Yilin Yin
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Yilin Yin has a total of 22 co-authors. Here are the top co-authors by number of shared publications:
- Qing Lin
School of Management, Tianjin University of Technology, Tianjin, China
2 shared publications - Binchao Deng
School of Management, Tianjin University of Technology
1 shared publication - Hang Yin
Department of Construction Management, College of Management and Economics, Tianjin University, Tianjin 300072, China
1 shared publication - Hongbo Jiao
School of Management and Economics, North China University of Water Resources and Electric Power, Zhengzhou 450046, China
1 shared publication - Huimin Li
North China University of Water Resources and Electric Power
1 shared publication - Jun Cai
Guizhou Yunzhongzhu Technology Co., Ltd., Guiyang 550025, China
1 shared publication
Latest Publications
- Open Access
Mechanisms Underlying Organizational Resilience in the Context of Digital Transformation: Evidence from Construction Enterprises in China
Against the backdrop of the shift toward service-oriented business models, construction enterprises transition from traditional construction contractors to comprehensive service providers. This process is fraught with uncertainty, and as the environment grows increasingly complex, organizational resilience becomes a crucial capability for construction enterprises seeking to navigate the complex landscape. The existing research indicates that digital transformation is a crucial pathway in terms of enhancing organizational resilience. However, the underlying mechanisms through which digital transformation affects the organizational resilience of construction enterprises are yet to be systematically elucidated. The mediating role of digital capabilities and resource orchestration in this process also warrants further exploration. This paper focuses on construction enterprises and constructs the theoretical model of “digital transformation → digital capabilities/resource orchestration → organizational resilience.” This research combines structural equation modeling (SEM) with fuzzy set qualitative comparative analysis (fsQCA). It systematically investigates the mechanisms through which digital transformation affects the organizational resilience of construction enterprises, as well as the dual mediating pathways of digital capabilities and resource orchestration. The research results indicate that digital transformation has a significant positive impact on organizational resilience through the dual mediating pathways of digital capabilities and resource orchestration. What is more, through configuration analysis, it is found that the four combinations of conditions driving high organizational resilience in construction enterprises can be categorized as “analysis-driven,” “response-optimized,” “synergy-balanced”, and “resource-linked.” It reveals pathways for enhancing resilience in multi-faceted, concurrent situations. This study expands the “digital transformation–organizational resilience” research framework, which addresses the gaps in research on the coordination between competencies and behaviors in the context of construction enterprises. This paper also provides a theoretical basis and practical guidance for construction enterprises to effectively leverage digital transformation to enhance organizational resilience.
Open AccessMechanisms Underlying Organizational Resilience in the Context of Digital Transformation: Evidence from Construction Enterprises in China
Against the backdrop of the shift toward service-oriented business models, construction enterprises transition from traditional construction contractors to comprehensive service providers. This process is fraught with uncertainty, and as the environment grows increasingly complex, organizational resilience becomes a crucial capability for construction enterprises seeking to navigate the complex landscape. The existing research indicates that digital transformation is a crucial pathway in terms of enhancing organizational resilience. However, the underlying mechanisms through which digital transformation affects the organizational resilience of construction enterprises are yet to be systematically elucidated. The mediating role of digital capabilities and resource orchestration in this process also warrants further exploration. This paper focuses on construction enterprises and constructs the theoretical model of “digital transformation → digital capabilities/resource orchestration → organizational resilience.” This research combines structural equation modeling (SEM) with fuzzy set qualitative comparative analysis (fsQCA). It systematically investigates the mechanisms through which digital transformation affects the organizational resilience of construction enterprises, as well as the dual mediating pathways of digital capabilities and resource orchestration. The research results indicate that digital transformation has a significant positive impact on organizational resilience through the dual mediating pathways of digital capabilities and resource orchestration. What is more, through configuration analysis, it is found that the four combinations of conditions driving high organizational resilience in construction enterprises can be categorized as “analysis-driven,” “response-optimized,” “synergy-balanced”, and “resource-linked.” It reveals pathways for enhancing resilience in multi-faceted, concurrent situations. This study expands the “digital transformation–organizational resilience” research framework, which addresses the gaps in research on the coordination between competencies and behaviors in the context of construction enterprises. This paper also provides a theoretical basis and practical guidance for construction enterprises to effectively leverage digital transformation to enhance organizational resilience.
- Open Access
Solving the Two-Stage Design Interest Paradox Between Chinese EPC Project Owners and General Contractors: A Case Study
In recent years, China has vigorously promoted the EPC mode in the construction industry. However, under the weak trust environment of China’s construction industry, both owners and general contractors are involved in the design stage of EPC projects. Owing to conflicting interests in the design stage, there is a two-stage design interest paradox between the owners and general contractors of Chinese EPC projects, and this causes significant difficulties and challenges for project implementation. To resolve this paradox, this study proposes the “DART-PDCA” design management model by integrating value co-creation theory with the PDCA cycle. Applied to the Yuzhou High-speed Rail Station Square and Related Infrastructure PPP Project and the extended case, the model demonstrates how it resolves the paradox by (1) establishing structured dialogue platforms for aligning evolving design intentions, (2) enhancing information access and transparency through agreed protocols, and (3) facilitating dynamic risk assessment and allocation mechanisms. The results confirm that (1) the two-stage design interest paradox negatively impacts design management quality in China’s low-trust environment; and (2) the “DART-PDCA” design management model effectively resolves this paradox, leading to demonstrable improvements in design management quality, efficiency, and stakeholder alignment. This research forges novel interdisciplinary linkages among owner–general contractor relationships, design management, and EPC projects, providing critical insights into managing multi-organizational dynamics in complex EPC project environments.
Open AccessSolving the Two-Stage Design Interest Paradox Between Chinese EPC Project Owners and General Contractors: A Case Study
In recent years, China has vigorously promoted the EPC mode in the construction industry. However, under the weak trust environment of China’s construction industry, both owners and general contractors are involved in the design stage of EPC projects. Owing to conflicting interests in the design stage, there is a two-stage design interest paradox between the owners and general contractors of Chinese EPC projects, and this causes significant difficulties and challenges for project implementation. To resolve this paradox, this study proposes the “DART-PDCA” design management model by integrating value co-creation theory with the PDCA cycle. Applied to the Yuzhou High-speed Rail Station Square and Related Infrastructure PPP Project and the extended case, the model demonstrates how it resolves the paradox by (1) establishing structured dialogue platforms for aligning evolving design intentions, (2) enhancing information access and transparency through agreed protocols, and (3) facilitating dynamic risk assessment and allocation mechanisms. The results confirm that (1) the two-stage design interest paradox negatively impacts design management quality in China’s low-trust environment; and (2) the “DART-PDCA” design management model effectively resolves this paradox, leading to demonstrable improvements in design management quality, efficiency, and stakeholder alignment. This research forges novel interdisciplinary linkages among owner–general contractor relationships, design management, and EPC projects, providing critical insights into managing multi-organizational dynamics in complex EPC project environments.
- Open Access
- 13 March 2023
- Published by MDPI AG in Sustainability
- Vol. 15 (6) , 5067
A Quantitative and Qualitative Review of Blockchain Research from 2015 to 2021
Blockchain has the potential to reconfigure the contemporary economic, legal, political and cultural landscape, causing a flood of research on this topic. However, limited efforts have been made to conduct retrospective research to appraise the blockchain studies in the recent period, easily leading to a neglect of new technological trends. Consequently, the present research designs a quantitative- and qualitative-analysis procedure to review the latest research status. Adopting a four-step workflow, six research hotspots (i.e., the specific application areas of blockchain technology, the integration of blockchain and other technologies, the driving factors of blockchain, the values of blockchain technology, the types of blockchain and the core technologies of blockchain) and five research frontiers (i.e., entrepreneurship, contract, industrial internet, data management and distributed ledger technology) were detected using quantitative analysis. Furthermore, three other topics (i.e., the Internet of things, access control and trust) and two research gaps (i.e., the true effect of blockchain technology on firms’ operational efficiency and the regulation of the “dark sides” of blockchain technology) were also identified, using qualitative analysis. Finally, the evolutionary paths were qualitatively analyzed, and then three phases of blockchain research were summarized. The conclusions are able to provide a more comprehensive enlightenment regarding blockchain’s research hotspots, research frontiers, evolutionary paths and research gaps in the recent period, from 2015 to 2021, and to provide a reference for future research.
- 13 March 2023
- Published by MDPI AG in Sustainability
- Vol. 15 (6) , 5067
Open AccessA Quantitative and Qualitative Review of Blockchain Research from 2015 to 2021
Blockchain has the potential to reconfigure the contemporary economic, legal, political and cultural landscape, causing a flood of research on this topic. However, limited efforts have been made to conduct retrospective research to appraise the blockchain studies in the recent period, easily leading to a neglect of new technological trends. Consequently, the present research designs a quantitative- and qualitative-analysis procedure to review the latest research status. Adopting a four-step workflow, six research hotspots (i.e., the specific application areas of blockchain technology, the integration of blockchain and other technologies, the driving factors of blockchain, the values of blockchain technology, the types of blockchain and the core technologies of blockchain) and five research frontiers (i.e., entrepreneurship, contract, industrial internet, data management and distributed ledger technology) were detected using quantitative analysis. Furthermore, three other topics (i.e., the Internet of things, access control and trust) and two research gaps (i.e., the true effect of blockchain technology on firms’ operational efficiency and the regulation of the “dark sides” of blockchain technology) were also identified, using qualitative analysis. Finally, the evolutionary paths were qualitatively analyzed, and then three phases of blockchain research were summarized. The conclusions are able to provide a more comprehensive enlightenment regarding blockchain’s research hotspots, research frontiers, evolutionary paths and research gaps in the recent period, from 2015 to 2021, and to provide a reference for future research.
- Open Access
- 2 February 2023
- Published by Taylor & Francis in Journal of Asian Architecture and Building Engineering
- Vol. 22 (5) , 2946-2958
Trust or fairness is more important:research on the mechanism of contract risk allocation inducing contractor to consummate performance behavior
Contractor’s consummate performance behavior (CPB) is the key to achieve consummate performance. However, the mechanism of reasonable contract risk allocation incentives for Contractor’s CPB is unknown. The objective of this study is to reveal the effective ways to encourage contractor’s CPB by contract risk allocation based on the contract reference point theory and selecting the contractor’s trust perception and fair perception as mediating variables. Through an empirical analysis of the valid questionnaires collected, the results are as follows: (1) Although the economic benefits generated by reasonable contract risk allocation can induce contractor’s fair perception, fair perception has no mediating effect in the relationship between contract risk allocation and contractor’s CPB; (2) The cooperative value generated by reasonable contract risk allocation can induce contractor’s trust perception, and trust perception plays a part mediating role between contract risk allocation and contractor’s CPB. The findings also provide insights into how risk allocation facilitates contractor’s CPB in the construction industry.
- 2 February 2023
- Published by Taylor & Francis in Journal of Asian Architecture and Building Engineering
- Vol. 22 (5) , 2946-2958
Open AccessTrust or fairness is more important:research on the mechanism of contract risk allocation inducing contractor to consummate performance behavior
Contractor’s consummate performance behavior (CPB) is the key to achieve consummate performance. However, the mechanism of reasonable contract risk allocation incentives for Contractor’s CPB is unknown. The objective of this study is to reveal the effective ways to encourage contractor’s CPB by contract risk allocation based on the contract reference point theory and selecting the contractor’s trust perception and fair perception as mediating variables. Through an empirical analysis of the valid questionnaires collected, the results are as follows: (1) Although the economic benefits generated by reasonable contract risk allocation can induce contractor’s fair perception, fair perception has no mediating effect in the relationship between contract risk allocation and contractor’s CPB; (2) The cooperative value generated by reasonable contract risk allocation can induce contractor’s trust perception, and trust perception plays a part mediating role between contract risk allocation and contractor’s CPB. The findings also provide insights into how risk allocation facilitates contractor’s CPB in the construction industry.
- Open Access
Influence of Project Governance on Opportunistic Behavior: Taking a Dynamic Perspective
The importance of project governance in curbing opportunistic behavior (OB) has been clearly established in the project literature. Although contract governance and trust are considered critical factors that explain project governance, there is a lack of understanding regarding their interplay at various stages of project development. The current study takes a dynamic perspective and breaks down contract governance into contract completeness (CC) and contract enforcement (CE), while differentiating ex-ante trust from ex-post trust. As such, the current study takes a dynamic perspective and the Grossman-Hart-Moore (GHM) model, which aims to investigate how each of the two facets of contract governance and trust intertwine during the management of construction projects as well as their effects on OB. We undertook a questionnaire survey of individuals involved in 342 construction projects in China, and our research results show that, first of all, governance mechanisms at different stages have different inhibitory effects on OB. Taking contract-signing as the boundary, the governance effect of a contract is gradually enhanced, while the governance effect of trust is gradually reduced. Second, ex-ante trust is more important than ex-post trust: the former moderates not only the relationship between CE and OB, but also the influence of CC on OB. Finally, a contract that is overly complete is not conducive to precluding OB, as such completeness can give the contract parties a sense of security that is guaranteed. The current study not only garners insights into project governance research but also provides implications for architectural practitioners in deploying resources that relate to governance mechanisms.
Open AccessInfluence of Project Governance on Opportunistic Behavior: Taking a Dynamic Perspective
The importance of project governance in curbing opportunistic behavior (OB) has been clearly established in the project literature. Although contract governance and trust are considered critical factors that explain project governance, there is a lack of understanding regarding their interplay at various stages of project development. The current study takes a dynamic perspective and breaks down contract governance into contract completeness (CC) and contract enforcement (CE), while differentiating ex-ante trust from ex-post trust. As such, the current study takes a dynamic perspective and the Grossman-Hart-Moore (GHM) model, which aims to investigate how each of the two facets of contract governance and trust intertwine during the management of construction projects as well as their effects on OB. We undertook a questionnaire survey of individuals involved in 342 construction projects in China, and our research results show that, first of all, governance mechanisms at different stages have different inhibitory effects on OB. Taking contract-signing as the boundary, the governance effect of a contract is gradually enhanced, while the governance effect of trust is gradually reduced. Second, ex-ante trust is more important than ex-post trust: the former moderates not only the relationship between CE and OB, but also the influence of CC on OB. Finally, a contract that is overly complete is not conducive to precluding OB, as such completeness can give the contract parties a sense of security that is guaranteed. The current study not only garners insights into project governance research but also provides implications for architectural practitioners in deploying resources that relate to governance mechanisms.
- Open Access
Critical Obstacles in the Implementation of Value Management of Construction Projects
At present, the construction industry in China has problems such as low production efficiency, low technical efficiency, low management efficiency of the construction project, delayed delivery, budget overruns, and unreasonable risk allocation. Value management can address these issues by enhancing the value of construction projects in China, reducing construction costs, and ensuring significant investment returns. This study uses literature analysis to identify the critical obstacles to adopting value management and uses questionnaires and surveys, structural equation modeling, and factor analysis to prioritize the critical obstacles to adopting value management. What is more, the main contribution of this research is to identify the critical obstacles to the adoption of value management, which provides a new perspective for related research and has specific positive significance for practice summary and reform direction. The research was limited to the region of Tianjin and its surrounding cities. The critical survey respondents for this study are architects, quantity surveyors, contractors, civil engineers, and service engineers with rich experience in construction management. The research results show that the key obstacles to implementing value management in the construction industry in China are mainly divided into four categories: Environmental Factors; Stakeholder and Management Factors; Technological Factors; Information Factors. In addition, the researchers found that the level of the adoption of value management in the construction industry in China is deficient. Value management was not used in most of the organizations surveyed, and project teams did not practice its concept.
Open AccessCritical Obstacles in the Implementation of Value Management of Construction Projects
At present, the construction industry in China has problems such as low production efficiency, low technical efficiency, low management efficiency of the construction project, delayed delivery, budget overruns, and unreasonable risk allocation. Value management can address these issues by enhancing the value of construction projects in China, reducing construction costs, and ensuring significant investment returns. This study uses literature analysis to identify the critical obstacles to adopting value management and uses questionnaires and surveys, structural equation modeling, and factor analysis to prioritize the critical obstacles to adopting value management. What is more, the main contribution of this research is to identify the critical obstacles to the adoption of value management, which provides a new perspective for related research and has specific positive significance for practice summary and reform direction. The research was limited to the region of Tianjin and its surrounding cities. The critical survey respondents for this study are architects, quantity surveyors, contractors, civil engineers, and service engineers with rich experience in construction management. The research results show that the key obstacles to implementing value management in the construction industry in China are mainly divided into four categories: Environmental Factors; Stakeholder and Management Factors; Technological Factors; Information Factors. In addition, the researchers found that the level of the adoption of value management in the construction industry in China is deficient. Value management was not used in most of the organizations surveyed, and project teams did not practice its concept.
- Open Access
- 18 November 2020
- Published by MDPI AG in Sustainability
- Vol. 12 (22) , 9604
Impacts of Risk Allocation on Contractors’ Opportunistic Behavior: The Moderating Effect of Trust and Control
In construction projects, contractors often exhibit opportunistic behaviors, which harms the project performance, and risk allocation between clients and contractors affects the contractors’ opportunistic behaviors (strong and weak). In this study, a structural equation model was built to explore the impacts of risk allocation on opportunistic behavior and the moderating role of trust and control through an empirical test using a recovery questionnaire with 342 interviewees. The results show that the greater the risk contractors take, the stronger their opportunistic behavior is. Trust has a significant inhibitory effect on both strong and weak opportunistic behaviors caused by risk allocation, while control has a significant inhibitory effect only on strong opportunistic behavior caused by risk allocation. This study enriches the research on the governance mechanism and construction management of opportunistic behaviors and provides management suggestions for risk allocation and control measures of such behaviors.
- 18 November 2020
- Published by MDPI AG in Sustainability
- Vol. 12 (22) , 9604
Open AccessImpacts of Risk Allocation on Contractors’ Opportunistic Behavior: The Moderating Effect of Trust and Control
In construction projects, contractors often exhibit opportunistic behaviors, which harms the project performance, and risk allocation between clients and contractors affects the contractors’ opportunistic behaviors (strong and weak). In this study, a structural equation model was built to explore the impacts of risk allocation on opportunistic behavior and the moderating role of trust and control through an empirical test using a recovery questionnaire with 342 interviewees. The results show that the greater the risk contractors take, the stronger their opportunistic behavior is. Trust has a significant inhibitory effect on both strong and weak opportunistic behaviors caused by risk allocation, while control has a significant inhibitory effect only on strong opportunistic behavior caused by risk allocation. This study enriches the research on the governance mechanism and construction management of opportunistic behaviors and provides management suggestions for risk allocation and control measures of such behaviors.
- 1 January 2016
- Published by EJournal Publishing in International Journal of Innovation, Management and Technology
- Vol. 7 (2) , 36-40
Program Pull Management Mechanism Based on Benefits Management Theory
- 1 January 2016
- Published by EJournal Publishing in International Journal of Innovation, Management and Technology
- Vol. 7 (2) , 36-40
Program Pull Management Mechanism Based on Benefits Management Theory