Joseph DiMarco
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Joseph DiMarco has a total of 233 co-authors. Here are the top co-authors by number of shared publications:
- Stoyan Stoynev
Fermi National Accelerator Laboratory
20 shared publications - Giorgio Ambrosio
Fermilab
16 shared publications - Guram Chlachidze
Fermi National Accelerator Laboratory, Batavia, IL, USA
16 shared publications - Thomas Strauss
Fermi National Accelerator Laboratory
16 shared publications - Sandor Feher
Fermi National Accelerator Laboratory, Batavia, IL, USA
13 shared publications - GianLuca Sabbi
Lawrence Berkeley National Laboratory
12 shared publications
Latest Publications
- Open Access
- 14 August 2026
- Published by American Physical Society (APS) in Physical Review Accelerators and Beams
- Vol. 29 (8)
Fabrication and test of a 6-tesla-class high-temperature superconducting dipole magnet at 4.2 K
Superconducting magnets enable energy-frontier accelerators by generating strong magnetic fields to steer and focus the particles. Although high-temperature superconductors such as REBa 2 Cu 3 O x (, RE = rare earth) hold a strong potential for generating a higher magnetic field than Nb-Ti and Nb 3 Sn , the associated magnet and conductor technology for accelerator applications is still in its infancy. The U.S. Magnet Development Program is developing magnet technology in collaboration with industry. Here we report an experiment of making a dipole magnet called C3 using commercial high-temperature superconducting wires. The magnet, following a canted cos θ design, generated a dipole field of 5.99 T at 4.2 K in its clear aperture of 65 mm at 6.795 kA when a resistive voltage of 105 μ V appeared across one of the coils in the magnet. The stored energy was 53 kJ at the peak field. The magnet showed no degradation in the current-carrying capability at 4.2 K after the thermal cycle. We report on the detailed design, fabrication, and performance of the C3 magnet that can be of interest to potential users of this emerging technology. We also discuss issues and research needs to inform future magnet development. The experiment represented another step to addressing if the high-temperature superconducting accelerator magnet technology can increase the discovery capability of future particle accelerators.
- 14 August 2026
- Published by American Physical Society (APS) in Physical Review Accelerators and Beams
- Vol. 29 (8)
Open AccessFabrication and test of a 6-tesla-class high-temperature superconducting dipole magnet at 4.2 K
Superconducting magnets enable energy-frontier accelerators by generating strong magnetic fields to steer and focus the particles. Although high-temperature superconductors such as REBa 2 Cu 3 O x (, RE = rare earth) hold a strong potential for generating a higher magnetic field than Nb-Ti and Nb 3 Sn , the associated magnet and conductor technology for accelerator applications is still in its infancy. The U.S. Magnet Development Program is developing magnet technology in collaboration with industry. Here we report an experiment of making a dipole magnet called C3 using commercial high-temperature superconducting wires. The magnet, following a canted cos θ design, generated a dipole field of 5.99 T at 4.2 K in its clear aperture of 65 mm at 6.795 kA when a resistive voltage of 105 μ V appeared across one of the coils in the magnet. The stored energy was 53 kJ at the peak field. The magnet showed no degradation in the current-carrying capability at 4.2 K after the thermal cycle. We report on the detailed design, fabrication, and performance of the C3 magnet that can be of interest to potential users of this emerging technology. We also discuss issues and research needs to inform future magnet development. The experiment represented another step to addressing if the high-temperature superconducting accelerator magnet technology can increase the discovery capability of future particle accelerators.
- 29 January 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 36 (3) , 1-6
Evaluation of the Room Temperature Field Quality Measurements of HL-LHC MQXFA Magnet Assemblies
As a member of the multi-lab U.S. High Luminosity LHC Accelerator Upgrade Project (HL-LHC AUP), Lawrence Berkeley National Laboratory (LBNL) is assembling high-field Nb3Sn low-beta MQXFA quadrupole magnets for eventual installation at CERN as part of the HL-LHC upgrade. Each magnet undergoes room temperature magnetic measurements at two points during the assembly process: once after completion of the coil pack sub-assembly and once after the magnet is fully assembled and pre-loaded. Beyond its use to verify that each magnet assembly can meet operational requirements, the data from this two-stage measurement process allow for investigation into the impact of the pre-loading operation on field quality. Recent measurements on magnet rebuilds as well as exploratory coil pack reconfigurations also provide an opportunity to see in isolation the effects of changes to a magnet’s coil selection or coil layout. In this work, we present the magnetic measurement results of MQXFA magnets assembled or currently in process, focusing particularly on magnets with data corresponding to multiple builds, and discuss trends and insights which may be beneficial for the remaining MQXFA magnet production or for future Nb3Sn accelerator magnets.
- 29 January 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 36 (3) , 1-6
Evaluation of the Room Temperature Field Quality Measurements of HL-LHC MQXFA Magnet Assemblies
As a member of the multi-lab U.S. High Luminosity LHC Accelerator Upgrade Project (HL-LHC AUP), Lawrence Berkeley National Laboratory (LBNL) is assembling high-field Nb3Sn low-beta MQXFA quadrupole magnets for eventual installation at CERN as part of the HL-LHC upgrade. Each magnet undergoes room temperature magnetic measurements at two points during the assembly process: once after completion of the coil pack sub-assembly and once after the magnet is fully assembled and pre-loaded. Beyond its use to verify that each magnet assembly can meet operational requirements, the data from this two-stage measurement process allow for investigation into the impact of the pre-loading operation on field quality. Recent measurements on magnet rebuilds as well as exploratory coil pack reconfigurations also provide an opportunity to see in isolation the effects of changes to a magnet’s coil selection or coil layout. In this work, we present the magnetic measurement results of MQXFA magnets assembled or currently in process, focusing particularly on magnets with data corresponding to multiple builds, and discuss trends and insights which may be beneficial for the remaining MQXFA magnet production or for future Nb3Sn accelerator magnets.
- 12 December 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 36 (3) , 1-5
Magnetic Measurements of Fermilab Rapid-Cycling Booster Gradient Magnets
Fermilab is upgrading its Booster synchrotron to increase ramp rate and intensity. This is part of the Proton Improvement Plan (PIP-II) that will allow the Main Injector to achieve proton beam power of 1.2 MW within the next few years. This upgrade includes running the 55-year-old Booster magnets at 20 Hz instead of the usual 15 Hz, and construction of some shorter and wider aperture versions of these combined-function gradient magnets. Magnetic measurements were performed to characterize the present 15 Hz AC performance, and then again with 20 Hz ramp cycle to ensure performance and compatibility in this new operating regime. A 3 m-long curved flat-coil was developed for these measurements using Printed Circuit Board (PCB) technology. The probe also has a separate 0.5 m-long body-field probe, allowing integral, body, and end fields to be measured across 100 mm of the magnet aperture. The sampling rate for these measurements during the AC cycle was 200 kHz, and field resolution was better than 0.01%. Details of the probe, measurements, and results are presented.
- 12 December 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 36 (3) , 1-5
Magnetic Measurements of Fermilab Rapid-Cycling Booster Gradient Magnets
Fermilab is upgrading its Booster synchrotron to increase ramp rate and intensity. This is part of the Proton Improvement Plan (PIP-II) that will allow the Main Injector to achieve proton beam power of 1.2 MW within the next few years. This upgrade includes running the 55-year-old Booster magnets at 20 Hz instead of the usual 15 Hz, and construction of some shorter and wider aperture versions of these combined-function gradient magnets. Magnetic measurements were performed to characterize the present 15 Hz AC performance, and then again with 20 Hz ramp cycle to ensure performance and compatibility in this new operating regime. A 3 m-long curved flat-coil was developed for these measurements using Printed Circuit Board (PCB) technology. The probe also has a separate 0.5 m-long body-field probe, allowing integral, body, and end fields to be measured across 100 mm of the magnet aperture. The sampling rate for these measurements during the AC cycle was 200 kHz, and field resolution was better than 0.01%. Details of the probe, measurements, and results are presented.
- 3 November 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 36 (3) , 1-6
Oakridge PPU Magnets: Results and Measurements
The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL) is being upgraded from 1.0 GeV to 1.3 GeV (or 1.4 to 2.8 MW). Several water-cooled magnets have been upgraded to transport 30% higher beam energy. Fermilab contributed the magnet design for the new chicane magnets and injection/extraction septum. Designing the magnets was a challenging task because the new magnets required good combined integrated field quality and needed to occupy the old magnets space but with about 20% greater integrated magnetic field. Additional strong requirements applied to the magnets fringe field so as not to disturb the circulating beam. After fabrication of the magnets, an extensive measurement campaign was developed and performed at Fermilab’s Magnet Test Facility. The measurements needed to assess magnet performance and provide comparison to design calculations. These included verification of field strength and harmonics along an 8 m length and 200 mm good field diameter for the chicane dipoles, end-field Hall probe mapping of these magnets, and measurements along two differently curved trajectories within the ∼3 m septum gradient magnet. Details of the measurements and systems are presented along with results and comparison to field models.
- 3 November 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 36 (3) , 1-6
Oakridge PPU Magnets: Results and Measurements
The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL) is being upgraded from 1.0 GeV to 1.3 GeV (or 1.4 to 2.8 MW). Several water-cooled magnets have been upgraded to transport 30% higher beam energy. Fermilab contributed the magnet design for the new chicane magnets and injection/extraction septum. Designing the magnets was a challenging task because the new magnets required good combined integrated field quality and needed to occupy the old magnets space but with about 20% greater integrated magnetic field. Additional strong requirements applied to the magnets fringe field so as not to disturb the circulating beam. After fabrication of the magnets, an extensive measurement campaign was developed and performed at Fermilab’s Magnet Test Facility. The measurements needed to assess magnet performance and provide comparison to design calculations. These included verification of field strength and harmonics along an 8 m length and 200 mm good field diameter for the chicane dipoles, end-field Hall probe mapping of these magnets, and measurements along two differently curved trajectories within the ∼3 m septum gradient magnet. Details of the measurements and systems are presented along with results and comparison to field models.
- 3 November 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 36 (3) , 1-5
Test Results of the LQXFA/B02 and LQXFA/B03 Cryo-Assemblies for the High Luminosity LHC Upgrade
The US High-Luminosity LHC Accelerator Upgrade Project (AUP) is responsible for delivering cryo-assemblies for the Q1/Q3 quadrupole optical components of the High Luminosity LHC upgrade at CERN. Total of 10 cryo-assemblies containing two Nb3Sn quadrupole magnets per cold mass will be delivered within this program. After the successful test of the first pre-series cryo-assembly in 2023, two more cryo-assemblies were tested at Fermilab's horizontal test facility. Production overview and the test results of the LQXFA/B02 and LQXFA/B03 cryo-assemblies are summarized in this paper. After the first test, to increase the capability of the horizontal test facility, various improvements have been made. These improvements are also described in this paper.
- 3 November 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 36 (3) , 1-5
Test Results of the LQXFA/B02 and LQXFA/B03 Cryo-Assemblies for the High Luminosity LHC Upgrade
The US High-Luminosity LHC Accelerator Upgrade Project (AUP) is responsible for delivering cryo-assemblies for the Q1/Q3 quadrupole optical components of the High Luminosity LHC upgrade at CERN. Total of 10 cryo-assemblies containing two Nb3Sn quadrupole magnets per cold mass will be delivered within this program. After the successful test of the first pre-series cryo-assembly in 2023, two more cryo-assemblies were tested at Fermilab's horizontal test facility. Production overview and the test results of the LQXFA/B02 and LQXFA/B03 cryo-assemblies are summarized in this paper. After the first test, to increase the capability of the horizontal test facility, various improvements have been made. These improvements are also described in this paper.
- Open Access
Magnetic measurements of Fermilab rapid-cycling Booster gradient magnets
Fermilab is upgrading its Booster synchrotron to increase ramp rate and intensity. This is part of the Proton Improvement Plan (PIP-II) that will allow the Main Injector to achieve proton beam power of 1.2 MW within the next few years. This upgrade includes running the 55-year-old Booster magnets at 20 Hz instead of the usual 15 Hz, and construction of some shorter and wider aperture versions of these combined-function gradient magnets. Magnetic measurements were performed to characterize the present 15 Hz AC performance, and then again with 20 Hz ramp cycle to ensure performance and compatibility in this new operating regime. A 3 m-long curved flat-coil was developed for these measurements using Printed Circuit Board (PCB) technology. The probe also has a separate 0.5 m-long body-field probe, allowing integral, body, and end fields to be measured across 100 mm of the magnet aperture. The sampling rate for these measurements during the AC cycle was 200 kHz, and field resolution was better than 0.01%. Details of the probe, measurements, and results are presented.
Open AccessMagnetic measurements of Fermilab rapid-cycling Booster gradient magnets
Fermilab is upgrading its Booster synchrotron to increase ramp rate and intensity. This is part of the Proton Improvement Plan (PIP-II) that will allow the Main Injector to achieve proton beam power of 1.2 MW within the next few years. This upgrade includes running the 55-year-old Booster magnets at 20 Hz instead of the usual 15 Hz, and construction of some shorter and wider aperture versions of these combined-function gradient magnets. Magnetic measurements were performed to characterize the present 15 Hz AC performance, and then again with 20 Hz ramp cycle to ensure performance and compatibility in this new operating regime. A 3 m-long curved flat-coil was developed for these measurements using Printed Circuit Board (PCB) technology. The probe also has a separate 0.5 m-long body-field probe, allowing integral, body, and end fields to be measured across 100 mm of the magnet aperture. The sampling rate for these measurements during the AC cycle was 200 kHz, and field resolution was better than 0.01%. Details of the probe, measurements, and results are presented.
- Open Access
Oakridge PPU Magnets: Results and Measurements
The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL) is being upgraded from 1.0 GeV to 1.3 GeV (or 1.4 to 2.8 MW). Several water-cooled magnets have been upgraded to transport 30% higher beam energy. Fermilab contributed the magnet design for the new chicane magnets and injection/extraction septum. Designing the magnets was a challenging task because the new magnets required good combined integrated field quality and needed to occupy the old magnets space but with about 20% greater integrated magnetic field. Additional strong requirements applied to the magnets fringe field so as not to disturb the circulating beam. After fabrication of the magnets, an extensive measurement campaign was developed and performed at Fermilab's Magnet Test Facility. The measurements needed to assess magnet performance and provide comparison to design calculations. These included verification of field strength and harmonics along an 8 m length and 200 mm good field diameter for the chicane dipoles, end-field Hall probe mapping of these magnets, and measurements along two differently curved trajectories within the ~3 m septum gradient magnet. Details of the measurements and systems are presented along with results and comparison to field models.
Open AccessOakridge PPU Magnets: Results and Measurements
The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL) is being upgraded from 1.0 GeV to 1.3 GeV (or 1.4 to 2.8 MW). Several water-cooled magnets have been upgraded to transport 30% higher beam energy. Fermilab contributed the magnet design for the new chicane magnets and injection/extraction septum. Designing the magnets was a challenging task because the new magnets required good combined integrated field quality and needed to occupy the old magnets space but with about 20% greater integrated magnetic field. Additional strong requirements applied to the magnets fringe field so as not to disturb the circulating beam. After fabrication of the magnets, an extensive measurement campaign was developed and performed at Fermilab's Magnet Test Facility. The measurements needed to assess magnet performance and provide comparison to design calculations. These included verification of field strength and harmonics along an 8 m length and 200 mm good field diameter for the chicane dipoles, end-field Hall probe mapping of these magnets, and measurements along two differently curved trajectories within the ~3 m septum gradient magnet. Details of the measurements and systems are presented along with results and comparison to field models.
- 13 February 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 35 (5) , 1-5
Application of Flex-QA Arrays in HTS Magnet Testing
Flexible PCB quench antennas have been very useful in providing high-quality high-resolution data in low temperature superconducting magnet tests. Similar multi-sensor arrays have been employed recently to cover a high temperature superconductor magnet tested at FNAL. In the present work, data taking conditions and magnet features to support the analysis framework are discussed. Then observations made during complete magnet powering cycles are described and analysis of quench antenna data are presented. Based on results, improvements to instrumentation and data taking are debated. Views on the future of flexible quench antenna sensors for HTS magnet diagnostics and operational support are shared.
- 13 February 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 35 (5) , 1-5
Application of Flex-QA Arrays in HTS Magnet Testing
Flexible PCB quench antennas have been very useful in providing high-quality high-resolution data in low temperature superconducting magnet tests. Similar multi-sensor arrays have been employed recently to cover a high temperature superconductor magnet tested at FNAL. In the present work, data taking conditions and magnet features to support the analysis framework are discussed. Then observations made during complete magnet powering cycles are described and analysis of quench antenna data are presented. Based on results, improvements to instrumentation and data taking are debated. Views on the future of flexible quench antenna sensors for HTS magnet diagnostics and operational support are shared.
- 11 December 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 35 (5) , 1-7
Re-Assembly and Test of a COMB Dipole Magnet With STAR Wires
Rare-Earth Barium Copper Oxide (REBCO) coated conductors are an attractive option for application in high field accelerator magnets due to their high critical field and the convenience of fabrication without heat treatment compared to some other superconductors. A small REBCO accelerator magnet was previously fabricated and tested in liquid nitrogen, demonstrating over 90% critical current retention in the coils. This paper describes the magnet re-assembly with a different support structure and its test in liquid helium at 1.8–4.5 K. The magnet quench history along with the instrumentation data is presented and discussed.
- 11 December 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 35 (5) , 1-7
Re-Assembly and Test of a COMB Dipole Magnet With STAR Wires
Rare-Earth Barium Copper Oxide (REBCO) coated conductors are an attractive option for application in high field accelerator magnets due to their high critical field and the convenience of fabrication without heat treatment compared to some other superconductors. A small REBCO accelerator magnet was previously fabricated and tested in liquid nitrogen, demonstrating over 90% critical current retention in the coils. This paper describes the magnet re-assembly with a different support structure and its test in liquid helium at 1.8–4.5 K. The magnet quench history along with the instrumentation data is presented and discussed.
- Open Access
Printed Circuit Board Based Rotating Coils for Measuring Sextupole Magnets
The use of Printed Circuit Boards (PCBs) for the inductive pick-up windings of rotating coil probes has made the construction of these precision magnetic measurement devices much more accessible. This paper discusses the design details for PCBs which on each layer of the board provide for simultaneous analog bucking (suppression) of dipole, quadrupole, and sextupole field components so as to more accurately measure the higher order harmonic fields in sextupole magnets. Techniques to generate designs are discussed, as well as trade-offs to optimize sensitivity. Examples of recent sextupole PCBs and their performance are given.
Open AccessPrinted Circuit Board Based Rotating Coils for Measuring Sextupole Magnets
The use of Printed Circuit Boards (PCBs) for the inductive pick-up windings of rotating coil probes has made the construction of these precision magnetic measurement devices much more accessible. This paper discusses the design details for PCBs which on each layer of the board provide for simultaneous analog bucking (suppression) of dipole, quadrupole, and sextupole field components so as to more accurately measure the higher order harmonic fields in sextupole magnets. Techniques to generate designs are discussed, as well as trade-offs to optimize sensitivity. Examples of recent sextupole PCBs and their performance are given.