Latest Publications

  • Open Access

    Risk Considerations in the Use of Unmanned Aerial Vehicles in the Construction Industry

    by George Wang, Donna Hollar, Susan Sayger, Zhen Zhu, John Buckeridge, Jie Li, Jimmy Chong, Colin Duffield, Dongryeol Ryu, Wei Hu


  • Preliminary Engineering Cost Estimation Model for Bridge Projects

    by Donna A. Hollar, William Rasdorf, Min Liu, Joseph E. Hummer, Ingrid Arocho, Simon M. Hsiang

    This paper addresses one of the costs of new bridges, i.e., the cost of doing the preliminary engineering (PE). This particular aspect of cost has largely been neglected because of the difficulty in obtaining appropriate data. Typically, PE costs are determined as a percentage of construction costs, disregarding other project-specific parameters. Bridge projects let by the North Carolina (NC) DOT between 2001 and 2009 were reviewed. From an analysis of these 461 projects, the writers developed statistical models linking variation in PE costs with distinctive project parameters. The primary contribution this paper makes to the body of knowledge is the finding that PE cost estimates for bridge projects are commonly and significantly underestimated. The writers found that bridge projects exhibited a mean PE cost ratio of 28%. This result is significantly greater than the percentage used in practice. An investigation of data sources related to bridge projects, a description of regression techniques applied to predict the PE cost of such projects, and an assessment of the predictive performance of models are addressed in this paper. New knowledge contributions include identification of key factors affecting the PE costs of bridges, illustration of how those key factors enabled us to predict PE costs of future projects, and discussion of the data collection problems that hindered model development. The writers’ PE cost analyses and predictive modeling effort relate to infrastructure funding issues. All of the parties involved in infrastructure construction, from legislators to contractors, must understand costs and have confidence in the cost estimates developed to ensure efficient and effective funding of infrastructure projects. This paper on bridge PE costs addresses one component of infrastructure funding.


  • Preliminary Engineering Cost-Estimation Strategy Assessment for Roadway Projects

    by Min Liu, William Rasdorf, Joseph E. Hummer, Donna A. Hollar, Shalin C. Parikh

    Preliminary engineering (PE) for a roadway project encompasses two efforts: planning to minimize the physical, social, and human environmental impacts of projects and engineering design to deliver the best alternative. State transportation agencies strive to manage these efforts efficiently, seeking to maximize the utilization of limited funding and workforce productivity. Managers need a feasible PE budget, considering both cost and time, early in project development. The results reported herein will provide engineers and managers with a comparative investigation evaluating different strategies for establishing a PE budget during the preconstruction phase of roadway project development. Cost data were obtained for 188 North Carolina roadway projects built between 1999 and 2009. An analysis of the North Carolina DOT data yielded an overall mean ratio of PE cost to estimated construction cost (the PE cost ratio) of 11.7%. The multiple linear regression model was used to develop prediction models to forecast the PE cost ratio of future roadway projects. It was found that while differing regression strategies could reduce prediction error, the improvement was small. In terms of simplicity, using the historical means applicable for widening projects (13.3%), rehabilitation/resurfacing projects (7.7%), and new location/interchange projects (16.5%) proved advantageous over regression modeling because a project manager would not have to estimate any project-specific values at the earliest stages of project development. The lowest of these historical means was significantly different than the two higher means (7.7% versus 13.3% and 16.5%); however, the difference between the two higher means (13.3% versus 16.5%) was not statistically significant. The study analyses also found a significant correlation between a project’s PE cost ratio and its PE duration, suggesting that further investigation into PE duration of transportation projects is warranted.


  • Predicting the Preliminary Engineering Duration of Bridge Projects

    by Min Liu, William Rasdorf, Donna A. Hollar, Joseph E. Hummer, Shalin C. Parikh

    Preliminary engineering (PE) is a critical preconstruction phase of infrastructure projects, encompassing the initial planning and design processes necessary for successful commencement and completion of a project. The duration of PE influences both the cost and schedule of any civil infrastructure project. Numerous studies targeted at construction duration estimation exist, but few address strategies to estimate PE duration. This study sought to identify the project factors that influenced the PE duration of bridge projects and to determine if regression modeling with those factors would provide a feasible tool for PE duration estimation. Some 416 bridge projects conducted by the North Carolina Department of Transportation (NCDOT) served as the analysis sample. Among the project factors investigated, four descriptive factors significantly influenced PE duration: geographical area of the state, classification of the required National Environmental Policy Act (NEPA) document, bridge construction scope, and responsible party preparing the NEPA document. For validation purposes, the authors randomly extracted 60 of the 416 bridge projects before regression modeling. Regression models achieved a mean absolute percentage error (MAPE) of 21% when applied to the validation set. Comparatively, using the mean PE duration of 66 months as a single point estimator, the MAPE was 22% for the same validation set. Based on these results, the project team recommended that the NCDOT can use the regression equation to estimate PE duration. It is also clear that this is a difficult problem that deserves further research attention.