  • Open Access

    The importance of verification, validation, and credibility in discrete simulation models for resilient freight transportation and terminal logistics: a literature review

    by Christoph Kogler, Pavel Maxera, Jakub Woletz

    1. Supply chains, with their interrelated financial, information, and material flows, place high demands on logistics and freight transportation in an increasingly globalized and digitalized world....

  • Open Access

    An international educational framework for teaching simulation

    by Christoph Kogler, Theresa Roeder, Antuela Tako, Anastasia Anagnostou


  • Open Access

    Empirical Insights into Salvage Wood Logistics

    by Christoph Kogler, Alexander Beiglböck, Peter Rauch

    Climate crises and natural disasters increasingly challenge wood supply chains by the critical need to transport high volumes of salvage wood quickly out of the forests to limit wood value loss and to prevent inducing forest calamities. Salvage wood logistics covering unimodal, multimodal and multi-echelon unimodal transport as well as storage plays an essential role in tackling existing problems and future risks by linking diverse actors along wood supply chains. Since little is known about specific challenges in salvage wood logistics, an extensive empirical study was conducted to evaluate logistics concepts and coping strategies involving stakeholders representing the entire wood value chain in Austria. The knowledge and experience of 161 forest owners, transport operators and wood-based industry actors were surveyed based on questionnaires with 108 matrix, rating, Likert scale and open questions. Results show a significant loss in salvage wood transport capacity due to long waiting times at receiving mills leading to more than one-fourth lost transport capacity in the unimodal salvage wood supply chain. Sustainable and resilient wood supply chain management can be achieved by increasing train and semitrailer truck wood transport as well as wood storage capacity and by improving both working conditions for self-loading log-truck drivers and cooperation between stakeholders.


  • Open Access

    Benchmarking Procurement Cost Saving Strategies for Wood Supply Chains

    by Christoph Kogler, Sophie Schimpfhuber, Clemens Eichberger, Peter Rauch

    Intense international competition pushes the actors of wood supply chains to implement efficient wood supply chain management incorporating coordinated cost-saving strategies to remain competitive. In order to observe the effects of individual and coordinated decision making, mixed-integer programming models for forestry, round-wood transport, and the wood-based industry were developed and integrated. The models deal with operational planning issues regarding production, harvest, and transport and are solved sequentially for individual cost optimization of each wood supply chain actor as well as simultaneously by a combined model representing joint cost optimization in an integrated wood supply chain. This allows for the first time, benchmarking relative cost-saving potential of the wood procurement strategies coordinated transports, integrated supply chains, satellite stockyards, and higher truck payloads within a single case study setting. Based on case study data from southern Austria, results show the advantages of an integrated supply chain with a cost-saving potential of up to 24%. Higher truck payloads reinforce this potential and enable up to 40% savings compared to the predominant wood procurement situation in Central Europe. Wood supply chain integration for Central European circumstances seems to be feasible only for a limited consortium of a few companies, for example when restricted to a wood-buying syndicate supplying several industry plants or a few large forest enterprises, especially as both groups are commonly steering wood transport on their own. Consequently, further research on the challenging task of implementing integrated supply chains using the opportunities of digitalization to realize existing cost savings potential by deepening cooperation and intensifying information exchange is needed.


  • Open Access

    Simulating Combined Self-Loading Truck and Semitrailer Truck Transport in the Wood Supply Chain

    by Christoph Kogler, Alexander Stenitzer, Peter Rauch

    Forestry faces frequent and severe natural calamities causing high amounts of salvage wood. Especially under mountainous conditions, regional available self-loading truck capacity is often the main limiting factor causing transport capacity bottlenecks. Therefore, innovative logistics strategies are needed to ensure quick transport of high amounts of salvage wood. Consequently, a multi-echelon unimodal transport concept, where timber is synchronously transshipped at a truck terminal with four transshipment lots from self-loading trucks to semitrailers, was modeled by means of a discrete event simulation. The simulation model calculates key performance indicators such as transshipped volumes and costs and support estimations of optimal truck fleet configuration. The results provide cost-optimal truck fleet configurations in terms of the number of self-loading trucks, semitrailers and prime mover trucks for varying transshipment volumes, delivery time to terminal and legal truck payload scenarios. Applying the truck terminal concept considerably decreases the number of self-loading trucks needed to transport the same volume when compared to unimodal wood transport, which is most common under mountainous conditions in Europe. In the majority of delivery time to terminal and terminal transshipment volume scenarios, the number of self-loading trucks was reduced by more than 50%. Increasing the legal gross vehicle weight for timber transport from 44 t up to 50 t reduces the number of self-loading trucks needed by 20% to 38%, depending on the scenario setting. Additionally, less self-loading trucks arriving at the terminal also cuts queuing times and system efficiency increases as transport cost/t is reduced by 6% to 11% depending on the scenario setting. Expanding the truck terminal concept by adding storage capacity as well as varying the number of transshipping lots and also including costs for terminal construction and operations in the economic analyses are promising topics for future studies.


  • Open Access

    Contingency Plans for the Wood Supply Chain Based on Bottleneck and Queuing Time Analyses of a Discrete Event Simulation

    by Christoph Kogler, Peter Rauch

    Wood supply chain performance suffers from risks intensified by more frequent and extreme natural calamities such as windstorms, bark beetle infestations, and ice-break treetops. In order to limit further damage and wood value loss after natural calamities, high volumes of salvage wood have to be rapidly transported out of the forest. In these cases, robust decision support and coordinated management strategies based on advanced contingency planning are needed. Consequently, this study introduces a contingency planning toolbox consisting of a discrete event simulation model setup for analyses on an operational level, strategies to cope with challenging business cases, as well as transport templates to analyze outcomes of decisions before real, costly, and long-lasting changes are made. The toolbox enables wood supply managers to develop contingency plans to prepare for increasing risk events and more frequent natural disturbances due to climate change. Crucial key performance indicators including truck to wagon ratios, truck and wagon utilization, worktime coordination, truck queuing times, terminal transhipment volume, and required stockyard are presented for varying delivery time, transport tonnage, and train pick-up scenarios. The strategy BEST FIT was proven to provide robust solutions which saves truck and train resources, as well as keeps transhipment volume on a high level and stockyard and queuing time on a low level. Permission granted for increased truck transport tonnages was evaluated as a potential means to reduce truck trips, if working times and train pick-ups are coordinated. Furthermore, the practical applicability for contingency planning is demonstrated by highly relevant business cases such as limited wagon or truck availability, defined delivery quota, terminal selection, queuing time reduction, or scheduled stock accumulation. Further research should focus on the modeling and management of log quality deterioration and the resulting wood value loss caused by challenging transport and storage conditions.