Makoto Matsukawa
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Makoto Matsukawa has a total of 8 co-authors. Here are the top co-authors by number of shared publications:
- Alessandro Lampasi
ENEA and DTT S. c. a r. l., Frascati, Italy
1 shared publication - Antti Jokinen
Fusion for Energy (F4E), Boltzmannstrasse 2, 85748 Garching, Germany
1 shared publication - Filippo Burini
OCEM Power Electronics, Via della Solidarietà, 2/1/Località Crespellano, Valsamoggia, 40056 Bologna, Italy
1 shared publication - Giuseppe Taddia
OCEM Power Electronics, Valsamoggia, Italy
1 shared publication - Katsuhiro Shimada
National Institutes for Quantum and Radiological Science and Technology (QST), Mukoyama 801-1, Naka-shi 311-0193, Ibaraki-ken, Japan
1 shared publication - Luca Novello
Fusion for Energy (F4E), Boltzmannstrasse 2, 85748 Garching, Germany
1 shared publication
Latest Publications
- Open Access
Installation, Commissioning and Tests of Four Fast Switching Units of up to 20 kA for the JT-60SA Nuclear Fusion Experiment
The nuclear fusion project JT-60SA is presently under construction in Naka (Japan) as a joint collaboration between Europe and Japan, within the framework of the Broader Approach Agreement. According to such agreement, the various JT-60SA systems are supplied by European and Japanese institutions. In particular, the Italian Agency ENEA was in charge for the procurement of the four Switching Network Units (SNUs) for the JT-60SA Central Solenoid (CS). The main SNU function is to interrupt a DC current up to 20 kA in a short time (less than 1 ms) in order to produce an overvoltage of up to 5 kV, crucial to generate and sustain the fusion plasma. The SNU design, manufacturing and factory test activities have been completed in 2016. After the delivery in Naka, the four SNUs have been installed and successfully commissioned in 2017. After an overview on the main technical characteristics of the SNUs and the key aspects of their design, this paper describes the activities performed on-site, highlighting the results obtained during the final acceptance tests and comparing them with the design simulation and the factory test results.
Open AccessInstallation, Commissioning and Tests of Four Fast Switching Units of up to 20 kA for the JT-60SA Nuclear Fusion Experiment
The nuclear fusion project JT-60SA is presently under construction in Naka (Japan) as a joint collaboration between Europe and Japan, within the framework of the Broader Approach Agreement. According to such agreement, the various JT-60SA systems are supplied by European and Japanese institutions. In particular, the Italian Agency ENEA was in charge for the procurement of the four Switching Network Units (SNUs) for the JT-60SA Central Solenoid (CS). The main SNU function is to interrupt a DC current up to 20 kA in a short time (less than 1 ms) in order to produce an overvoltage of up to 5 kV, crucial to generate and sustain the fusion plasma. The SNU design, manufacturing and factory test activities have been completed in 2016. After the delivery in Naka, the four SNUs have been installed and successfully commissioned in 2017. After an overview on the main technical characteristics of the SNUs and the key aspects of their design, this paper describes the activities performed on-site, highlighting the results obtained during the final acceptance tests and comparing them with the design simulation and the factory test results.