Reviews
- Vol. 78, 780-797
PV performance modelling: A review in the light of quality assurance for large PV plants
- 1 October 2017
- Published by Elsevier in Renewable and Sustainable Energy Reviews
- Vol. 78, 780-797
Open AccessPV performance modelling: A review in the light of quality assurance for large PV plants
- Open Access
In-field assessment of batteries and PV modules in a large photovoltaic rural electrification programme
- 31 March 2011
- Published by Wiley in Progress in Photovoltaics: Research and Applications
- Vol. 20 (1) , 100-105
On the testing of large PV arrays
This paper reports on the IES‐UPM experience from 2006 to 2010 in the field of the characterization of PV arrays of commercial large PV plants installed in Spain within the framework of the profitable economic scenarios associated to feed‐in tariff laws. This experience has extended to 200 MW and has provided valuable lessons to minimize uncertainty, which plays a key role in quality assurance procedures. The paper deals not only with classic I–V measurements but also with watt‐metering‐based procedures. Particular attention is paid to the selection of irradiance and cell temperature sensors. Copyright © 2011 John Wiley & Sons, Ltd.
- 31 March 2011
- Published by Wiley in Progress in Photovoltaics: Research and Applications
- Vol. 20 (1) , 100-105
On the testing of large PV arrays
This paper reports on the IES‐UPM experience from 2006 to 2010 in the field of the characterization of PV arrays of commercial large PV plants installed in Spain within the framework of the profitable economic scenarios associated to feed‐in tariff laws. This experience has extended to 200 MW and has provided valuable lessons to minimize uncertainty, which plays a key role in quality assurance procedures. The paper deals not only with classic I–V measurements but also with watt‐metering‐based procedures. Particular attention is paid to the selection of irradiance and cell temperature sensors. Copyright © 2011 John Wiley & Sons, Ltd.