Design and early operation of a new-generation internal beam dump for CERN’s Super Proton Synchrotron
Open Access
- 12 April 2024
- journal article
- research article
- Published by American Physical Society (APS) in Physical Review Accelerators and Beams
- Vol. 27 (4) , 043001
Abstract
The Super Proton Synchrotron (SPS) is the last stage in the injector chain for CERN’s Large Hadron Collider, and it also provides proton and ion beams for several fixed-target experiments. The SPS has been in operation since 1976, and it has been upgraded over the years. For the SPS to operate safely, its internal beam dump must be able to repeatedly absorb the energy of the circulating beams without sustaining damage that would affect its function. The latest upgrades of the SPS led to the requirement for its beam dump to absorb proton beams with a momentum spectrum from 14 to and an average beam power of up to . This paper presents the technical details of a new design of the SPS beam dump that was installed in one of the long straight sections of the SPS during the 2019–2020 shutdown of CERN’s accelerator complex within the framework of the Large Hadron Collider Injectors Upgrade Project. This new beam dump has been in the operation since May 2021, and it is foreseen that it will operate with a lifetime of 20 years. The key challenges in the design of the beam dump were linked to the high levels of thermal energy to be dissipated—to avoid overheating and damage to the beam dump itself—and high induced levels of radiation, which have implications for personnel access to monitor the beam dump and repair any problems occurring during operation. The design process, therefore, included extensive thermomechanical finite-element simulations of the beam-dump core and its cooling system’s response to normal operation and worst-case scenarios for beam dumping. To ensure high thermal conductivity between the beam-dump core and its water-cooling system, hot isostatic pressing techniques were used in its manufacturing process. A comprehensive set of instrumentation was installed in the beam dump to monitor it during operation and to cross-check the numerical models with operational feedback. The beam dump and its infrastructure design were also optimized to ensure it can be maintained, repaired, or replaced while minimizing the radiation doses received by personnel.
Keywords
All Related Versions
Funding Information
- CERN
This publication has 13 references indexed in Scilit:
- Design and actual performance of J-PARC 3 GeV rapid cycling synchrotron for high-intensity operationJournal of Nuclear Science and Technology, 2022
- Selection of radiation tolerant commercial greases for high-radiation areas at CERN: Methodology and applicationsNuclear Materials and Energy, 2021
- Thermal loading analysis of the ring injection dump for the Spallation Neutron Source facilityNuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment, 2021
- Hot isostatic pressing assisted diffusion bonding for application to the Super Proton Synchrotron internal beam dump at CERNPhysical Review Accelerators and Beams, 2021
- The LIPAc beam dumpFusion Engineering and Design, 2018
- Thermal, mechanical and fluid flow aspects of the high power beam dump for FRIBNuclear Instruments and Methods in Physics Research Section B: Beam Interactions with Materials and Atoms, 2016
- Mechanical properties of Austenitic Stainless Steel 304L and 316L at elevated temperaturesJournal of Materials Research and Technology, 2016
- Construction and beam commissioning of Hadron Experimental Hall at J-PARCJournal of Physics: Conference Series, 2011
- A Comprehensive Theory of Yielding and Failure for Isotropic MaterialsJournal of Engineering Materials and Technology, 2007
- The New Internal Beam Dump at the SPS. Temperature and Stress Calculations and Its DesignIEEE Transactions on Nuclear Science, 1981