William Rasdorf
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
William Rasdorf has a total of 45 co-authors. Here are the top co-authors by number of shared publications:
- Joseph E. Hummer
Professor, Dept. of Civil, Construction, and Environmental Engineering, North Carolina State Univ., 2501 Stinson Dr., Raleigh, NC 27695
5 shared publications - Daniel J. Findley
North Carolina State University, USA
4 shared publications - Minerva Bonilla
Department of Construction Science, Texas A&M University, College Station, TX, USA
4 shared publications - Ali Hajbabaie
North Carolina State University
3 shared publications - Donna A. Hollar
Assistant Professor, Dept. of Construction Management, East Carolina Univ., 329 Rawl Building, Mailstop 307, Greenville, NC 27858
3 shared publications - Min Liu
Syracuse Univ
3 shared publications
Latest Publications
- 6 November 2026
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
Evaluating the Impacts of Work Zone Traffic Control during the Construction of an Alternative and a Conventional Intersection
Alternative intersections and interchanges (AIIs) are increasingly being implemented across the United States due to their potential to improve traffic operations and safety. However, limited research has examined how work zone traffic control (WZTC) measures perform during the construction of these complex designs. This study investigated that gap by evaluating the construction-phase WZTC impacts of a diverging diamond interchange (DDI) relative to a conventional intersection (CI), using two projects in North Carolina as case studies. Effective WZTC is critical for managing construction activities and ensuring safety, yet it can disrupt traffic flow, increase travel time, and contribute to congestion and road user costs. To capture participant’s experience and real-world constraints not fully reflected in design manuals, the study integrates findings from 29 semistructured interviews and 68 survey responses with department of transportation personnel, contractors, and consultants experienced with AIIs. These qualitative insights were used to identify key WZTC cost drivers (staging complexity, detour strategies, temporary signals and signing, and site constraints) and to validate and refine a WZTC cost assessment framework. The framework quantifies WZTC impacts through travel time, congestion, and road user costs (delay and vehicle operating costs [VOCs]) for both DDI and CI projects. Results show that the DDI, while constructed without mainline lane reductions, generated substantially higher user delay and detour-related costs during ramp closures than the CI, reflecting greater staging and traffic control complexity. This framework establishes a foundation for broader research and introduces a novel way to assess WZTC impacts, enabling more effective, customized construction-phase planning and staging decisions for AII projects.
- 6 November 2026
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
Evaluating the Impacts of Work Zone Traffic Control during the Construction of an Alternative and a Conventional Intersection
Alternative intersections and interchanges (AIIs) are increasingly being implemented across the United States due to their potential to improve traffic operations and safety. However, limited research has examined how work zone traffic control (WZTC) measures perform during the construction of these complex designs. This study investigated that gap by evaluating the construction-phase WZTC impacts of a diverging diamond interchange (DDI) relative to a conventional intersection (CI), using two projects in North Carolina as case studies. Effective WZTC is critical for managing construction activities and ensuring safety, yet it can disrupt traffic flow, increase travel time, and contribute to congestion and road user costs. To capture participant’s experience and real-world constraints not fully reflected in design manuals, the study integrates findings from 29 semistructured interviews and 68 survey responses with department of transportation personnel, contractors, and consultants experienced with AIIs. These qualitative insights were used to identify key WZTC cost drivers (staging complexity, detour strategies, temporary signals and signing, and site constraints) and to validate and refine a WZTC cost assessment framework. The framework quantifies WZTC impacts through travel time, congestion, and road user costs (delay and vehicle operating costs [VOCs]) for both DDI and CI projects. Results show that the DDI, while constructed without mainline lane reductions, generated substantially higher user delay and detour-related costs during ramp closures than the CI, reflecting greater staging and traffic control complexity. This framework establishes a foundation for broader research and introduces a novel way to assess WZTC impacts, enabling more effective, customized construction-phase planning and staging decisions for AII projects.
- 13 December 2025
- Published by SAGE Publications in Public Works Management & Policy
- Vol. 31  (2) , 140-171
Public Acceptance Scoring System for Alternative Intersections
Intersections are key components of road infrastructure, with conventional designs being the most common. However, these designs might face capacity and safety issues, prompting the need for alternatives. Alternative intersections, such as reduced conflict intersections (RCIs) have shown improvements in travel time and safety for both vehicles and pedestrians, but public acceptance remains a challenge. This paper introduces the Public Acceptance Scoring System (PASS), a tool designed to evaluate the public acceptance of alternative intersection designs. PASS prioritizes variables such as driver confusion, business impacts, and pedestrian discomfort. Based on a review of existing studies and input from experts at the North Carolina Department of Transportation (NCDOT), 16 key variables were identified. The results show that newer designs, like the seven-phase and partial median U-Turn (MUT) with a three-phase traffic signal, are likely to receive higher public acceptance, while partial Continuous Flow Intersections (CFI) may struggle due to traffic redirection and business access limitations.
- 13 December 2025
- Published by SAGE Publications in Public Works Management & Policy
- Vol. 31  (2) , 140-171
Public Acceptance Scoring System for Alternative Intersections
Intersections are key components of road infrastructure, with conventional designs being the most common. However, these designs might face capacity and safety issues, prompting the need for alternatives. Alternative intersections, such as reduced conflict intersections (RCIs) have shown improvements in travel time and safety for both vehicles and pedestrians, but public acceptance remains a challenge. This paper introduces the Public Acceptance Scoring System (PASS), a tool designed to evaluate the public acceptance of alternative intersection designs. PASS prioritizes variables such as driver confusion, business impacts, and pedestrian discomfort. Based on a review of existing studies and input from experts at the North Carolina Department of Transportation (NCDOT), 16 key variables were identified. The results show that newer designs, like the seven-phase and partial median U-Turn (MUT) with a three-phase traffic signal, are likely to receive higher public acceptance, while partial Continuous Flow Intersections (CFI) may struggle due to traffic redirection and business access limitations.
- 30 July 2025
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2679  (10) , 61-78
Performance Effects of the New Displaced Left Turn and Median U-Turn Combination Design
During the last two decades, transportation professionals have turned to alternative intersection designs with two critical signal phases, such as median U-turn (MUT) and reduced conflict intersections (RCIs), to improve safety and mobility. Intersections with two critical signal phases often have substantial safety and performance benefits. Nonetheless, two-critical-phase designs may lack public acceptance and may have noticeable impacts at some intersection sites owing to the substantial changes required to convert a four-phase traffic signal to a two-phase traffic signal. Conversely, three-critical-phase designs might mitigate some of these issues because only one of the signal phases will be removed (compared with a four-phase signal), but they may still present some of the benefits of two-phase designs. This study utilized microsimulation to analyze the performance effects of a new three-phase design, the partial displaced left turn and median U-turn combination (DLT/MUT combination), a partial DLT, and an existing (conventional) intersection at two intersection sites in North Carolina. The results showed that the partial DLT/MUT combination can outperform the conventional intersections in high-traffic volume scenarios. On average, this new design reduced vehicle travel time by 63% and 21% in comparison to the conventional intersection in case study sites #1 and #2, respectively. It also performed similarly with the partial DLT in operations, but it should be safer and more friendly to people walking and biking, and more cost-effective.
- 30 July 2025
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2679  (10) , 61-78
Performance Effects of the New Displaced Left Turn and Median U-Turn Combination Design
During the last two decades, transportation professionals have turned to alternative intersection designs with two critical signal phases, such as median U-turn (MUT) and reduced conflict intersections (RCIs), to improve safety and mobility. Intersections with two critical signal phases often have substantial safety and performance benefits. Nonetheless, two-critical-phase designs may lack public acceptance and may have noticeable impacts at some intersection sites owing to the substantial changes required to convert a four-phase traffic signal to a two-phase traffic signal. Conversely, three-critical-phase designs might mitigate some of these issues because only one of the signal phases will be removed (compared with a four-phase signal), but they may still present some of the benefits of two-phase designs. This study utilized microsimulation to analyze the performance effects of a new three-phase design, the partial displaced left turn and median U-turn combination (DLT/MUT combination), a partial DLT, and an existing (conventional) intersection at two intersection sites in North Carolina. The results showed that the partial DLT/MUT combination can outperform the conventional intersections in high-traffic volume scenarios. On average, this new design reduced vehicle travel time by 63% and 21% in comparison to the conventional intersection in case study sites #1 and #2, respectively. It also performed similarly with the partial DLT in operations, but it should be safer and more friendly to people walking and biking, and more cost-effective.
- 29 January 2025
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2679  (6) , 120-137
Traffic Operations Analysis of Seven New Alternative Intersections with Three-Phase Traffic Signals
This paper presents a traffic operational comparison of seven new alternative signalized intersection designs with three critical phases: 1) offset thru-cut, 2) thru-cut, 3) seven-phase, 4) redirect left and through from one minor road (redirect L&T), 5) reverse reduced conflict intersection (reverse RCI), and 6) and 7) two new versions of partial median U-turn (MUT) intersection. These designs will also be compared with the four-phase conventional intersection and two alternatives with two-phase traffic signals: full MUT and reduced conflict intersection (RCI) designs under various traffic conditions at near-capacity levels. Overall, 1,800 simulation runs were conducted to estimate traffic operations under different traffic conditions with varying traffic volumes, traffic distributions, and turning traffic ratios. Traffic signals were optimized for all the tests, and the optimized signal data was imported into microsimulation to evaluate the performance of the 10 intersections included. According to the results, four of the three-phase intersection designs (offset thru-cut, thru-cut, MUT #1, and reverse RCI) could result in significantly shorter travel times than the conventional intersection. The traffic operations of these four intersection designs were found to be similar to the two-phase designs and even better than the full MUT in scenarios with high turning traffic ratios. The other three intersection designs (seven-phase, redirect L&T, and MUT #2) also showed potential as possible substitutes for existing four-phase intersections under conditions with higher turning traffic demands.
- 29 January 2025
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2679  (6) , 120-137
Traffic Operations Analysis of Seven New Alternative Intersections with Three-Phase Traffic Signals
This paper presents a traffic operational comparison of seven new alternative signalized intersection designs with three critical phases: 1) offset thru-cut, 2) thru-cut, 3) seven-phase, 4) redirect left and through from one minor road (redirect L&T), 5) reverse reduced conflict intersection (reverse RCI), and 6) and 7) two new versions of partial median U-turn (MUT) intersection. These designs will also be compared with the four-phase conventional intersection and two alternatives with two-phase traffic signals: full MUT and reduced conflict intersection (RCI) designs under various traffic conditions at near-capacity levels. Overall, 1,800 simulation runs were conducted to estimate traffic operations under different traffic conditions with varying traffic volumes, traffic distributions, and turning traffic ratios. Traffic signals were optimized for all the tests, and the optimized signal data was imported into microsimulation to evaluate the performance of the 10 intersections included. According to the results, four of the three-phase intersection designs (offset thru-cut, thru-cut, MUT #1, and reverse RCI) could result in significantly shorter travel times than the conventional intersection. The traffic operations of these four intersection designs were found to be similar to the two-phase designs and even better than the full MUT in scenarios with high turning traffic ratios. The other three intersection designs (seven-phase, redirect L&T, and MUT #2) also showed potential as possible substitutes for existing four-phase intersections under conditions with higher turning traffic demands.
- 17 December 2024
- Published by SAGE Publications in Public Works Management & Policy
- Vol. 30  (2) , 202-221
Construction Inhibitors of Alternative Intersections and Interchanges: Insights from Claims and Supplemental Agreements
This study provides an evaluation of the performance of alternative (AII) versus conventional (CII) intersection and interchange designs by examining claims and supplemental agreements. Claims and supplemental agreements are requests for more time or money due to changes or additional work that were not included in the initial contract, and they have the potential to negatively impact on the cost and schedule of these projects. Using North Carolina Department of Transportation (NCDOT) data, normalized for compensation and schedule, it compares claim and supplemental agreement frequency and identifies inhibitors that negatively impact the construction of AII and CII designs. The main inhibitors that were identified for AII designs are utility conflicts, construction sequencing, signals and signage, traffic control, and material estimate changes. Findings indicate CIIs incur more claims than AIIs, and recommendations are provided to aim to reduce claims and supplemental agreements and enhance project success.
- 17 December 2024
- Published by SAGE Publications in Public Works Management & Policy
- Vol. 30  (2) , 202-221
Construction Inhibitors of Alternative Intersections and Interchanges: Insights from Claims and Supplemental Agreements
This study provides an evaluation of the performance of alternative (AII) versus conventional (CII) intersection and interchange designs by examining claims and supplemental agreements. Claims and supplemental agreements are requests for more time or money due to changes or additional work that were not included in the initial contract, and they have the potential to negatively impact on the cost and schedule of these projects. Using North Carolina Department of Transportation (NCDOT) data, normalized for compensation and schedule, it compares claim and supplemental agreement frequency and identifies inhibitors that negatively impact the construction of AII and CII designs. The main inhibitors that were identified for AII designs are utility conflicts, construction sequencing, signals and signage, traffic control, and material estimate changes. Findings indicate CIIs incur more claims than AIIs, and recommendations are provided to aim to reduce claims and supplemental agreements and enhance project success.
- Open Access
- 18 February 2023
- Published by MDPI AG in Sustainability
- Vol. 15  (4) , 3759
Identification of Construction Inhibitors and Sustainable Construction Practices for Alternative Intersections and Interchanges
Despite the recent pandemic and sharp increases in fuel costs, portions of the current U.S. transportation infrastructure have reached their capacity, can no longer carry the increasing traffic volumes they are subjected to, nor can they sustain more. Thus, there is a need to enhance the current infrastructure by funding projects that promote more sustainable practices. Alternative intersections and interchanges (AIIs) can help to achieve this by providing significant improvements in traffic volumes while maintaining or improving safety. However, because they involve unique construction approaches that may be unfamiliar to construction professionals, the cost of AII projects are often perceived to be higher than for conventional designs. This research addressed this problem by identifying inhibitors to the construction of AIIs and enhancers that could improve their construction efficiency. To do so, an online survey was distributed and virtual interviews were conducted to gather knowledge from stakeholders (consultants, designers, and contractors) with experience building AII projects. The results were compiled and assessed to better understand the inhibitors that prevent AII projects from being selected and constructed. The results are promising and help DOTs, contractors, and consultants to focus their resources on minimizing inhibitors to improve project performance. The results show that utilities and right of way are the most prevalent inhibitors that prevent AII projects from being selected and constructed.
- 18 February 2023
- Published by MDPI AG in Sustainability
- Vol. 15  (4) , 3759
Open AccessIdentification of Construction Inhibitors and Sustainable Construction Practices for Alternative Intersections and Interchanges
Despite the recent pandemic and sharp increases in fuel costs, portions of the current U.S. transportation infrastructure have reached their capacity, can no longer carry the increasing traffic volumes they are subjected to, nor can they sustain more. Thus, there is a need to enhance the current infrastructure by funding projects that promote more sustainable practices. Alternative intersections and interchanges (AIIs) can help to achieve this by providing significant improvements in traffic volumes while maintaining or improving safety. However, because they involve unique construction approaches that may be unfamiliar to construction professionals, the cost of AII projects are often perceived to be higher than for conventional designs. This research addressed this problem by identifying inhibitors to the construction of AIIs and enhancers that could improve their construction efficiency. To do so, an online survey was distributed and virtual interviews were conducted to gather knowledge from stakeholders (consultants, designers, and contractors) with experience building AII projects. The results were compiled and assessed to better understand the inhibitors that prevent AII projects from being selected and constructed. The results are promising and help DOTs, contractors, and consultants to focus their resources on minimizing inhibitors to improve project performance. The results show that utilities and right of way are the most prevalent inhibitors that prevent AII projects from being selected and constructed.
- Open Access
- 2 January 2023
- Published by MDPI AG in Sustainability
- Vol. 15  (1) , 808
LED Traffic Signal Repair and Replacement Practices
Upgrading traffic signal systems from incandescent bulbs to LED modules over the last two decades has vastly improved the sustainability of this ubiquitous transportation asset. Recent technological upgrades have extended the warrantied life of these assets from 5 years to 15 years. With these advancements, it is vital that prioritization be given to sustainable operations and maintenance strategies which take advantage of the extended lifespan and continued reduction in energy consumption of LED modules. One major limiting factor in determining these strategies is that the service life of new 15-year-warrantied LED modules is currently unknown. Through available literature, this paper identifies the expected service life of 5-year-warrantied LED modules, commonly used from the early 2000s to 2022, as a baseline for comparison. Literature also provides insight into current Inspection, Repair, and Replacement practices. Interviews with manufacturers provide insight into current and future lifespan expectations. Finally, feedback from active transportation agencies provides examples of current practices in the absence of official national guidance, of which there is little. Understanding the current state of practice and expectations for the future will allow for the development of a repair and replacement guideline, ultimately taking maximum advantage of these advancements in sustainable technology.
- 2 January 2023
- Published by MDPI AG in Sustainability
- Vol. 15  (1) , 808
Open AccessLED Traffic Signal Repair and Replacement Practices
Upgrading traffic signal systems from incandescent bulbs to LED modules over the last two decades has vastly improved the sustainability of this ubiquitous transportation asset. Recent technological upgrades have extended the warrantied life of these assets from 5 years to 15 years. With these advancements, it is vital that prioritization be given to sustainable operations and maintenance strategies which take advantage of the extended lifespan and continued reduction in energy consumption of LED modules. One major limiting factor in determining these strategies is that the service life of new 15-year-warrantied LED modules is currently unknown. Through available literature, this paper identifies the expected service life of 5-year-warrantied LED modules, commonly used from the early 2000s to 2022, as a baseline for comparison. Literature also provides insight into current Inspection, Repair, and Replacement practices. Interviews with manufacturers provide insight into current and future lifespan expectations. Finally, feedback from active transportation agencies provides examples of current practices in the absence of official national guidance, of which there is little. Understanding the current state of practice and expectations for the future will allow for the development of a repair and replacement guideline, ultimately taking maximum advantage of these advancements in sustainable technology.
- 27 September 2022
- Published by SAGE Publications in Public Works Management & Policy
- Vol. 28  (3) , 339-362
Inequity Reduction in Road Maintenance Funding for Municipalities
State transportation agencies distribute funding to eligible municipalities to maintain local roads in a safe condition based on their permanent population and street mileage. However, some municipalities experience an exceedingly high seasonal population that is unaccounted for and thus, they are not receiving equitable funding. To better understand seasonal population and mitigate its impact, this paper evaluates equity and affordability in funding allocation, explores how to estimate seasonal population, suggests a method to improve the current allocation, and identifies practical strategies to reduce disproportionate funding distribution. Three funding allocation strategies were developed and a need-based funding allocation approach was identified to be an equitable solution to help municipalities improve local street conditions based on their needs while subject to constraints on funding availability. This approach allows municipalities to address seasonal population increases without negatively impacting funds for municipalities that do not experience fluctuations in their population.
- 27 September 2022
- Published by SAGE Publications in Public Works Management & Policy
- Vol. 28  (3) , 339-362
Inequity Reduction in Road Maintenance Funding for Municipalities
State transportation agencies distribute funding to eligible municipalities to maintain local roads in a safe condition based on their permanent population and street mileage. However, some municipalities experience an exceedingly high seasonal population that is unaccounted for and thus, they are not receiving equitable funding. To better understand seasonal population and mitigate its impact, this paper evaluates equity and affordability in funding allocation, explores how to estimate seasonal population, suggests a method to improve the current allocation, and identifies practical strategies to reduce disproportionate funding distribution. Three funding allocation strategies were developed and a need-based funding allocation approach was identified to be an equitable solution to help municipalities improve local street conditions based on their needs while subject to constraints on funding availability. This approach allows municipalities to address seasonal population increases without negatively impacting funds for municipalities that do not experience fluctuations in their population.
- Open Access
- 22 August 2022
- Published by MDPI AG in Remote Sensing
- Vol. 14  (16) , 4119
Assessment and Prediction of Impact of Flight Configuration Factors on UAS-Based Photogrammetric Survey Accuracy
Recent advances in computer vision and camera-equipped unmanned aerial systems (UAS) for 3D modeling enable UAS-based photogrammetry surveys with high spatial-temporal resolutions. To generate consistent and high-quality 3D models using UASs, understanding how influence factors (i.e., flight height, image overlap, etc.) affect the 3D modeling accuracy and their levels of significance are important. However, there is little to no quantitative analysis that studies how these influence factors interact with and affect the accuracy when changing the values of the influence factors. Moreover, there is little to no research that assesses more than three influence factors. Therefore, to fill this gap, this paper aims to evaluate and predict the accuracy generated by different flight combinations. This paper presents a study that (1) assessed the significance levels of five influence factors (flight height, average image quality, image overlap, ground control point (GCP) quantity, and camera focal lengths), (2) investigated how they interact and impact 3D modeling accuracy using the multiple regression (MR) method, and (3) used the developed MR models for predicting horizontal and vertical accuracies. To build the MR model, 160 datasets were created from 40 flight missions collected at a site with a facility and open terrain. For validating the prediction model, five testing datasets were collected and used at a larger site with a complex building and open terrain. The results show that the findings of this study can be applied to surveyors’ better design flight configurations that result in the highest accuracies, given different site conditions and constraints. The results also provide a reasonable prediction of accuracy given different flight configurations.
- 22 August 2022
- Published by MDPI AG in Remote Sensing
- Vol. 14  (16) , 4119
Open AccessAssessment and Prediction of Impact of Flight Configuration Factors on UAS-Based Photogrammetric Survey Accuracy
Recent advances in computer vision and camera-equipped unmanned aerial systems (UAS) for 3D modeling enable UAS-based photogrammetry surveys with high spatial-temporal resolutions. To generate consistent and high-quality 3D models using UASs, understanding how influence factors (i.e., flight height, image overlap, etc.) affect the 3D modeling accuracy and their levels of significance are important. However, there is little to no quantitative analysis that studies how these influence factors interact with and affect the accuracy when changing the values of the influence factors. Moreover, there is little to no research that assesses more than three influence factors. Therefore, to fill this gap, this paper aims to evaluate and predict the accuracy generated by different flight combinations. This paper presents a study that (1) assessed the significance levels of five influence factors (flight height, average image quality, image overlap, ground control point (GCP) quantity, and camera focal lengths), (2) investigated how they interact and impact 3D modeling accuracy using the multiple regression (MR) method, and (3) used the developed MR models for predicting horizontal and vertical accuracies. To build the MR model, 160 datasets were created from 40 flight missions collected at a site with a facility and open terrain. For validating the prediction model, five testing datasets were collected and used at a larger site with a complex building and open terrain. The results show that the findings of this study can be applied to surveyors’ better design flight configurations that result in the highest accuracies, given different site conditions and constraints. The results also provide a reasonable prediction of accuracy given different flight configurations.
- Open Access
- 26 July 2019
- Published by SAGE Publications in Public Works Management & Policy
- Vol. 25  (1) , 51-74
Analysis of Three Sign Management Program Case Studies
Traffic signs play a major role on the national highway system because they provide users with important information such as warnings, regulations, and directions. To ensure sign visibility at night, the Manual on Uniform Traffic Control Devices (MUTCD) requires transportation agencies to meet minimum sign retroreflectivity levels through a sign maintenance program. To better understand current trends, the researchers conducted an extensive literature search that showed that expected sign life and nighttime inspection are the most used methods, followed by blanket replacement. The literature does not typically discuss how these methods are implemented. Thus, the research team also contacted three of the four largest state-maintained highway systems in the United States (North Carolina, Virginia, and South Carolina) to discuss sign maintenance programs, implementation issues, and best practices. The authors describe in this article the findings and conclusions drawn from these case studies that may help other agencies improve their sign maintenance practices.
- 26 July 2019
- Published by SAGE Publications in Public Works Management & Policy
- Vol. 25  (1) , 51-74
Open AccessAnalysis of Three Sign Management Program Case Studies
Traffic signs play a major role on the national highway system because they provide users with important information such as warnings, regulations, and directions. To ensure sign visibility at night, the Manual on Uniform Traffic Control Devices (MUTCD) requires transportation agencies to meet minimum sign retroreflectivity levels through a sign maintenance program. To better understand current trends, the researchers conducted an extensive literature search that showed that expected sign life and nighttime inspection are the most used methods, followed by blanket replacement. The literature does not typically discuss how these methods are implemented. Thus, the research team also contacted three of the four largest state-maintained highway systems in the United States (North Carolina, Virginia, and South Carolina) to discuss sign maintenance programs, implementation issues, and best practices. The authors describe in this article the findings and conclusions drawn from these case studies that may help other agencies improve their sign maintenance practices.