Hongxing Qiu
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Hongxing Qiu has a total of 13 co-authors. Here are the top co-authors by number of shared publications:
Jian Sun
Key Laboratory of Concrete and Prestressed Concrete Structures of Ministry of Education, Southeast University, Nanjing, China
5 shared publications- Hongbo Jiang
College of Architectural Science and Engineering, Yangzhou University, Yangzhou, China
3 shared publications - Jian Sun
Key Laboratory of Concrete and Prestressed Concrete Structures of Ministry of Education, Southeast University, Nanjing, China
2 shared publications Bo Lu
Southeast University
1 shared publication- Dafu Cao
College of Civil Science and Engineering, Yangzhou University, Yangzhou 225127, China
1 shared publication - Hengwei Cui
College of Civil Science and Engineering, Yangzhou University, Yangzhou 225127, China
1 shared publication
Latest Publications
- Open Access
Cyclic Behavior of Multiple Hardening Precast Concrete Shear Walls
Precast Concrete (PC) shear walls are becoming popular in building structures. With “wet” connection techniques, PC shear walls often behave like conventional cast-in-place walls, where hardening occurs after yielding. In this study, two PC shear walls assembled by the “dry” connection technique, and one cast-in-place shear wall, were tested by means of quasi-static cyclic loading. The main purpose of the experiment was to systematically investigate the cyclic response of PC shear walls with varying types of vertical connection in the form of a friction-bearing device. The results showed that vertical bearing in devices, which mainly stems from the longitudinal elongation of PC wall panels, could enlarge the axial force of end column so that it provided an additional resistance moment. The PC shear wall with weak connection achieved ductile failure and second ascending branches on load-displacement relationship, i.e., secondary hardening, and the wall with strong vertical connection performed great moment capacity as well as tertiary hardening. Compared to cast-in-place walls, the peak load and cumulative hysteretic energy of PC shear walls increased by about 60% and 100%, respectively. A conceptual analysis of the multiple hardening phenomenon is presented based on experimental results.
Open AccessCyclic Behavior of Multiple Hardening Precast Concrete Shear Walls
Precast Concrete (PC) shear walls are becoming popular in building structures. With “wet” connection techniques, PC shear walls often behave like conventional cast-in-place walls, where hardening occurs after yielding. In this study, two PC shear walls assembled by the “dry” connection technique, and one cast-in-place shear wall, were tested by means of quasi-static cyclic loading. The main purpose of the experiment was to systematically investigate the cyclic response of PC shear walls with varying types of vertical connection in the form of a friction-bearing device. The results showed that vertical bearing in devices, which mainly stems from the longitudinal elongation of PC wall panels, could enlarge the axial force of end column so that it provided an additional resistance moment. The PC shear wall with weak connection achieved ductile failure and second ascending branches on load-displacement relationship, i.e., secondary hardening, and the wall with strong vertical connection performed great moment capacity as well as tertiary hardening. Compared to cast-in-place walls, the peak load and cumulative hysteretic energy of PC shear walls increased by about 60% and 100%, respectively. A conceptual analysis of the multiple hardening phenomenon is presented based on experimental results.
- 17 March 2022
- Published by Periodica Polytechnica Budapest University of Technology and Economics in Periodica Polytechnica Civil Engineering
- Vol. 66 (2) , 614-626
Seismic Performance and Reliability Evaluation of Ductile RC Frame Structures with Infills
Ductile RC frames are often considered to have superior seismic performance even with infills. However, the seismic performance of this type of structure needs to be reassessed considering the additional shear requirements produced by the infills-column interaction and the increased seismic hazard due to the impact of infills on the vibration period of the structure. This paper presents a performance-based earthquake engineering framework aimed at the assessment of the comprehensive seismic performance of ductile RC frames with infills. A series of common configurations are considered in the analysis: bare frame (BF), upper-infilled frame (UIF), all-infilled frame (AIF), and corresponding stirrup-reduction frames with both infills-induced shear failure behavior of column and influence of structural vibration period considered. The results show that infills changed the failure modes and dynamic characteristics of ductile structures and shear failure occurs in all-infilled frame columns. Even though the all-infilled frame meets the shear requirement, its collapse probability is higher than the bare frame due to the high seismic hazard caused by a shorter vibration period.
- 17 March 2022
- Published by Periodica Polytechnica Budapest University of Technology and Economics in Periodica Polytechnica Civil Engineering
- Vol. 66 (2) , 614-626
Seismic Performance and Reliability Evaluation of Ductile RC Frame Structures with Infills
Ductile RC frames are often considered to have superior seismic performance even with infills. However, the seismic performance of this type of structure needs to be reassessed considering the additional shear requirements produced by the infills-column interaction and the increased seismic hazard due to the impact of infills on the vibration period of the structure. This paper presents a performance-based earthquake engineering framework aimed at the assessment of the comprehensive seismic performance of ductile RC frames with infills. A series of common configurations are considered in the analysis: bare frame (BF), upper-infilled frame (UIF), all-infilled frame (AIF), and corresponding stirrup-reduction frames with both infills-induced shear failure behavior of column and influence of structural vibration period considered. The results show that infills changed the failure modes and dynamic characteristics of ductile structures and shear failure occurs in all-infilled frame columns. Even though the all-infilled frame meets the shear requirement, its collapse probability is higher than the bare frame due to the high seismic hazard caused by a shorter vibration period.
- 8 November 2018
- Published by SAGE Publications in Advances in Structural Engineering
- Vol. 22 (5) , 1211-1224
Lateral load behaviour of a rectangular precast shear wall involving vertical bolted connections
This article is concerned about precast reinforced concrete shear walls and the methods of assembling shear wall panels to form a reliable load transfer system. An assembling method is proposed using dry connection through an H-shaped steel connector (H-connector) and high-strength bolts. A preliminary design, including the H-connector design and bolt design, has been carried out based on the force analysis on the vertical connection in the wall assembly. On the basis of the finite element analysis verified by an experimental study, the preliminary design has been confirmed and a monolithic coefficient (ζ) has been used to evaluate the cooperative working performance of the two parallel shear walls. Then this article continues to carry out a finite element parametric study on the mechanical behaviour of the precast reinforced concrete shear walls with varying parameters, which includes the bolt specification, the frictional coefficient on the contact surface within the bolted connection and the thickness of the H-connector flange. The lateral load bearing capacity, lateral stiffness and cooperative working performance of the wall assemblies involving these varying parameters have been broadly analysed.
- 8 November 2018
- Published by SAGE Publications in Advances in Structural Engineering
- Vol. 22 (5) , 1211-1224
Lateral load behaviour of a rectangular precast shear wall involving vertical bolted connections
This article is concerned about precast reinforced concrete shear walls and the methods of assembling shear wall panels to form a reliable load transfer system. An assembling method is proposed using dry connection through an H-shaped steel connector (H-connector) and high-strength bolts. A preliminary design, including the H-connector design and bolt design, has been carried out based on the force analysis on the vertical connection in the wall assembly. On the basis of the finite element analysis verified by an experimental study, the preliminary design has been confirmed and a monolithic coefficient (ζ) has been used to evaluate the cooperative working performance of the two parallel shear walls. Then this article continues to carry out a finite element parametric study on the mechanical behaviour of the precast reinforced concrete shear walls with varying parameters, which includes the bolt specification, the frictional coefficient on the contact surface within the bolted connection and the thickness of the H-connector flange. The lateral load bearing capacity, lateral stiffness and cooperative working performance of the wall assemblies involving these varying parameters have been broadly analysed.
- 14 September 2018
- Published by Wiley in Structural Concrete
- Vol. 20 (1) , 282-295
Experimental study and associated mechanism analysis of horizontal bolted connections involved in a precast concrete shear wall system
This paper is concerned about the lateral load response and associated working mechanism of a precast reinforced concrete shear wall involving horizontal connections. An assembling method is proposed using dry connection through a horizontal steel connector (H‐connector) and high strength bolts. To investigate the effectiveness of such an assembling method, two identical wall‐connector assembly specimens have been constructed and tested under monotonic loading and cyclic loading, respectively, while subjected to a constant vertical compression. The test results showed that the performance of the shear wall assembly was generally satisfactory in terms of ensuring the full development of the shear wall strength and ductility. To assist in the interpretation of the experimental results and enable further study on the design approach, a detailed mechanism analysis has been subsequently conducted. The stress in H‐connector flange and shear force transferred through each high strength bolt has been deduced on the basis of mechanism analysis. The further sliding analysis within the bolted connections agrees well with the experimental results and therefore confirms the derived formulae for H‐connector and high strength bolt.
- 14 September 2018
- Published by Wiley in Structural Concrete
- Vol. 20 (1) , 282-295
Experimental study and associated mechanism analysis of horizontal bolted connections involved in a precast concrete shear wall system
This paper is concerned about the lateral load response and associated working mechanism of a precast reinforced concrete shear wall involving horizontal connections. An assembling method is proposed using dry connection through a horizontal steel connector (H‐connector) and high strength bolts. To investigate the effectiveness of such an assembling method, two identical wall‐connector assembly specimens have been constructed and tested under monotonic loading and cyclic loading, respectively, while subjected to a constant vertical compression. The test results showed that the performance of the shear wall assembly was generally satisfactory in terms of ensuring the full development of the shear wall strength and ductility. To assist in the interpretation of the experimental results and enable further study on the design approach, a detailed mechanism analysis has been subsequently conducted. The stress in H‐connector flange and shear force transferred through each high strength bolt has been deduced on the basis of mechanism analysis. The further sliding analysis within the bolted connections agrees well with the experimental results and therefore confirms the derived formulae for H‐connector and high strength bolt.
- 5 February 2016
- Published by Wiley in The Structural Design of Tall and Special Buildings
- Vol. 25 (13) , 659-678
Experimental study and associated numerical simulation of horizontally connected precast shear wall assembly
Summary: This paper is concerned about precast reinforced concrete shear walls and the methods of assembling shear wall panels to form a reliable load transfer system. An assembling method is proposed using dry connection through a horizontal steel connector (H‐connector) and high‐strength bolts. To investigate the effectiveness and the design of such a connection method, three wall‐connector assembly specimens with different connection details have been constructed and tested under monotonic loading while subjected to a constant vertical compression. The test results provided comprehensive data regarding the progressive transition of the load transfer mechanisms and showed that the performance of the shear wall assembly was generally satisfactory in terms of ensuring the full development of the shear wall strength and ductility. To assist in the interpretation of the experimental results and enable further parametric analysis, a detailed finite element model has been developed with incorporation of the main load transfer mechanisms, in addition to the description of the nonlinear behavior of the shear wall. The finite element model has been verified to represent well the actual behavior of the shear wall assembly, and it has provided further insight into the occurrence of slippage at the connection, the development of the bearing resistance of the bolts and the compression load transfer through contact in the later stage of the response. Copyright © 2016 John Wiley & Sons, Ltd.
- 5 February 2016
- Published by Wiley in The Structural Design of Tall and Special Buildings
- Vol. 25 (13) , 659-678
Experimental study and associated numerical simulation of horizontally connected precast shear wall assembly
Summary: This paper is concerned about precast reinforced concrete shear walls and the methods of assembling shear wall panels to form a reliable load transfer system. An assembling method is proposed using dry connection through a horizontal steel connector (H‐connector) and high‐strength bolts. To investigate the effectiveness and the design of such a connection method, three wall‐connector assembly specimens with different connection details have been constructed and tested under monotonic loading while subjected to a constant vertical compression. The test results provided comprehensive data regarding the progressive transition of the load transfer mechanisms and showed that the performance of the shear wall assembly was generally satisfactory in terms of ensuring the full development of the shear wall strength and ductility. To assist in the interpretation of the experimental results and enable further parametric analysis, a detailed finite element model has been developed with incorporation of the main load transfer mechanisms, in addition to the description of the nonlinear behavior of the shear wall. The finite element model has been verified to represent well the actual behavior of the shear wall assembly, and it has provided further insight into the occurrence of slippage at the connection, the development of the bearing resistance of the bolts and the compression load transfer through contact in the later stage of the response. Copyright © 2016 John Wiley & Sons, Ltd.
- 9 July 2015
- Published by Springer Nature in Science China Technological Sciences
- Vol. 58 (8) , 1439-1448
Experimental and analytical studies on the deformability of a precast RC shear wall involving bolted connections
- 9 July 2015
- Published by Springer Nature in Science China Technological Sciences
- Vol. 58 (8) , 1439-1448
Experimental and analytical studies on the deformability of a precast RC shear wall involving bolted connections
- 1 July 2015
- Published by SAGE Publications in Advances in Structural Engineering
- Vol. 18 (7) , 1071-1086
Experimental Verification of Vertical Joints in an Innovative Prefabricated Structural Wall System
In order to verify the viability of the new-type vertical joints (composed of high-strength bolts, connecting steel frames, embedded limbic steel frames, and steel sleeves) in an innovative prefabricated structural wall (IPSW) system, low-cyclic reversed loading tests (pseudo-static tests) were performed on two H-shaped test specimens fabricating from precast web wall panel and precast flange wall panels joined together through the novel vertical joints. On the basis of the loading procedure and test data, the global behavior (including failure modes, lateral stiffness, ductility, and energy-dissipating capacity) and the local performance (including the stress distribution in the connecting steel frames and the relative slippages between the connection components) of the test specimens were detailedly discussed and presented. The research results demonstrated that the connectors were strong enough for maintaining the web wall panel and flange wall panels work together as an entirety to resist lateral seismic force, no slippages occurred on the contact interfaces between the connecting steel frame and embedded limbic steel frame throughout the loading procedure, and the vertical shear stress at the midpoint of the connecting steel frame (close to zero) was far smaller than that at its lower end (still much less than its yield strength). This experimental research confirms the viability and reliability of the new-type vertical joints, although the configurations of the precast wall panel as well as the vertical joints need indispensable improving to optimize the seismic performance of the entire test specimen.
- 1 July 2015
- Published by SAGE Publications in Advances in Structural Engineering
- Vol. 18 (7) , 1071-1086
Experimental Verification of Vertical Joints in an Innovative Prefabricated Structural Wall System
In order to verify the viability of the new-type vertical joints (composed of high-strength bolts, connecting steel frames, embedded limbic steel frames, and steel sleeves) in an innovative prefabricated structural wall (IPSW) system, low-cyclic reversed loading tests (pseudo-static tests) were performed on two H-shaped test specimens fabricating from precast web wall panel and precast flange wall panels joined together through the novel vertical joints. On the basis of the loading procedure and test data, the global behavior (including failure modes, lateral stiffness, ductility, and energy-dissipating capacity) and the local performance (including the stress distribution in the connecting steel frames and the relative slippages between the connection components) of the test specimens were detailedly discussed and presented. The research results demonstrated that the connectors were strong enough for maintaining the web wall panel and flange wall panels work together as an entirety to resist lateral seismic force, no slippages occurred on the contact interfaces between the connecting steel frame and embedded limbic steel frame throughout the loading procedure, and the vertical shear stress at the midpoint of the connecting steel frame (close to zero) was far smaller than that at its lower end (still much less than its yield strength). This experimental research confirms the viability and reliability of the new-type vertical joints, although the configurations of the precast wall panel as well as the vertical joints need indispensable improving to optimize the seismic performance of the entire test specimen.
- 12 April 2015
- Published by Springer Nature in Journal of Central South University
- Vol. 22 (4) , 1536-1547
Seismic behavior and mechanism analysis of innovative precast shear wall involving vertical joints
- 12 April 2015
- Published by Springer Nature in Journal of Central South University
- Vol. 22 (4) , 1536-1547
Seismic behavior and mechanism analysis of innovative precast shear wall involving vertical joints