Li Longji
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Li Longji has a total of 25 co-authors. Here are the top co-authors by number of shared publications:
Chun He
Electric Power Research Institute, State Grid Tianjin Electric Power Corporation,Tianjin,China
1 shared publicationFang Jing
State Grid Tianjin Electric Power Company,Equipment management department,Tianjin,China
1 shared publication- Fanghui Yin
Tsinghua University
1 shared publication Guo Hao
State Grid Tianjin Electric Power Company,Equipment management department,Tianjin,China
1 shared publicationGuo Wei
State Grid Tianjin Electric Power Research Institute,Equipment States Evaluation Center,Tianjin,China
1 shared publication- Guoyong Zhang
National Key Laboratory of Science and Technology on Communications, University of Electronic Science and Technology of China, Chengdu, China
1 shared publication
Latest Publications
- 21 September 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Analysis of Multiple Discharges Complex Insulator Flashover in 35kV Overhead-Cable Hybrid Transmission Line Tower
This paper Analyzes the multiple discharge complex insulator fault in 35kV overhead-cable hybrid transmission line tower. The foreign object overlapping the cable lead caused an AC phase short circuit in this fault, followed by an ABC three-phase short circuit and grounding. Due to the air breakdown caused by the phase short circuit, an arc was generated, and the free gas caused the insulator to flash over (at a small creepage distance of the insulator).
- 21 September 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Analysis of Multiple Discharges Complex Insulator Flashover in 35kV Overhead-Cable Hybrid Transmission Line Tower
This paper Analyzes the multiple discharge complex insulator fault in 35kV overhead-cable hybrid transmission line tower. The foreign object overlapping the cable lead caused an AC phase short circuit in this fault, followed by an ABC three-phase short circuit and grounding. Due to the air breakdown caused by the phase short circuit, an arc was generated, and the free gas caused the insulator to flash over (at a small creepage distance of the insulator).
- 22 October 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 3421-3424
Technical Requirements for Autonomous Point Cloud Collection and Autonomous Inspection of Unmanned Aerial Vehicle
With the rapid growth of grid load, the length of transmission lines is increasing year by year. The contradiction between the increase in overhead transmission line operation and maintenance workload and the shortage of personnel has become increasingly prominent. UAV autonomous inspections are more and more widely used in transmission line inspections. However, the current point cloud collection of traditional UAVs has the problems of long collection period and low quality. In this paper, through the combination of front-end vision algorithm and autonomous flight technology, the whole process of unmanned aerial vehicle point cloud acquisition is realized. It also introduced the UAV inspection content and clarified the relevant technical requirements for UAV inspection shooting and storage. The operation process and method of drone inspection have been standardized. This can improve the efficiency of drone inspections. And it helps to improve the intrinsic safety level of the line.
- 22 October 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 3421-3424
Technical Requirements for Autonomous Point Cloud Collection and Autonomous Inspection of Unmanned Aerial Vehicle
With the rapid growth of grid load, the length of transmission lines is increasing year by year. The contradiction between the increase in overhead transmission line operation and maintenance workload and the shortage of personnel has become increasingly prominent. UAV autonomous inspections are more and more widely used in transmission line inspections. However, the current point cloud collection of traditional UAVs has the problems of long collection period and low quality. In this paper, through the combination of front-end vision algorithm and autonomous flight technology, the whole process of unmanned aerial vehicle point cloud acquisition is realized. It also introduced the UAV inspection content and clarified the relevant technical requirements for UAV inspection shooting and storage. The operation process and method of drone inspection have been standardized. This can improve the efficiency of drone inspections. And it helps to improve the intrinsic safety level of the line.
- 7 April 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 505-510
Meteorological Analysis of Icing and Galloping of Transmission Lines in Tianjin around Bohai Sea
This paper shown meteorological analysis of icing and galloping of transmission lines in Tianjin around Bohai Sea. Tianjin experienced a wide range of rain, snow and freezing weather. Affected by the cold wave and blizzard, the line dance trip occurred in some areas of Tianjin (including the dual power supply of Sinopec Tianjin LNG). The main time period of the fault is mainly distributed in the coastal areas of southeast Tianjin, involving Binhai, Dongli, and Jinnan. Based on the actual situation in Tianjin, we analyze the weather process, dancing conditions, equipment failures, and exposure issues respectively. It includes icing and galloping’s weather process analysis, analysis of galloping, equipment fault analysis and analysis of dancing characteristics.
- 7 April 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 505-510
Meteorological Analysis of Icing and Galloping of Transmission Lines in Tianjin around Bohai Sea
This paper shown meteorological analysis of icing and galloping of transmission lines in Tianjin around Bohai Sea. Tianjin experienced a wide range of rain, snow and freezing weather. Affected by the cold wave and blizzard, the line dance trip occurred in some areas of Tianjin (including the dual power supply of Sinopec Tianjin LNG). The main time period of the fault is mainly distributed in the coastal areas of southeast Tianjin, involving Binhai, Dongli, and Jinnan. Based on the actual situation in Tianjin, we analyze the weather process, dancing conditions, equipment failures, and exposure issues respectively. It includes icing and galloping’s weather process analysis, analysis of galloping, equipment fault analysis and analysis of dancing characteristics.
- Open Access
- 5 March 2019
- Published by MDPI AG in Applied Sciences
- Vol. 9 (5) , 930
Wet Snow Flashover Characteristics of 500-kV AC Insulator Strings with Different Arrangements
In order to study the wet snow flashover characteristics of 500-kV AC insulator strings under different arrangements, wet snow flashover tests were carried out in the large climate chamber of China Electric Power Research Institute (CEPRI). The wet snow flashover voltages were obtained by the even-rising method and the flashovers were filmed by a camera. The test results showed that the installation of an anti-icing shed of large diameter could increase the wet snow flashover voltage. The distance between the two insulators was a key parameter that influenced the discharge process and the flashover voltage. Under Λ-string arrangement, for common insulators, the flashover performance of iced insulators increased with the connection angle; for anti-icing insulators, the flashover performance increased at first and then decreased with the connection angle. In wet snow conditions, when the connection angle was at the commonly adopted angle of 60°, the flashover performance of the common insulators under the V-string and Λ-string arrangements was almost the same. For anti-icing insulators, however, the V-string arrangement was recommended according to the tests. The results obtained in this study can provide a reference for external insulation design in wet snow conditions.
- 5 March 2019
- Published by MDPI AG in Applied Sciences
- Vol. 9 (5) , 930
Open AccessWet Snow Flashover Characteristics of 500-kV AC Insulator Strings with Different Arrangements
In order to study the wet snow flashover characteristics of 500-kV AC insulator strings under different arrangements, wet snow flashover tests were carried out in the large climate chamber of China Electric Power Research Institute (CEPRI). The wet snow flashover voltages were obtained by the even-rising method and the flashovers were filmed by a camera. The test results showed that the installation of an anti-icing shed of large diameter could increase the wet snow flashover voltage. The distance between the two insulators was a key parameter that influenced the discharge process and the flashover voltage. Under Λ-string arrangement, for common insulators, the flashover performance of iced insulators increased with the connection angle; for anti-icing insulators, the flashover performance increased at first and then decreased with the connection angle. In wet snow conditions, when the connection angle was at the commonly adopted angle of 60°, the flashover performance of the common insulators under the V-string and Λ-string arrangements was almost the same. For anti-icing insulators, however, the V-string arrangement was recommended according to the tests. The results obtained in this study can provide a reference for external insulation design in wet snow conditions.