I Nyoman Setiawan
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
I Nyoman Setiawan has a total of 11 co-authors. Here are the top co-authors by number of shared publications:
- I Nyoman Satya Kumara
Universitas Udayana, Indonesia
2 shared publications - I Wayan Sukerayasa
Dosen Program Studi Teknik Elektro Fakultas Teknik Universitas Udayana Jl Raya Kampus Unud Jimbaran Kec. Kuta Sel Kabupaten Badung 80361 Bali
2 shared publications - Wayan Gede Ariastina
Electrical Engineering Udayana University, Jl. Kampus Bukit Jimbaran-Bali
2 shared publications - Dwi Giriantari
Dosen Program Studi Teknik Elektro Fakultas Teknik Universitas Udayana Jl. Raya Kampus Unud No .88 Jimbaran Kec. Kuta Sel. Kabupaten Badung sebesar 80361 604 929kWh Bali
1 shared publication - Gede Agus Wira Dharma
Mahasiswa Program Studi Teknik Elektro Fakultas Teknik Universitas Udayana
1 shared publication - Gede Purna Suartawan1 shared publication
Latest Publications
- Open Access
- 31 December 2024
- Published by Universitas Udayana in Jurnal SPEKTRUM
- Vol. 11 (4) , 83-94
PERANCANGAN PLTS SEBAGAI SUPLAI DAYA POMPA AIR TEMEGA PERUMDA TIRTA TOHLANGKIR KECAMATAN KARANGASEM
This research discusses the design of Solar Power Plant (PLTS) as a power supply for Temega water pump Perumda Tirta Tohlangkir Karangasem District, Bali. The Temega waterpump currently uses 11 kW of electrical power with high operational costs so that the PLTS isdesigned to reduce dependence on PLN electricity and reduce operational costs. This researchfocuses on the results of simulation analysis of scenarios 1, 2, and 3 using PVSyst software.Simulation scenario 1 uses 48 solar modules (16 in series and 3 in parallel) to meet the dailyenergy demand of 26.64 kWp pump. Scenario 2 simulation uses 30 solar modules (15 in seriesand 2 in parallel) to meet the daily energy demand of 16.65 kWp pumps. Simulation scenario 3uses 26 solar modules (13 in series and 2 in parallel) to meet the daily energy needs of the pumpof 14.43 kWp. The results show that scenario one simulation produces the highest energy butcauses an energy surplus, while scenarios two and three are more efficient in minimizing wastedenergy, which is 0 kWh/year.
- 31 December 2024
- Published by Universitas Udayana in Jurnal SPEKTRUM
- Vol. 11 (4) , 83-94
Open AccessPERANCANGAN PLTS SEBAGAI SUPLAI DAYA POMPA AIR TEMEGA PERUMDA TIRTA TOHLANGKIR KECAMATAN KARANGASEM
This research discusses the design of Solar Power Plant (PLTS) as a power supply for Temega water pump Perumda Tirta Tohlangkir Karangasem District, Bali. The Temega waterpump currently uses 11 kW of electrical power with high operational costs so that the PLTS isdesigned to reduce dependence on PLN electricity and reduce operational costs. This researchfocuses on the results of simulation analysis of scenarios 1, 2, and 3 using PVSyst software.Simulation scenario 1 uses 48 solar modules (16 in series and 3 in parallel) to meet the dailyenergy demand of 26.64 kWp pump. Scenario 2 simulation uses 30 solar modules (15 in seriesand 2 in parallel) to meet the daily energy demand of 16.65 kWp pumps. Simulation scenario 3uses 26 solar modules (13 in series and 2 in parallel) to meet the daily energy needs of the pumpof 14.43 kWp. The results show that scenario one simulation produces the highest energy butcauses an energy surplus, while scenarios two and three are more efficient in minimizing wastedenergy, which is 0 kWh/year.
- Open Access
- 30 June 2024
- Published by Universitas Udayana in Jurnal SPEKTRUM
- Vol. 11 (2) , 11-20
PERANCANGAN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) PADA ATAP GEDUNG PARKIR BANDAR UDARA INTERNASIONAL I GUSTI NGURAH RAI
Using sustainable energy as a source of electrical energy is a safe way to increase ecosystem energy. One of them is the utilization of photovoltaic directed energy by upgrading the PLTS on top of the structure as a mechanism for introducing photovoltaic modules. The study finalized the plan to install PLTS on the roof of the I Gusti Ngurah Rai Airport parking lot as a source of electrical energy to reduce PLN electricity bills. The I Gusti Ngurah Rai Airport Parking Roof Solar Power Plant uses a battery-free on gridsystem with 600 units of 555Wp monocrystalline solar-based modules and four 100kW inverter units. The solar power plant to be built on the car park of Terminal I Gusti Ngurah Rai will have a capacity of 333kWp and will produce 604.929kWh of energy annually. The required speculation cost is Rp 3.004.620.000 and payback period for 6 years.
- 30 June 2024
- Published by Universitas Udayana in Jurnal SPEKTRUM
- Vol. 11 (2) , 11-20
Open AccessPERANCANGAN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) PADA ATAP GEDUNG PARKIR BANDAR UDARA INTERNASIONAL I GUSTI NGURAH RAI
Using sustainable energy as a source of electrical energy is a safe way to increase ecosystem energy. One of them is the utilization of photovoltaic directed energy by upgrading the PLTS on top of the structure as a mechanism for introducing photovoltaic modules. The study finalized the plan to install PLTS on the roof of the I Gusti Ngurah Rai Airport parking lot as a source of electrical energy to reduce PLN electricity bills. The I Gusti Ngurah Rai Airport Parking Roof Solar Power Plant uses a battery-free on gridsystem with 600 units of 555Wp monocrystalline solar-based modules and four 100kW inverter units. The solar power plant to be built on the car park of Terminal I Gusti Ngurah Rai will have a capacity of 333kWp and will produce 604.929kWh of energy annually. The required speculation cost is Rp 3.004.620.000 and payback period for 6 years.
- Open Access
- 31 March 2024
- Published by Universitas Udayana in Jurnal SPEKTRUM
- Vol. 11 (1) , 188-196
PERANCANGAN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) PADA ATAP GEDUNG WISTI SABHA BANDAR UDARA INTERNASIONAL I GUSTI NGURAH RAI
The installed PLTS capacity in Bali is currently still 3.44% of the target given by the General National Energy Plan (RUEN) of 108 MWp in 2025. The island of Bali has limited land availability so rooftop PLTS is a solution. The design of the rooftop PLTS was carried out on the roof of the Wisti Sabha Building at I Gusti Ngurah Rai International Airport. The research uses PVSyst simulation software while the investment feasibility method uses the Benefit-Cost Ratio (BCR), Net Present Value and discounted payback period (DPP) methods. Based on the simulation results, the rooftop PLTS capacity is 56.6 kWp with energy production of 98,009 kWh/year. The B-CR value obtained is 2.23, the net present value is IDR 707,436,838.55 and the DPP is 7 years, with a rooftop solar system life of 25 years.
- 31 March 2024
- Published by Universitas Udayana in Jurnal SPEKTRUM
- Vol. 11 (1) , 188-196
Open AccessPERANCANGAN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) PADA ATAP GEDUNG WISTI SABHA BANDAR UDARA INTERNASIONAL I GUSTI NGURAH RAI
The installed PLTS capacity in Bali is currently still 3.44% of the target given by the General National Energy Plan (RUEN) of 108 MWp in 2025. The island of Bali has limited land availability so rooftop PLTS is a solution. The design of the rooftop PLTS was carried out on the roof of the Wisti Sabha Building at I Gusti Ngurah Rai International Airport. The research uses PVSyst simulation software while the investment feasibility method uses the Benefit-Cost Ratio (BCR), Net Present Value and discounted payback period (DPP) methods. Based on the simulation results, the rooftop PLTS capacity is 56.6 kWp with energy production of 98,009 kWh/year. The B-CR value obtained is 2.23, the net present value is IDR 707,436,838.55 and the DPP is 7 years, with a rooftop solar system life of 25 years.
- Open Access
- 30 June 2023
- Published by Universitas Udayana in Jurnal SPEKTRUM
- Vol. 10 (2) , 70-81
ANALISIS UNJUK KERJA PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) ATAP ON-GRID 463,25 kWp DI PERUSAHAAN FARMASI PADA KAWASAN PT JAKARTA INDUSTRIAL ESTATE PULOGADUNG, JAKARTA TIMUR
The number of PLTS installed on factory rooftops is growing. In Indonesia, the Directorate General of New, Renewable Energy estimates a total renewable energy potential of 442 GW, with solar energy holding the greatest potential. The performance of the PLTS system needs to be considered to ensure good performance in generating electricity. This research focuses on the rooftop on-grid PLTS system in a Pharmaceutical Company located in the PT Jakarta Industrial Estate Pulo Gadung area, with a capacity of 463.25 kWp. Electricity generation potential is modeled using PVSyst software for examination of the PLTS system's performance. For the period of one year, from November 2021 through October 2022, the PLTS system's performance characteristics are determined. These include the Yield Factor (Yf), Reference Yield (Yr), Performance Ratio (PR), and Capacity Utilization Factor (CUF). According to the model, the 463.25 kWp on-grid rooftop PLTS system may generate up to 629,550 kWh of power each year. The values of the PLTS system performance parameters are as follows: Yield Factor (Yf) is 1,358.99 kWh/kWp, Reference Yield (Yr) is 1,730.6 kWh/kW, Performance Ratio (PR) is 78.56%, and Capacity Utilization Factor (CUF) is 15.73%. Meanwhile, the actual electricity production for one year is 570,724.82 kWh, with the following performance parameters for the PLTS system: Yield Factor (Yf) is 1,232 kWh/kWp, Reference Yield (Yr) is 1,642.85 kWh/kW, Performance Ratio (PR) is 76.12%, and Capacity Utilization Factor (CUF) is 14.26%. There is a difference between the PVSyst software simulation and the actual results, which are 58,825.18 kWh, 126.98 kWh/kWp, 87.75 kWh/kW, 2.44%, and 1.47% respectively.
- 30 June 2023
- Published by Universitas Udayana in Jurnal SPEKTRUM
- Vol. 10 (2) , 70-81
Open AccessANALISIS UNJUK KERJA PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) ATAP ON-GRID 463,25 kWp DI PERUSAHAAN FARMASI PADA KAWASAN PT JAKARTA INDUSTRIAL ESTATE PULOGADUNG, JAKARTA TIMUR
The number of PLTS installed on factory rooftops is growing. In Indonesia, the Directorate General of New, Renewable Energy estimates a total renewable energy potential of 442 GW, with solar energy holding the greatest potential. The performance of the PLTS system needs to be considered to ensure good performance in generating electricity. This research focuses on the rooftop on-grid PLTS system in a Pharmaceutical Company located in the PT Jakarta Industrial Estate Pulo Gadung area, with a capacity of 463.25 kWp. Electricity generation potential is modeled using PVSyst software for examination of the PLTS system's performance. For the period of one year, from November 2021 through October 2022, the PLTS system's performance characteristics are determined. These include the Yield Factor (Yf), Reference Yield (Yr), Performance Ratio (PR), and Capacity Utilization Factor (CUF). According to the model, the 463.25 kWp on-grid rooftop PLTS system may generate up to 629,550 kWh of power each year. The values of the PLTS system performance parameters are as follows: Yield Factor (Yf) is 1,358.99 kWh/kWp, Reference Yield (Yr) is 1,730.6 kWh/kW, Performance Ratio (PR) is 78.56%, and Capacity Utilization Factor (CUF) is 15.73%. Meanwhile, the actual electricity production for one year is 570,724.82 kWh, with the following performance parameters for the PLTS system: Yield Factor (Yf) is 1,232 kWh/kWp, Reference Yield (Yr) is 1,642.85 kWh/kW, Performance Ratio (PR) is 76.12%, and Capacity Utilization Factor (CUF) is 14.26%. There is a difference between the PVSyst software simulation and the actual results, which are 58,825.18 kWh, 126.98 kWh/kWp, 87.75 kWh/kW, 2.44%, and 1.47% respectively.