Ming Lu
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Ming Lu has a total of 73 co-authors. Here are the top co-authors by number of shared publications:
- Monjurul Hasan
Program Engineer, Transportation and Economic Corridors, Government of Alberta, Twin Atria Bldg., 4999 98 Ave. NW, Edmonton, AB, Canada T6B 2X3. ORCID:
9 shared publications - Simaan AbouRizk
Univ. of Alberta
7 shared publications Xuesong Shen
Lecturer, School of Civil and Environmental Engineering, Univ. of New South Wales, 212, Civil Engineering Building, Sydney, NSW 2052, Australia
5 shared publications- Ming-Fung Francis Siu
Ph.D. Candidate, Construction Engineering and Management, Dept. of Civil and Environmental Engineering, Univ. of Alberta, 116 St., 85 Ave., Edmonton, AB, Canada T6G 2R3
4 shared publications - Serhii Naumets
University of Alberta Department of Civil and Environmental Engineering
4 shared publications - Chi Sun Poon
Department of Civil and Environmental Engineering, The Hong Kong Polytechnic University, Kowloon, Hong Kong
3 shared publications
Latest Publications
- 24 September 2026
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- p. 1-28
Simulation-based approach to quantify the impact of stochastic time-window constraints on construction schedules and budgets for remote cold regions
Purpose: This study addresses the planning and scheduling challenges of construction projects in environments with strict climate-induced time constraints, such as winter road availability and temperature-dependent work windows. The research focuses on assessing risks to project timelines and budgets by analyzing historical meteorological and winter road data to model uncertainties in the start and end dates of these critical time windows. Design/methodology/approach: The project schedule is developed based on technological and precedence relationships, while adhering to environmental constraints. Risks are evaluated solely in terms of time-window variability, excluding other uncertainties such as crew productivity or activity duration changes. Deterministic project baselines are established using averaged historical data for time-window boundaries as the base case. A Monte Carlo simulation then samples open and close dates from fitted probability distributions to quantify schedule and budget risks relative to this baseline. Findings: Monte Carlo simulation of stochastic winter-road and thawing time windows for the Northwest Territories bridge case study shows an 84.78% probability of completing the project within the 654-day target schedule and a 21.08% probability of staying under the $28.5 million target budget. The joint probability of meeting both targets is 20.72%. Shorter winter-road windows at project start substantially increase total costs, demonstrating that climate variability significantly affects sequencing, resource allocation and overall project risk in remote cold regions. Originality/value: This research introduces a novel simulation-based framework for quantifying climate-related risks in cold-region construction, extending prior time-window methods with stochastic modelling. It offers a foundational risk-informed approach, with the potential to incorporate additional uncertainties like productivity fluctuations or alternative methods in future studies.
- 24 September 2026
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- p. 1-28
Simulation-based approach to quantify the impact of stochastic time-window constraints on construction schedules and budgets for remote cold regions
Purpose: This study addresses the planning and scheduling challenges of construction projects in environments with strict climate-induced time constraints, such as winter road availability and temperature-dependent work windows. The research focuses on assessing risks to project timelines and budgets by analyzing historical meteorological and winter road data to model uncertainties in the start and end dates of these critical time windows. Design/methodology/approach: The project schedule is developed based on technological and precedence relationships, while adhering to environmental constraints. Risks are evaluated solely in terms of time-window variability, excluding other uncertainties such as crew productivity or activity duration changes. Deterministic project baselines are established using averaged historical data for time-window boundaries as the base case. A Monte Carlo simulation then samples open and close dates from fitted probability distributions to quantify schedule and budget risks relative to this baseline. Findings: Monte Carlo simulation of stochastic winter-road and thawing time windows for the Northwest Territories bridge case study shows an 84.78% probability of completing the project within the 654-day target schedule and a 21.08% probability of staying under the $28.5 million target budget. The joint probability of meeting both targets is 20.72%. Shorter winter-road windows at project start substantially increase total costs, demonstrating that climate variability significantly affects sequencing, resource allocation and overall project risk in remote cold regions. Originality/value: This research introduces a novel simulation-based framework for quantifying climate-related risks in cold-region construction, extending prior time-window methods with stochastic modelling. It offers a foundational risk-informed approach, with the potential to incorporate additional uncertainties like productivity fluctuations or alternative methods in future studies.
- 1 July 2026
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 152 (7) , 04026100
A Data-Driven Framework for Quantifying Physical Workload in Construction Using Posture-Hour Metrics
Established construction workload metrics fail to integrate workers’ physical postures, leading to inaccurate assessments of both ergonomic risk and productivity. To address this gap, this ...
- 1 July 2026
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 152 (7) , 04026100
A Data-Driven Framework for Quantifying Physical Workload in Construction Using Posture-Hour Metrics
Established construction workload metrics fail to integrate workers’ physical postures, leading to inaccurate assessments of both ergonomic risk and productivity. To address this gap, this ...
- Open Access
- 2 December 2025
- Published by Elsevier in Computer-Aided Civil and Infrastructure Engineering
- Vol. 40 (31) , 6678-6700
Time–cost combined optimization in planning infrastructure construction projects under environment induced time‐window constraints
- 2 December 2025
- Published by Elsevier in Computer-Aided Civil and Infrastructure Engineering
- Vol. 40 (31) , 6678-6700
Open AccessTime–cost combined optimization in planning infrastructure construction projects under environment induced time‐window constraints
- Open Access
- 8 September 2025
- Published by Springer Nature in AI in Civil Engineering
- Vol. 4 (1) , 1-18
Bridging AI and explainability in civil engineering: the Yin-Yang of predictive power and interpretability
Civil engineering relies on data from experiments or simulations to calibrate models that approximate system behaviors. This paper examines machine learning (ML) algorithms for AI-driven decision support in civil engineering, specifically construction engineering and management, where complex input–output relationships demand both predictive accuracy and interpretability. Explainable AI (XAI) is critical for safety and compliance-sensitive applications, ensuring transparency in AI decisions. The literature review identifies key XAI evaluation attributes—model type, explainability, perspective, and interpretability and assesses the Enhanced Model Tree (EMT), a novel method demonstrating strong potential for civil engineering applications compared to commonly applied ML algorithms. The study highlights the need to balance AI’s predictive power with XAI’s transparency, akin to the Yin–Yang philosophy: AI advances in efficiency and optimization, while XAI provides logical reasoning behind conclusions. Drawing on insights from the literature, the study proposes a tailored XAI assessment framework addressing civil engineering's unique needs—problem context, data constraints, and model explainability. By formalizing this synergy, the research fosters trust in AI systems, enabling safer and more socially responsible outcomes. The findings underscore XAI’s role in bridging the gap between complex AI models and end-user accountability, ensuring AI’s full potential is realized in the field.
- 8 September 2025
- Published by Springer Nature in AI in Civil Engineering
- Vol. 4 (1) , 1-18
Open AccessBridging AI and explainability in civil engineering: the Yin-Yang of predictive power and interpretability
Civil engineering relies on data from experiments or simulations to calibrate models that approximate system behaviors. This paper examines machine learning (ML) algorithms for AI-driven decision support in civil engineering, specifically construction engineering and management, where complex input–output relationships demand both predictive accuracy and interpretability. Explainable AI (XAI) is critical for safety and compliance-sensitive applications, ensuring transparency in AI decisions. The literature review identifies key XAI evaluation attributes—model type, explainability, perspective, and interpretability and assesses the Enhanced Model Tree (EMT), a novel method demonstrating strong potential for civil engineering applications compared to commonly applied ML algorithms. The study highlights the need to balance AI’s predictive power with XAI’s transparency, akin to the Yin–Yang philosophy: AI advances in efficiency and optimization, while XAI provides logical reasoning behind conclusions. Drawing on insights from the literature, the study proposes a tailored XAI assessment framework addressing civil engineering's unique needs—problem context, data constraints, and model explainability. By formalizing this synergy, the research fosters trust in AI systems, enabling safer and more socially responsible outcomes. The findings underscore XAI’s role in bridging the gap between complex AI models and end-user accountability, ensuring AI’s full potential is realized in the field.
- 30 March 2025
- Published by Springer Nature
- p. 640-651
Automated Stakeout Survey for Efficient Earthwork Construction Project Control
- 30 March 2025
- Published by Springer Nature
- p. 640-651
Automated Stakeout Survey for Efficient Earthwork Construction Project Control
- 18 September 2024
- Published by Springer Nature
- p. 315-327
Roadway Construction Planning Subject to Work Zone Safety: Status Review
- 18 September 2024
- Published by Springer Nature
- p. 315-327
Roadway Construction Planning Subject to Work Zone Safety: Status Review
- Open Access
- 17 September 2024
- Published by Vilnius Gediminas Technical University in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
- Vol. 30 (8) , 708-719
Planning municipal drainage infrastructure maintenance operations with finite available crews: pragmatic optimization approach
This paper proposes a streamlined approach to addressing the problem of allocating finite crew resources to concurrent jobs in the context of municipal drainage infrastructure maintenance. The problem was defined from the perspective of a project manager involved in planning such operations on a day-by-day basis. The problem statement was then transformed into a simplified Integer Linear Programming optimization model. Performance metrics were devised to evaluate the optimization model’s effectiveness. A heuristic algorithm representing the decision-making process by a seasoned planner in the partner company was also developed. Both methods were applied to a case study and contrasted based on the same performance metrics. The findings underscored substantial optimization benefits in rendering decision support in resource-constrained drainage construction operations planning. In conclusion, this research presents an alternative strategy for navigating the complexities inherent in finite crew resource allocation on multiple concurrent drainage projects; lends a cost-effective optimization solution to improving the utilization of finite available crews while satisfying service demands from multiple clients to the largest extent possible.
- 17 September 2024
- Published by Vilnius Gediminas Technical University in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
- Vol. 30 (8) , 708-719
Open AccessPlanning municipal drainage infrastructure maintenance operations with finite available crews: pragmatic optimization approach
This paper proposes a streamlined approach to addressing the problem of allocating finite crew resources to concurrent jobs in the context of municipal drainage infrastructure maintenance. The problem was defined from the perspective of a project manager involved in planning such operations on a day-by-day basis. The problem statement was then transformed into a simplified Integer Linear Programming optimization model. Performance metrics were devised to evaluate the optimization model’s effectiveness. A heuristic algorithm representing the decision-making process by a seasoned planner in the partner company was also developed. Both methods were applied to a case study and contrasted based on the same performance metrics. The findings underscored substantial optimization benefits in rendering decision support in resource-constrained drainage construction operations planning. In conclusion, this research presents an alternative strategy for navigating the complexities inherent in finite crew resource allocation on multiple concurrent drainage projects; lends a cost-effective optimization solution to improving the utilization of finite available crews while satisfying service demands from multiple clients to the largest extent possible.
- 2 December 2023
- Published by Elsevier in Automation in Construction
- Vol. 158
Enhanced model tree for quantifying output variances due to random data sampling: Productivity prediction applications
- 2 December 2023
- Published by Elsevier in Automation in Construction
- Vol. 158
Enhanced model tree for quantifying output variances due to random data sampling: Productivity prediction applications