Philippe Castagliola
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Philippe Castagliola has a total of 141 co-authors. Here are the top co-authors by number of shared publications:
- Michael Boon Chong Khoo
School of Mathematical Sciences, Universiti Sains Malaysia
25 shared publications - Giovanni Celano
Department of Civil Engineering and Architecture, University of Catania, Catania, Italy
20 shared publications - Jean-Claude Malela-Majika
Department of Statistics Faculty of Natural and Agricultural Sciences University of Pretoria Pretoria South Africa
15 shared publications - Sandile Charles Shongwe
Department of Mathematical Statistics and Actuarial Science, Faculty of Natural and Agricultural Sciences, University of the Free State, Bloemfontein 9301, South Africa
12 shared publications - Amirhossein Amiri
Shahed University
10 shared publications - Kim Phuc Tran
University of Lille, ENSAIT, ULR 2461 - GEMTEX - Génie et Matériaux Textiles
10 shared publications
Latest Publications
- 16 April 2026
- Published by Wiley in Quality and Reliability Engineering International
On Designing the Phase II Bayesian CUSUM Control Charts for Monitoring the Process Mean Under Guaranteed In‐Control Performance
Bayesian control charts have received much attention in statistical process control. In this paper, two types of Phase II CUSUM charts based on the predictive distribution, namely the predictive ratio CUSUM (PRC) chart and the simplified PRC (SPRC) chart, are constructed for detecting small and moderate shifts in the normal process mean under the guaranteed in‐control performance (GICP) design. Two cases are considered: Case I with an unknown mean and known standard deviation, and Case II with both unknown mean and standard deviation. Extensive simulation studies show that the proposed PRC and SPRC charts offer advantages over their frequentist counterparts when the Phase I reference sample is small or when prior information is available. Finally, a real example is provided to illustrate the applicability and effectiveness of the proposed charts.
- 16 April 2026
- Published by Wiley in Quality and Reliability Engineering International
On Designing the Phase II Bayesian CUSUM Control Charts for Monitoring the Process Mean Under Guaranteed In‐Control Performance
Bayesian control charts have received much attention in statistical process control. In this paper, two types of Phase II CUSUM charts based on the predictive distribution, namely the predictive ratio CUSUM (PRC) chart and the simplified PRC (SPRC) chart, are constructed for detecting small and moderate shifts in the normal process mean under the guaranteed in‐control performance (GICP) design. Two cases are considered: Case I with an unknown mean and known standard deviation, and Case II with both unknown mean and standard deviation. Extensive simulation studies show that the proposed PRC and SPRC charts offer advantages over their frequentist counterparts when the Phase I reference sample is small or when prior information is available. Finally, a real example is provided to illustrate the applicability and effectiveness of the proposed charts.
- 3 March 2026
- Published by Elsevier in European Journal of Operational Research
- Vol. 332 (2) , 522-541
Two new types of tolerance intervals for sample variances
- 3 March 2026
- Published by Elsevier in European Journal of Operational Research
- Vol. 332 (2) , 522-541
Two new types of tolerance intervals for sample variances
- 27 December 2025
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 213
A comprehensive review of time between events control charts: models, applications, and future directions
- 27 December 2025
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 213
A comprehensive review of time between events control charts: models, applications, and future directions
- 22 December 2025
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 213
Online process monitoring under quality data scarcity: Self-starting truncated EWMA schemes for time between events
- 22 December 2025
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 213
Online process monitoring under quality data scarcity: Self-starting truncated EWMA schemes for time between events
- 27 August 2025
- Published by Springer Nature
- p. 262-279
Integrating Sustainability with Equitable Operator Fatigue Distribution
- 27 August 2025
- Published by Springer Nature
- p. 262-279
Integrating Sustainability with Equitable Operator Fatigue Distribution
- 17 February 2025
- Published by Wiley in Quality and Reliability Engineering International
- Vol. 41 (5) , 1877-1894
Exponentially Weighted Moving Average Hypergeometric np Control Scheme
Control schemes are often used to monitor variables , but not all process data fit this description, as some data may actually be attributive in nature. For this reason, considerable attention has recently been paid to control schemes designed for attributes. In particular, new control schemes based on the hypergeometric distribution, namely hypergeometric p and np schemes, have been proposed. However, these schemes are mostly Shewhart‐type control schemes, and they are often criticized due to their inferior performance in detecting small and medium shifts. To address this issue, we present the exponentially weighted moving average (EWMA) hypergeometric np scheme in this paper. Similar to the hypergeometric np scheme, the proposed scheme is more practically convenient than the hypergeometric p scheme since it works with integer values. Since computing the run length properties for an EWMA scheme that depends on discrete data is challenging, we also consider the “continuousify” technique in this paper. We compare the introduced scheme with the existing hypergeometric np control scheme and demonstrate that the former scheme outperforms the latter scheme for all shift sizes. Furthermore, we investigate the optimal design of the EWMA hypergeometric np scheme to enhance its practicality and illustrate its application on a real dataset.
- 17 February 2025
- Published by Wiley in Quality and Reliability Engineering International
- Vol. 41 (5) , 1877-1894
Exponentially Weighted Moving Average Hypergeometric np Control Scheme
Control schemes are often used to monitor variables , but not all process data fit this description, as some data may actually be attributive in nature. For this reason, considerable attention has recently been paid to control schemes designed for attributes. In particular, new control schemes based on the hypergeometric distribution, namely hypergeometric p and np schemes, have been proposed. However, these schemes are mostly Shewhart‐type control schemes, and they are often criticized due to their inferior performance in detecting small and medium shifts. To address this issue, we present the exponentially weighted moving average (EWMA) hypergeometric np scheme in this paper. Similar to the hypergeometric np scheme, the proposed scheme is more practically convenient than the hypergeometric p scheme since it works with integer values. Since computing the run length properties for an EWMA scheme that depends on discrete data is challenging, we also consider the “continuousify” technique in this paper. We compare the introduced scheme with the existing hypergeometric np control scheme and demonstrate that the former scheme outperforms the latter scheme for all shift sizes. Furthermore, we investigate the optimal design of the EWMA hypergeometric np scheme to enhance its practicality and illustrate its application on a real dataset.
- 2 January 2025
- Published by Taylor & Francis in Quality Technology & Quantitative Management
- Vol. 23 (1) , 18-46
One-sided truncated EWMA control charts for monitoring two-parameter exponential distributed data
- 2 January 2025
- Published by Taylor & Francis in Quality Technology & Quantitative Management
- Vol. 23 (1) , 18-46
One-sided truncated EWMA control charts for monitoring two-parameter exponential distributed data
- 30 December 2024
- Published by Wiley in Quality and Reliability Engineering International
- Vol. 41 (4) , 1279-1292
Rank‐Based EWMA TBEA Control Chart
Recently, considerable attention has been paid to the development of time between events and amplitude (TBEA) control charts. Almost all existing TBEA charts are of a parametric type. Parametric TBEA charts have the disadvantage of being very sensitive to deviations from the distributional assumptions and to the estimation of the process nominal parameters. This emphasizes the importance of developing nonparametric (or distribution‐free) TBEA control charts. In this paper, a new distribution‐free exponentially weighted moving average (EWMA) TBEA control chart based on the rank statistic, denoted as rank‐based EWMA TBEA chart, for simultaneously monitoring the time interval between successive occurrences of an event and its magnitude is proposed. This chart is an extension of the sign EWMA TBEA chart and uses a statistic close to the Wilcoxon Mann–Whitney statistic. The run length properties of the new TBEA chart are obtained by Markov‐chain techniques, and some numerical comparisons with other competing charts reveal its promising performance. An illustrative example is also provided to demonstrate the application and the implementation of the proposed TBEA control chart using real‐world data.
- 30 December 2024
- Published by Wiley in Quality and Reliability Engineering International
- Vol. 41 (4) , 1279-1292
Rank‐Based EWMA TBEA Control Chart
Recently, considerable attention has been paid to the development of time between events and amplitude (TBEA) control charts. Almost all existing TBEA charts are of a parametric type. Parametric TBEA charts have the disadvantage of being very sensitive to deviations from the distributional assumptions and to the estimation of the process nominal parameters. This emphasizes the importance of developing nonparametric (or distribution‐free) TBEA control charts. In this paper, a new distribution‐free exponentially weighted moving average (EWMA) TBEA control chart based on the rank statistic, denoted as rank‐based EWMA TBEA chart, for simultaneously monitoring the time interval between successive occurrences of an event and its magnitude is proposed. This chart is an extension of the sign EWMA TBEA chart and uses a statistic close to the Wilcoxon Mann–Whitney statistic. The run length properties of the new TBEA chart are obtained by Markov‐chain techniques, and some numerical comparisons with other competing charts reveal its promising performance. An illustrative example is also provided to demonstrate the application and the implementation of the proposed TBEA control chart using real‐world data.
- 16 October 2024
- Published by Taylor & Francis in Communications in Statistics - Simulation and Computation
- Vol. 55 (2) , 619-638
Control charts for monitoring the capability of unstable process
- 16 October 2024
- Published by Taylor & Francis in Communications in Statistics - Simulation and Computation
- Vol. 55 (2) , 619-638
Control charts for monitoring the capability of unstable process