Antonio Perillo-Marcone
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Antonio Perillo-Marcone has a total of 1000 co-authors. Here are the top co-authors by number of shared publications:
- Marco Calviani
European Organization for Nuclear Research
14 shared publications - Anton Lechner
European Organization for Nuclear Research
4 shared publications - J. L. Grenard
European Organization for Nuclear Research
4 shared publications K. Kershaw
CERN, 1211 Geneva 23, Switzerland
4 shared publications- Paolo Craievich
Paul Scherrer Institute
4 shared publications - Ramiro Mena-Andrade
European Organization for Nuclear Research
4 shared publications
Latest Publications
- Open Access
- 1 September 2026
- Published by IOP Publishing in Journal of Instrumentation
- Vol. 21 (09) , P09035
Design and development of the P-cubed Target Insertion Device (P 3 -TID)
The P-cubed Target Insertion Device (P 3 -TID) is a research instrument dedicated to test novel positron source target configurations inside of the proof-of-principle PSI Positron Production (P-cubed or P 3 ) experiment at the Paul Scherrer Institute. The device allows an easy installation, positioning and replacement of different fixed targets. The present article describes its mechanical design at a detailed level.
- 1 September 2026
- Published by IOP Publishing in Journal of Instrumentation
- Vol. 21 (09) , P09035
Open AccessDesign and development of the P-cubed Target Insertion Device (P 3 -TID)
The P-cubed Target Insertion Device (P 3 -TID) is a research instrument dedicated to test novel positron source target configurations inside of the proof-of-principle PSI Positron Production (P-cubed or P 3 ) experiment at the Paul Scherrer Institute. The device allows an easy installation, positioning and replacement of different fixed targets. The present article describes its mechanical design at a detailed level.
- Open Access
- 21 July 2026
- Published by Springer Nature in The European Physical Journal C
- Vol. 86 (7)
Erratum to: Future Circular Collider Feasibility Study Report
- 21 July 2026
- Published by Springer Nature in The European Physical Journal C
- Vol. 86 (7)
Open AccessErratum to: Future Circular Collider Feasibility Study Report
- Top Cited PapersOpen Access
- 24 December 2025
- Published by Springer Nature in The European Physical Journal C
- Vol. 85 (12)
Future Circular Collider Feasibility Study Report
Volume 1 of the FCC Feasibility Report presents an overview of the physics case, experimental programme, and detector concepts for the Future Circular Collider (FCC). This volume outlines how FCC would address some of the most profound open questions in particle physics, from precision studies of the Higgs and EW bosons and of the top quark, to the exploration of physics beyond the Standard Model. The report reviews the experimental opportunities offered by the staged implementation of FCC, beginning with an electron-positron collider (FCC-ee), operating at several centre-of-mass energies, followed by a hadron collider (FCC-hh). Benchmark examples are given of the expected physics performance, in terms of precision and sensitivity to new phenomena, of each collider stage. Detector requirements and conceptual designs for FCC-ee experiments are discussed, as are the specific demands that the physics programme imposes on the accelerator in the domains of the calibration of the collision energy, and the interface region between the accelerator and the detector. The report also highlights advances in detector, software and computing technologies, as well as the theoretical tools/reconstruction techniques that will enable the precision measurements and discovery potential of the FCC experimental programme. The content and structure of this report are guided by the scope and priorities defined in the mandate of the FCC Feasibility Study. It is therefore not intended to serve as an exhaustive review of the full physics potential of FCC. Several topics, already covered in earlier reports such as the FCC CDR, are not reiterated here or are addressed only briefly, in alignment with the study’s focus. This volume reflects the outcome of a global collaborative effort involving hundreds of scientists and institutions, aided by a dedicated community-building coordination, and provides a targeted assessment of the scientific opportunities and experimental foundations of the FCC programme.
- 24 December 2025
- Published by Springer Nature in The European Physical Journal C
- Vol. 85 (12)
Top Cited PapersOpen AccessFuture Circular Collider Feasibility Study Report
Volume 1 of the FCC Feasibility Report presents an overview of the physics case, experimental programme, and detector concepts for the Future Circular Collider (FCC). This volume outlines how FCC would address some of the most profound open questions in particle physics, from precision studies of the Higgs and EW bosons and of the top quark, to the exploration of physics beyond the Standard Model. The report reviews the experimental opportunities offered by the staged implementation of FCC, beginning with an electron-positron collider (FCC-ee), operating at several centre-of-mass energies, followed by a hadron collider (FCC-hh). Benchmark examples are given of the expected physics performance, in terms of precision and sensitivity to new phenomena, of each collider stage. Detector requirements and conceptual designs for FCC-ee experiments are discussed, as are the specific demands that the physics programme imposes on the accelerator in the domains of the calibration of the collision energy, and the interface region between the accelerator and the detector. The report also highlights advances in detector, software and computing technologies, as well as the theoretical tools/reconstruction techniques that will enable the precision measurements and discovery potential of the FCC experimental programme. The content and structure of this report are guided by the scope and priorities defined in the mandate of the FCC Feasibility Study. It is therefore not intended to serve as an exhaustive review of the full physics potential of FCC. Several topics, already covered in earlier reports such as the FCC CDR, are not reiterated here or are addressed only briefly, in alignment with the study’s focus. This volume reflects the outcome of a global collaborative effort involving hundreds of scientists and institutions, aided by a dedicated community-building coordination, and provides a targeted assessment of the scientific opportunities and experimental foundations of the FCC programme.
- Open Access
- 11 September 2025
- Published by Elsevier in Nuclear Instruments and Methods in Physics Research Section B: Beam Interactions with Materials and Atoms
- Vol. 568
Conical targets for enhanced high-current positron sources
- 11 September 2025
- Published by Elsevier in Nuclear Instruments and Methods in Physics Research Section B: Beam Interactions with Materials and Atoms
- Vol. 568
Open AccessConical targets for enhanced high-current positron sources
- Open Access
- 12 April 2024
- Published by American Physical Society (APS) in Physical Review Accelerators and Beams
- Vol. 27 (4) , 043001
Design and early operation of a new-generation internal beam dump for CERN’s Super Proton Synchrotron
The Super Proton Synchrotron (SPS) is the last stage in the injector chain for CERN’s Large Hadron Collider, and it also provides proton and ion beams for several fixed-target experiments. The SPS has been in operation since 1976, and it has been upgraded over the years. For the SPS to operate safely, its internal beam dump must be able to repeatedly absorb the energy of the circulating beams without sustaining damage that would affect its function. The latest upgrades of the SPS led to the requirement for its beam dump to absorb proton beams with a momentum spectrum from 14 to and an average beam power of up to . This paper presents the technical details of a new design of the SPS beam dump that was installed in one of the long straight sections of the SPS during the 2019–2020 shutdown of CERN’s accelerator complex within the framework of the Large Hadron Collider Injectors Upgrade Project. This new beam dump has been in the operation since May 2021, and it is foreseen that it will operate with a lifetime of 20 years. The key challenges in the design of the beam dump were linked to the high levels of thermal energy to be dissipated—to avoid overheating and damage to the beam dump itself—and high induced levels of radiation, which have implications for personnel access to monitor the beam dump and repair any problems occurring during operation. The design process, therefore, included extensive thermomechanical finite-element simulations of the beam-dump core and its cooling system’s response to normal operation and worst-case scenarios for beam dumping. To ensure high thermal conductivity between the beam-dump core and its water-cooling system, hot isostatic pressing techniques were used in its manufacturing process. A comprehensive set of instrumentation was installed in the beam dump to monitor it during operation and to cross-check the numerical models with operational feedback. The beam dump and its infrastructure design were also optimized to ensure it can be maintained, repaired, or replaced while minimizing the radiation doses received by personnel.- 12 April 2024
- Published by American Physical Society (APS) in Physical Review Accelerators and Beams
- Vol. 27 (4) , 043001
Open AccessDesign and early operation of a new-generation internal beam dump for CERN’s Super Proton Synchrotron
The Super Proton Synchrotron (SPS) is the last stage in the injector chain for CERN’s Large Hadron Collider, and it also provides proton and ion beams for several fixed-target experiments. The SPS has been in operation since 1976, and it has been upgraded over the years. For the SPS to operate safely, its internal beam dump must be able to repeatedly absorb the energy of the circulating beams without sustaining damage that would affect its function. The latest upgrades of the SPS led to the requirement for its beam dump to absorb proton beams with a momentum spectrum from 14 to and an average beam power of up to . This paper presents the technical details of a new design of the SPS beam dump that was installed in one of the long straight sections of the SPS during the 2019–2020 shutdown of CERN’s accelerator complex within the framework of the Large Hadron Collider Injectors Upgrade Project. This new beam dump has been in the operation since May 2021, and it is foreseen that it will operate with a lifetime of 20 years. The key challenges in the design of the beam dump were linked to the high levels of thermal energy to be dissipated—to avoid overheating and damage to the beam dump itself—and high induced levels of radiation, which have implications for personnel access to monitor the beam dump and repair any problems occurring during operation. The design process, therefore, included extensive thermomechanical finite-element simulations of the beam-dump core and its cooling system’s response to normal operation and worst-case scenarios for beam dumping. To ensure high thermal conductivity between the beam-dump core and its water-cooling system, hot isostatic pressing techniques were used in its manufacturing process. A comprehensive set of instrumentation was installed in the beam dump to monitor it during operation and to cross-check the numerical models with operational feedback. The beam dump and its infrastructure design were also optimized to ensure it can be maintained, repaired, or replaced while minimizing the radiation doses received by personnel. - Open Access
Design and early operation of a new-generation internal beam dump for CERN's Super Proton Synchrotron
The Super Proton Synchrotron (SPS) is the last stage in the injector chain for CERN's Large Hadron Collider, and it also provides proton and ion beams for several fixed-target experiments. The SPS has been in operation since 1976, and it has been upgraded over the years. For the SPS to operate safely, its internal beam dump must be able to repeatedly absorb the energy of the circulating beams without sustaining damage that would affect its function. The latest upgrades of the SPS led to the requirement for its beam dump to absorb proton beams with a momentum spectrum from 14 to 450~GeV/$c$ and an average beam power up to $\sim$270~kW. This paper presents the technical details of a new design of SPS beam dump that was installed in one of the long straight sections of the SPS during the 2019--2020 shutdown of CERN's accelerator complex. This new beam dump has been in operation since May 2021, and it is foreseen that it will operate with a lifetime of 20~years. The key challenges in the design of the beam dump were linked to the high levels of thermal energy to be dissipated -- to avoid overheating and damage to the beam dump itself -- and high induced levels of radiation, which have implications for personnel access to monitor the beam dump and repair any problems occurring during operation. The design process therefore included extensive thermomechanical finite-element simulations of the beam-dump core and its cooling system's response to normal operation and worst-case scenarios for beam dumping. To ensure high thermal conductivity between the beam-dump core and its water-cooling system, hot isostatic pressing techniques were used in its manufacturing process. A comprehensive set of instrumentation was installed in the beam dump to monitor it during operation and to cross-check the numerical models with operational feedback.
Open AccessDesign and early operation of a new-generation internal beam dump for CERN's Super Proton Synchrotron
The Super Proton Synchrotron (SPS) is the last stage in the injector chain for CERN's Large Hadron Collider, and it also provides proton and ion beams for several fixed-target experiments. The SPS has been in operation since 1976, and it has been upgraded over the years. For the SPS to operate safely, its internal beam dump must be able to repeatedly absorb the energy of the circulating beams without sustaining damage that would affect its function. The latest upgrades of the SPS led to the requirement for its beam dump to absorb proton beams with a momentum spectrum from 14 to 450~GeV/$c$ and an average beam power up to $\sim$270~kW. This paper presents the technical details of a new design of SPS beam dump that was installed in one of the long straight sections of the SPS during the 2019--2020 shutdown of CERN's accelerator complex. This new beam dump has been in operation since May 2021, and it is foreseen that it will operate with a lifetime of 20~years. The key challenges in the design of the beam dump were linked to the high levels of thermal energy to be dissipated -- to avoid overheating and damage to the beam dump itself -- and high induced levels of radiation, which have implications for personnel access to monitor the beam dump and repair any problems occurring during operation. The design process therefore included extensive thermomechanical finite-element simulations of the beam-dump core and its cooling system's response to normal operation and worst-case scenarios for beam dumping. To ensure high thermal conductivity between the beam-dump core and its water-cooling system, hot isostatic pressing techniques were used in its manufacturing process. A comprehensive set of instrumentation was installed in the beam dump to monitor it during operation and to cross-check the numerical models with operational feedback.
- Open Access
- 26 July 2023
- Published by Elsevier in Materials & Design
- Vol. 233
FIB-SEM investigation and uniaxial compression of flexible graphite
- 26 July 2023
- Published by Elsevier in Materials & Design
- Vol. 233
Open AccessFIB-SEM investigation and uniaxial compression of flexible graphite
- Open Access
- 1 January 2022
- Published by IOP Publishing in Journal of Instrumentation
- Vol. 17 (01) , P01019
High intensity proton beam impact at 440 GeV/c on Mo and Cu coated CfC/graphite and SiC/SiC absorbers for beam intercepting devices
Beam Intercepting Devices (BIDs) are essential protection elements for the operation of the Large Hadron Collider (LHC) complex. The LHC internal beam dump (LHC Target Dump Injection or LHC TDI) is the main protection BID of the LHC injection system; its main function is to protect LHC equipment in the event of a malfunction of the injection kicker magnets during beam transfer from the SPS to the LHC. Several issues with the TDI were encountered during LHC operation, most of them due to outgassing from its core components induced by electron cloud effects, which led to limitations of the injector intensity and hence had an impact on LHC availability. The absorbing cores of the TDIs, and of beam intercepting devices in general, need to deal with high thermo-mechanical loads induced by the high intensity particle beams. In addition, devices such as the TDI — where the absorbing materials are installed close to the beam, are important contributors to the accelerator impedance budget. To reduce impedance, the absorbing materials that make up the core must be typically coated with high electrical conductivity metals. Beam impact testing of the coated absorbers is a crucial element of development work to ensure their correct operation. In the work covered by this paper, the behaviour of several metal-coated absorber materials was investigated when exposed to high intensity and high energy proton beams in the HiRadMat facility at CERN. Different coating configurations based on copper and molybdenum, and absorbing materials such as isostatic graphite, Carbon Fibre Composite (CfC) and Silicon Carbide reinforced with Silicon Carbide fibres (SiC-SiC), were tested in the facility to assess the TDI's performance and to extract information for other BIDs using these materials. In addition to beam impact tests and an extensive Post Irradiation Examination (PIE) campaign to assess the performance of the coatings and the structural integrity of the substrates, extensive numerical simulations were carried out.
- 1 January 2022
- Published by IOP Publishing in Journal of Instrumentation
- Vol. 17 (01) , P01019
Open AccessHigh intensity proton beam impact at 440 GeV/c on Mo and Cu coated CfC/graphite and SiC/SiC absorbers for beam intercepting devices
Beam Intercepting Devices (BIDs) are essential protection elements for the operation of the Large Hadron Collider (LHC) complex. The LHC internal beam dump (LHC Target Dump Injection or LHC TDI) is the main protection BID of the LHC injection system; its main function is to protect LHC equipment in the event of a malfunction of the injection kicker magnets during beam transfer from the SPS to the LHC. Several issues with the TDI were encountered during LHC operation, most of them due to outgassing from its core components induced by electron cloud effects, which led to limitations of the injector intensity and hence had an impact on LHC availability. The absorbing cores of the TDIs, and of beam intercepting devices in general, need to deal with high thermo-mechanical loads induced by the high intensity particle beams. In addition, devices such as the TDI — where the absorbing materials are installed close to the beam, are important contributors to the accelerator impedance budget. To reduce impedance, the absorbing materials that make up the core must be typically coated with high electrical conductivity metals. Beam impact testing of the coated absorbers is a crucial element of development work to ensure their correct operation. In the work covered by this paper, the behaviour of several metal-coated absorber materials was investigated when exposed to high intensity and high energy proton beams in the HiRadMat facility at CERN. Different coating configurations based on copper and molybdenum, and absorbing materials such as isostatic graphite, Carbon Fibre Composite (CfC) and Silicon Carbide reinforced with Silicon Carbide fibres (SiC-SiC), were tested in the facility to assess the TDI's performance and to extract information for other BIDs using these materials. In addition to beam impact tests and an extensive Post Irradiation Examination (PIE) campaign to assess the performance of the coatings and the structural integrity of the substrates, extensive numerical simulations were carried out.
- Open Access
- 1 December 2021
- Published by Elsevier in Nuclear Materials and Energy
- Vol. 29
Selection of radiation tolerant commercial greases for high-radiation areas at CERN: Methodology and applications
- 1 December 2021
- Published by Elsevier in Nuclear Materials and Energy
- Vol. 29
Open AccessSelection of radiation tolerant commercial greases for high-radiation areas at CERN: Methodology and applications
- Open Access
- 14 April 2021
- Published by American Physical Society (APS) in Physical Review Accelerators and Beams
- Vol. 24 (4) , 043001
Hot isostatic pressing assisted diffusion bonding for application to the Super Proton Synchrotron internal beam dump at CERN
The new generation internal beam dump of the Super Proton Synchrotron (SPS) at CERN will have to dissipate approximately 270 kW of thermal power, deposited by the primary proton beam. For this purpose, it is essential that the cooling system features a very efficient heat evacuation. Diffusion bonding assisted by hot isostatic pressing (HIP) was identified as a promising method of joining the cooling circuits and the materials of the dumps core in order to maximize the heat transfer efficiency. This paper presents the investigation of HIP assisted diffusion bonding between two CuCr1Zr blanks enclosing SS 316L tubes and the realization of a real size prototype of one of the dump’s cooling plates, as well as the assessments of its cooling performance under the dump’s most critical operational scenarios. Energy-dispersive x-ray spectroscopy, microstructural analyses, measurements of thermal conductivity, and mechanical strength were performed to characterize the HIP diffusion bonded interfaces (CuCr1Zr-CuCr1Zr and CuCr1Zr-SS 316L). A test bench allowed to assess the cooling performance of the real size prototype. At the bonded interface, the presence of typical diffusional phenomena was observed. Moreover, measured tensile strength and thermal conductivity were at least equivalent to the lowest ones of the materials assembled and comparable to its bulk properties, meaning that a good bonding quality was achieved. Finally, the real size prototype was successfully tested with an ad hoc thermal test bench and with the highest operational thermal power expected in the new generation SPS internal beam dump. These results demonstrated the possibility to use HIP as a manufacturing technique for the cooling plates of the new generation SPS internal beam dump, but they also open up the way for further investigations on its exploitability to improve the cooling performance of any future high intensity beam intercepting device or in general devices requiring very efficient heat evacuation systems.
- 14 April 2021
- Published by American Physical Society (APS) in Physical Review Accelerators and Beams
- Vol. 24 (4) , 043001
Open AccessHot isostatic pressing assisted diffusion bonding for application to the Super Proton Synchrotron internal beam dump at CERN
The new generation internal beam dump of the Super Proton Synchrotron (SPS) at CERN will have to dissipate approximately 270 kW of thermal power, deposited by the primary proton beam. For this purpose, it is essential that the cooling system features a very efficient heat evacuation. Diffusion bonding assisted by hot isostatic pressing (HIP) was identified as a promising method of joining the cooling circuits and the materials of the dumps core in order to maximize the heat transfer efficiency. This paper presents the investigation of HIP assisted diffusion bonding between two CuCr1Zr blanks enclosing SS 316L tubes and the realization of a real size prototype of one of the dump’s cooling plates, as well as the assessments of its cooling performance under the dump’s most critical operational scenarios. Energy-dispersive x-ray spectroscopy, microstructural analyses, measurements of thermal conductivity, and mechanical strength were performed to characterize the HIP diffusion bonded interfaces (CuCr1Zr-CuCr1Zr and CuCr1Zr-SS 316L). A test bench allowed to assess the cooling performance of the real size prototype. At the bonded interface, the presence of typical diffusional phenomena was observed. Moreover, measured tensile strength and thermal conductivity were at least equivalent to the lowest ones of the materials assembled and comparable to its bulk properties, meaning that a good bonding quality was achieved. Finally, the real size prototype was successfully tested with an ad hoc thermal test bench and with the highest operational thermal power expected in the new generation SPS internal beam dump. These results demonstrated the possibility to use HIP as a manufacturing technique for the cooling plates of the new generation SPS internal beam dump, but they also open up the way for further investigations on its exploitability to improve the cooling performance of any future high intensity beam intercepting device or in general devices requiring very efficient heat evacuation systems.