Rank‐Based EWMA TBEA Control Chart
- 30 December 2024
- journal article
- research article
- Published by Wiley in Quality and Reliability Engineering International
- Vol. 41 (4) , 1279-1292
Abstract
Recently, considerable attention has been paid to the development of time between events and amplitude (TBEA) control charts. Almost all existing TBEA charts are of a parametric type. Parametric TBEA charts have the disadvantage of being very sensitive to deviations from the distributional assumptions and to the estimation of the process nominal parameters. This emphasizes the importance of developing nonparametric (or distribution‐free) TBEA control charts. In this paper, a new distribution‐free exponentially weighted moving average (EWMA) TBEA control chart based on the rank statistic, denoted as rank‐based EWMA TBEA chart, for simultaneously monitoring the time interval between successive occurrences of an event and its magnitude is proposed. This chart is an extension of the sign EWMA TBEA chart and uses a statistic close to the Wilcoxon Mann–Whitney statistic. The run length properties of the new TBEA chart are obtained by Markov‐chain techniques, and some numerical comparisons with other competing charts reveal its promising performance. An illustrative example is also provided to demonstrate the application and the implementation of the proposed TBEA control chart using real‐world data.Keywords
Funding Information
- Fundação para a Ciência e a Tecnologia (UIDB/00006/2020)
This publication has 42 references indexed in Scilit:
- Time Between Events Monitoring with Control Charts2023
- Evaluation of Shewhart time‐between‐events‐and‐amplitude control charts for correlated dataQuality and Reliability Engineering International, 2020
- Performance measures of discrete and continuous time‐between‐events control chartsQuality and Reliability Engineering International, 2020
- A predictive Bayesian approach to sequential time‐between‐events monitoringQuality and Reliability Engineering International, 2019
- Nonparametric Statistical Process Control2019
- Phase II Shewhart-type Control Charts for Monitoring Times Between Events and Effects of Parameter EstimationQuality and Reliability Engineering International, 2014
- Exponential CUSUM Charts with Estimated Control LimitsQuality and Reliability Engineering International, 2013
- A new non‐parametric CUSUM mean chartQuality and Reliability Engineering International, 2010
- Impact of model misspecification on the exponential EWMA charts: a robustness study when the time‐between‐events are not exponentialQuality and Reliability Engineering International, 2010
- Properties of the exponential EWMA chart with parameter estimationQuality and Reliability Engineering International, 2009