Sandor Feher
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Sandor Feher has a total of 211 co-authors. Here are the top co-authors by number of shared publications:
- Giorgio Ambrosio
Fermilab
19 shared publications - Guram Chlachidze
Fermi National Accelerator Laboratory, Batavia, IL, USA
16 shared publications - Joseph DiMarco
Fermi National Accelerator Laboratory, Batavia, IL, USA
13 shared publications - Maria Baldini
Fermilab
13 shared publications - Thomas Strauss
Fermi National Accelerator Laboratory
13 shared publications - Stoyan Stoynev
Fermi National Accelerator Laboratory
12 shared publications
Latest Publications
- 3 November 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 36 (3) , 1-5
Test Results of the LQXFA/B02 and LQXFA/B03 Cryo-Assemblies for the High Luminosity LHC Upgrade
The US High-Luminosity LHC Accelerator Upgrade Project (AUP) is responsible for delivering cryo-assemblies for the Q1/Q3 quadrupole optical components of the High Luminosity LHC upgrade at CERN. Total of 10 cryo-assemblies containing two Nb3Sn quadrupole magnets per cold mass will be delivered within this program. After the successful test of the first pre-series cryo-assembly in 2023, two more cryo-assemblies were tested at Fermilab's horizontal test facility. Production overview and the test results of the LQXFA/B02 and LQXFA/B03 cryo-assemblies are summarized in this paper. After the first test, to increase the capability of the horizontal test facility, various improvements have been made. These improvements are also described in this paper.
- 3 November 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 36 (3) , 1-5
Test Results of the LQXFA/B02 and LQXFA/B03 Cryo-Assemblies for the High Luminosity LHC Upgrade
The US High-Luminosity LHC Accelerator Upgrade Project (AUP) is responsible for delivering cryo-assemblies for the Q1/Q3 quadrupole optical components of the High Luminosity LHC upgrade at CERN. Total of 10 cryo-assemblies containing two Nb3Sn quadrupole magnets per cold mass will be delivered within this program. After the successful test of the first pre-series cryo-assembly in 2023, two more cryo-assemblies were tested at Fermilab's horizontal test facility. Production overview and the test results of the LQXFA/B02 and LQXFA/B03 cryo-assemblies are summarized in this paper. After the first test, to increase the capability of the horizontal test facility, various improvements have been made. These improvements are also described in this paper.
- 17 January 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 35 (5) , 1-7
Status and Challenges in the MQXFB Nb3Sn Quadrupoles for the HL-LHC
The inner triplet (or low-β) quadrupole magnets are among the components to be upgraded in LHC interaction regions for the HL-LHC project. The new quadrupole magnets, called MQXF, are based on Nb3Sn superconducting magnet technology, with a conductor peak field of 11.3 T. CERN is in charge of the fabrication of the MQXFB variant, the longest Nb3Sn accelerator magnets designed and manufactured up to now, with a magnetic length of 7.2 m. Two magnets, MQXFBP3 and MQXFB02, reached the HL-LHC project requirements. However, they still exhibited a limitation at 4.5 K with a phenomenology similar to the one observed on the first two prototypes. After improvements on the cold mass (longitudinal welding) and magnet assembly (elimination of overstress on the conductor during loading) procedures, a series of modifications were implemented in MQXFB03 at the level of the coil fabrication to address and/or reduce weaknesses in the coils. The magnet was tested and was the first to achieve performance requirements at both 1.9 K and 4.5 K, with no signs of conductor limitation at 4.5 K. MQXFB is now in the series production phase, with around 2/3 of the coils completed and half of the magnets assembled. We provide in this paper an overview of the MQXFB program, with a summary of the main recent achievements and an overall status of the fabrication.
- 17 January 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 35 (5) , 1-7
Status and Challenges in the MQXFB Nb3Sn Quadrupoles for the HL-LHC
The inner triplet (or low-β) quadrupole magnets are among the components to be upgraded in LHC interaction regions for the HL-LHC project. The new quadrupole magnets, called MQXF, are based on Nb3Sn superconducting magnet technology, with a conductor peak field of 11.3 T. CERN is in charge of the fabrication of the MQXFB variant, the longest Nb3Sn accelerator magnets designed and manufactured up to now, with a magnetic length of 7.2 m. Two magnets, MQXFBP3 and MQXFB02, reached the HL-LHC project requirements. However, they still exhibited a limitation at 4.5 K with a phenomenology similar to the one observed on the first two prototypes. After improvements on the cold mass (longitudinal welding) and magnet assembly (elimination of overstress on the conductor during loading) procedures, a series of modifications were implemented in MQXFB03 at the level of the coil fabrication to address and/or reduce weaknesses in the coils. The magnet was tested and was the first to achieve performance requirements at both 1.9 K and 4.5 K, with no signs of conductor limitation at 4.5 K. MQXFB is now in the series production phase, with around 2/3 of the coils completed and half of the magnets assembled. We provide in this paper an overview of the MQXFB program, with a summary of the main recent achievements and an overall status of the fabrication.
- Open Access
- 20 May 2024
- Published by Office of Scientific and Technical Information (OSTI)
Test Stand Functional Requirements for Testing MQXFA Magnets and Q1/Q3 Cryostat Assemblies (Rev.3)
This document specifies test stand requirements for testing the High Luminosity LHC (HL-LHC, or HiLumi LHC) MQXFA magnets and LQXFA/B cryostat assemblies. Total of 12 (3 pre-series, 7 series production and 2 re-work) of these cryostat assemblies are expected to be fabricated and delivered to CERN by the U.S. HL-LHC Accelerator Upgrade Project (US HL-LHC AUP) as part of the U.S. contributions to the LHC High Luminosity Upgrade. These cryostat assemblies are the quadrupole magnetic components of the HL-LHC Q1 (LQXFA) and Q3 (LQXFB) inner triplet optical elements in front of the interactions points 1 (ATLAS) and 5 (CMS). One LMQXFA cold mass is installed in each cryostat assembly and each cold mass consists of two MQXFA quadrupole magnets. MQXFA, LMQXFA and LQXFA/B functional requirements are specified in [1,2,3].MQXFA magnets will be tested at BNL Vertical Magnet Test Facility (VMTF) and 12 cryostat assembly tests planned at Fermilab’s Horizontal Magnet Test Facility (HMTF). This document specifies the test stand functional requirements for testing MQXFA magnets and LQXFA/B cryostat assemblies.
- 20 May 2024
- Published by Office of Scientific and Technical Information (OSTI)
Open AccessTest Stand Functional Requirements for Testing MQXFA Magnets and Q1/Q3 Cryostat Assemblies (Rev.3)
This document specifies test stand requirements for testing the High Luminosity LHC (HL-LHC, or HiLumi LHC) MQXFA magnets and LQXFA/B cryostat assemblies. Total of 12 (3 pre-series, 7 series production and 2 re-work) of these cryostat assemblies are expected to be fabricated and delivered to CERN by the U.S. HL-LHC Accelerator Upgrade Project (US HL-LHC AUP) as part of the U.S. contributions to the LHC High Luminosity Upgrade. These cryostat assemblies are the quadrupole magnetic components of the HL-LHC Q1 (LQXFA) and Q3 (LQXFB) inner triplet optical elements in front of the interactions points 1 (ATLAS) and 5 (CMS). One LMQXFA cold mass is installed in each cryostat assembly and each cold mass consists of two MQXFA quadrupole magnets. MQXFA, LMQXFA and LQXFA/B functional requirements are specified in [1,2,3].MQXFA magnets will be tested at BNL Vertical Magnet Test Facility (VMTF) and 12 cryostat assembly tests planned at Fermilab’s Horizontal Magnet Test Facility (HMTF). This document specifies the test stand functional requirements for testing MQXFA magnets and LQXFA/B cryostat assemblies.
- 20 March 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-5
AUP First Pre-Series Cryo-Assembly Design Production and Test Overview
New high field and large-aperture quadrupole magnets for the low-beta inner triplets (Q1, Q2, Q3) have been built and tested as part of the high-luminosity upgrade of the Large Hadron Collider (HL-LHC). These new quadrupole magnets are based on Nb3Sn superconducting technology. The US Accelerator Upgrade Project (US-AUP) is producing the Q1 and Q3 Cryo-Assemblies: a pair of ∼ 5 m long magnet structures installed in a stainless-steel helium vessel (Cold Mass) and surrounded by cryostat shields, piping, and a vacuum vessel. This paper gives an overview of the design, production, and the results of the horizontal test of the first pre-series Q1/Q3 Cryo-Assembly.
- 20 March 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-5
AUP First Pre-Series Cryo-Assembly Design Production and Test Overview
New high field and large-aperture quadrupole magnets for the low-beta inner triplets (Q1, Q2, Q3) have been built and tested as part of the high-luminosity upgrade of the Large Hadron Collider (HL-LHC). These new quadrupole magnets are based on Nb3Sn superconducting technology. The US Accelerator Upgrade Project (US-AUP) is producing the Q1 and Q3 Cryo-Assemblies: a pair of ∼ 5 m long magnet structures installed in a stainless-steel helium vessel (Cold Mass) and surrounded by cryostat shields, piping, and a vacuum vessel. This paper gives an overview of the design, production, and the results of the horizontal test of the first pre-series Q1/Q3 Cryo-Assembly.
- 19 February 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-5
AUP First Pre-series Cold Mass Installation Into the Cryostat
For the HiLumi LHC Upgrade (HL-LHC), new high field and large-aperture quadrupole magnets for the low-beta inner triplets (Q1, Q2, Q3) are being built. These new quadrupole magnets are based on Nb 3 Sn superconducting technology. As part of the US-HiLumi Accelerator Upgrade Project (AUP), ten Cryostat Assemblies (LQXFA) for Q1 and Q3 replacement will be built, tested, and delivered to CERN. The first LQXFA was assembled and tested at Fermi National Accelerator Laboratory (FNAL) during fall 2022 and spring/summer 2023, respectively. This paper summarizes the assembly process and experience of the first LQXFA Cryostat Assembly at FNAL.
- 19 February 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-5
AUP First Pre-series Cold Mass Installation Into the Cryostat
For the HiLumi LHC Upgrade (HL-LHC), new high field and large-aperture quadrupole magnets for the low-beta inner triplets (Q1, Q2, Q3) are being built. These new quadrupole magnets are based on Nb 3 Sn superconducting technology. As part of the US-HiLumi Accelerator Upgrade Project (AUP), ten Cryostat Assemblies (LQXFA) for Q1 and Q3 replacement will be built, tested, and delivered to CERN. The first LQXFA was assembled and tested at Fermi National Accelerator Laboratory (FNAL) during fall 2022 and spring/summer 2023, respectively. This paper summarizes the assembly process and experience of the first LQXFA Cryostat Assembly at FNAL.
- 14 February 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-4
Quench Performance of the First Pre-Series AUP Cryo-Assembly
The High Luminosity upgrade of the Large Hadron Collider (HL-LHC) at CERN will include eight cryo-assemblies that are expected to be fabricated and delivered to CERN by the US HL-LHC Accelerator Upgrade Project (AUP) as part of the U.S. contributions to the HL-LHC. These cryostat assemblies are the quadrupole magnetic components of the HL-LHC Q1 and Q3 inner triplet optical elements in front of the two interaction points. Each cryo-assembly consists of two 4.2 m long Nb 3 Sn quadrupole magnets with aperture 150 mm and operating gradient 132.6 T/m. The first pre-series cryo-assembly has been fabricated and successfully tested at the horizontal test facility at Fermi National Accelerator Laboratory. In this manuscript we report the quench test results of the LQXFA/B-01 cryo-assembly. The primary objective of the horizontal test is full cryo-assembly qualification and validation of the performance requirements.
- 14 February 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-4
Quench Performance of the First Pre-Series AUP Cryo-Assembly
The High Luminosity upgrade of the Large Hadron Collider (HL-LHC) at CERN will include eight cryo-assemblies that are expected to be fabricated and delivered to CERN by the US HL-LHC Accelerator Upgrade Project (AUP) as part of the U.S. contributions to the HL-LHC. These cryostat assemblies are the quadrupole magnetic components of the HL-LHC Q1 and Q3 inner triplet optical elements in front of the two interaction points. Each cryo-assembly consists of two 4.2 m long Nb 3 Sn quadrupole magnets with aperture 150 mm and operating gradient 132.6 T/m. The first pre-series cryo-assembly has been fabricated and successfully tested at the horizontal test facility at Fermi National Accelerator Laboratory. In this manuscript we report the quench test results of the LQXFA/B-01 cryo-assembly. The primary objective of the horizontal test is full cryo-assembly qualification and validation of the performance requirements.
- 18 December 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-4
Fermilab's Horizontal Test Stand Upgrade Overview and Commissioning
Cryo-assemblies with the Nb 3 Sn MQXFA low-beta quadrupoles for the High Luminosity LHC (HL-LHC) upgrade will be tested at Fermilab's magnet test facility. A total of 10 cryo-assemblies will be delivered to CERN within the US HL-LHC Accelerator Upgrade Project (AUP). The horizontal test stand at Fermilab already has been used for testing the existing LHC inner-triplet quadrupoles, but the stand and corresponding electrical and cryogenic sub-systems were not operational for more than a decade. In order to restore the test stand functions and meet the design and test requirements for the HL-LHC magnets, the existing horizontal test facility at Fermilab underwent a significant refurbishment of the cryogenic and mechanical components. Most of the upgrades were completed and verified during so called zero-magnet test by late 2020, and then final commissioning of the upgraded horizontal test stand was completed during the first cryo-assembly test in 2023. These tests verified the major cryo-mechanical installations, as well as the basic test stand operations, including controlled cooldown and operation at 1.9 K, magnet protection and process controls. Overview of the Fermilab's horizontal test facility upgrade and commissioning of these upgrades are presented in this paper.
- 18 December 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-4
Fermilab's Horizontal Test Stand Upgrade Overview and Commissioning
Cryo-assemblies with the Nb 3 Sn MQXFA low-beta quadrupoles for the High Luminosity LHC (HL-LHC) upgrade will be tested at Fermilab's magnet test facility. A total of 10 cryo-assemblies will be delivered to CERN within the US HL-LHC Accelerator Upgrade Project (AUP). The horizontal test stand at Fermilab already has been used for testing the existing LHC inner-triplet quadrupoles, but the stand and corresponding electrical and cryogenic sub-systems were not operational for more than a decade. In order to restore the test stand functions and meet the design and test requirements for the HL-LHC magnets, the existing horizontal test facility at Fermilab underwent a significant refurbishment of the cryogenic and mechanical components. Most of the upgrades were completed and verified during so called zero-magnet test by late 2020, and then final commissioning of the upgraded horizontal test stand was completed during the first cryo-assembly test in 2023. These tests verified the major cryo-mechanical installations, as well as the basic test stand operations, including controlled cooldown and operation at 1.9 K, magnet protection and process controls. Overview of the Fermilab's horizontal test facility upgrade and commissioning of these upgrades are presented in this paper.
- 13 December 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-6
Effect of CLIQ on Training of HL-LHC Quadrupole Magnets
The high-luminosity LHC upgrade requires stronger than LHC low-beta quadrupole magnets to reach the luminosity goals of the project. The project is well advanced and HL-LHC quadrupole magnets are currently being commissioned in US Labs (MQXFA magnets) and CERN (MQXFB magnets). Those are the first Nb 3 Sn magnets to be used in any large particle accelerator. At development stages, many Nb 3 Sn accelerator sub-scale models showed relatively slow training and MQXFA magnets were projected to have low tens of quenches before reaching operational field. Recently it was shown that dedicated capacitor-based de-vices can affect Nb 3 Sn magnet training, and it was suggested that CLIQ, a capacitor-based device intended for quench protection, can do too. The present paper investigates effects on training likely induced by CLIQ, using the base fact that only half the coils in a quadrupole experience upward current modulation at quench because of capacitor discharge. The study encompasses all MQXFA production magnets trained at BNL to date. No other high-statistics data from identical magnets (series) with CLIQ protection exist so far. Implications and opportunities stemming from data analysis are discussed and conclusions drawn.
- 13 December 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-6
Effect of CLIQ on Training of HL-LHC Quadrupole Magnets
The high-luminosity LHC upgrade requires stronger than LHC low-beta quadrupole magnets to reach the luminosity goals of the project. The project is well advanced and HL-LHC quadrupole magnets are currently being commissioned in US Labs (MQXFA magnets) and CERN (MQXFB magnets). Those are the first Nb 3 Sn magnets to be used in any large particle accelerator. At development stages, many Nb 3 Sn accelerator sub-scale models showed relatively slow training and MQXFA magnets were projected to have low tens of quenches before reaching operational field. Recently it was shown that dedicated capacitor-based de-vices can affect Nb 3 Sn magnet training, and it was suggested that CLIQ, a capacitor-based device intended for quench protection, can do too. The present paper investigates effects on training likely induced by CLIQ, using the base fact that only half the coils in a quadrupole experience upward current modulation at quench because of capacitor discharge. The study encompasses all MQXFA production magnets trained at BNL to date. No other high-statistics data from identical magnets (series) with CLIQ protection exist so far. Implications and opportunities stemming from data analysis are discussed and conclusions drawn.
- 6 December 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-5
Magnetic Measurements and Alignment Results of LQXFA/B Cold Mass Assemblies at Fermilab
MQXFA production series quadrupole magnets are being built for the Hi-Lumi (HL) LHC upgrade by the U.S. Accelerator Upgrade Project (US-HL-LHC AUP). These magnets are being placed in pairs, as a cold mass, within cryostats at Fermilab, and are being tested to assess alignment and magnetic performance at Fermilab's horizontal test stand facility. The ∼10 m - long assembly must meet stringent specifications for quadrupole strength and harmonic field integrals determination, magnetic axis position, and for magnet variations in positioning and local field profile. This paper describes the results of the magnetic and alignment measurements which characterize the first LQXFA/B assembly.
- 6 December 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-5
Magnetic Measurements and Alignment Results of LQXFA/B Cold Mass Assemblies at Fermilab
MQXFA production series quadrupole magnets are being built for the Hi-Lumi (HL) LHC upgrade by the U.S. Accelerator Upgrade Project (US-HL-LHC AUP). These magnets are being placed in pairs, as a cold mass, within cryostats at Fermilab, and are being tested to assess alignment and magnetic performance at Fermilab's horizontal test stand facility. The ∼10 m - long assembly must meet stringent specifications for quadrupole strength and harmonic field integrals determination, magnetic axis position, and for magnet variations in positioning and local field profile. This paper describes the results of the magnetic and alignment measurements which characterize the first LQXFA/B assembly.
- Open Access
- 5 October 2023
- Published by Office of Scientific and Technical Information (OSTI)
Fermilab’s horizontal test stand upgrade overview and commissioning
Cryo-assemblies with the low-beta Nb3Sn quadrupoles for the High Luminosity LHC (HL-LHC) upgrade will be tested at Fermilab’s magnet test facility. Total of 10 cryo-assemblies will be delivered to CERN within the US HL-LHC Accelerator Upgrade Project (AUP). The horizontal test stand at Fermilab already has been used for testing the existing LHC inner-triplet quadrupoles, but the stand and corresponding electrical and cryogenic sub-systems were not operational more than a decade. In order to restore the test stand functions and meet the design and test requirements for the high luminosity LHC magnets, the existing horizontal test facility at Fermilab underwent a significant refurbishment of the cryogenic and mechanical components. Most of the upgrades were completed and verified during so called zero-magnet test by late 2020, and then final commissioning of the upgraded test stand was completed during the first cryo-assembly test in 2023. These tests verified all the cryo-mechanical installations, as well as the test stand operations, including controlled cooldown and operation at 1.9 K, the helium recovery capabilities, magnet protection and process controls.
- 5 October 2023
- Published by Office of Scientific and Technical Information (OSTI)
Open AccessFermilab’s horizontal test stand upgrade overview and commissioning
Cryo-assemblies with the low-beta Nb3Sn quadrupoles for the High Luminosity LHC (HL-LHC) upgrade will be tested at Fermilab’s magnet test facility. Total of 10 cryo-assemblies will be delivered to CERN within the US HL-LHC Accelerator Upgrade Project (AUP). The horizontal test stand at Fermilab already has been used for testing the existing LHC inner-triplet quadrupoles, but the stand and corresponding electrical and cryogenic sub-systems were not operational more than a decade. In order to restore the test stand functions and meet the design and test requirements for the high luminosity LHC magnets, the existing horizontal test facility at Fermilab underwent a significant refurbishment of the cryogenic and mechanical components. Most of the upgrades were completed and verified during so called zero-magnet test by late 2020, and then final commissioning of the upgraded test stand was completed during the first cryo-assembly test in 2023. These tests verified all the cryo-mechanical installations, as well as the test stand operations, including controlled cooldown and operation at 1.9 K, the helium recovery capabilities, magnet protection and process controls.