QWQingxiong Wu

Qingxiong Wu

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Qingxiong Wu has a total of 21 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Interface Force Transfer Mechanism of Internal Prestressing and Section Enlargement Composite Reinforcement in PC Box Girder Bridges

    by Qu Wang, Xiangyu Han, Ziming Fang, Qingxiong Wu, Qingwei Huang, Kangming Chen, Yi Xie

    To address issues such as web and bottom plate cracking and insufficient bending capacity in in-service prestressed concrete box girder bridges, this study proposes internal prestressing and section enlargement composite reinforcement. Firstly, taking a bridge of Shenhai Expressway as the background project, the combined reinforcement method is designed and the reinforcement effect is analyzed by MIDAS/Civil. Secondly, through numerical analysis, the influence of the bond shrinkage of self-compacting concrete with different mix ratios on the stress of the web of the original box girder is analyzed, and the interface between the new and old concrete is carried out. The analysis of the loss of the new prestress on the bonding surface of the new and old concrete is carried out by parameters such as the interface planting rate, the interface shear stiffness and the reinforcement structure. Furthermore, the theoretical calculation method of prestress loss rate of new and old concrete bonding interface is obtained. The results show that the flexural capacity of the normal section of the main beam is significantly improved after reinforcement, and the surplus coefficient is 1.18, which meets the requirements of the secondary safety level, and the mid-span deflection is improved by 34.28%, which verifies the effectiveness and feasibility of the combined reinforcement method. When the content of fly ash is 54%, the bond shrinkage strain and shrinkage stress of self-compacting concrete are reduced to the lowest level, which has the least influence on the existing box girder structure. It is suggested that the reinforcement ratio between the new and old concrete interface is 0.6%, and the interface roughness is 0.9 mm, which can increase the shear resistance of the new and old concrete interface and effectively reduce the transfer loss of prestress at the interface. Error analysis shows that the proposed semi-empirical calculation method has high accuracy with a deviation of less than 10%.


  • Mechanical behavior analysis of concrete girder bridges widened by partial splicing method

    by Qu Wang, Binbin Zhou, Qingxiong Wu, Kangming Chen, Daoqiang Lai, Zhijun Liang

    This study focuses on long‐connected concrete continuous girder bridges where the superstructures of new and old bridges are integrated while their substructures remain separate. A three‐dimensional Finite Element model was developed to analyze the effects of long‐term loads such as concrete shrinkage, creep, and temperature variations along both longitudinal and transverse directions. To expedite construction, a novel partial splicing method and a new structural splicing type were introduced and tested through full‐scale model experiments. Concrete shrinkage, creep, temperature gradients, and overall temperature changes were identified as the most influential factors affecting the displacement of long‐connected bridges. Concrete shrinkage contributes the largest proportion to transverse displacement in widened long‐connected bridges' supports, accounting for up to 68.58%. The new partial splicing method, designed to reduce widening time effectively, involves symmetrically splicing main girders of new and old bridges through in situ wet joints from the middle towards both sides, leaving the ends non‐splicing. In the full‐scale model experiment of rectangular steel plate, under medium and biased vehicle loads equivalent to 140 kN (twice the weight of Class I‐highway vehicles in China), no cracking or crushing occurred at the connection between the steel plate and girder flange throughout the loading process, with or without bridge deck pavement, confirming the rationality and effectiveness of the proposed rectangular steel plate for the non‐splicing section.


  • Open Access

    Research on the Fatigue Performance of Composite Girders with CSW and ST Truss

    by Hanhui Huang, Kangming Chen, Qingxiong Wu, Shozo Nakamura

    To study the fatigue performance of a composite girder with corrugated steel web (CSW) and steel tube (ST) truss, based on an engineering object, a test and finite element (FE) analysis were carried out. The fatigue failure mode and the sensitivities of the hot spot stress to the geometric parameters of the composite girder above were studied. The position with the maximum hot spot stress and the fatigue crack position were discussed and determined. Furthermore, a fatigue life evaluation method was discussed. It was found that linear extrapolation was applicable to finding the hot spot stress. The fatigue performance evolution comprised three stages, including initiation, expansion, and failure of the fatigue crack. The fatigue crack initiation stage accounted for about 95.6% of its fatigue life, and the fatigue crack was opening type I. The maximum hot spot stress emerged at the endpoint of the inclined web of CSW (point S). The main reason for the behavior was that the inclined web had a small out-of-plane flexural stiffness but had to bear an out-of-plane bending moment. Moreover, for the same section of the CSW, the hot spot stress on the molding side was less than that on the non-molding side. The hot spot stress exhibited negative correlations with the chord diameter, chord thickness, and bend radius, meanwhile, it had the highest sensitivity to the chord diameter. The existing S-N curves were not suitable to evaluate the fatigue life of the composite girder with CSW and ST truss. Since the intersecting weld between the CSW and the chord was located in longitudinal welded joints, the hot spot stress method suggested adopting the basic fatigue strength of 100 MPa, corresponding to 2,000,000 load cycles. Meanwhile, an empirical calculation model of the S-N curve for the composite girder with CSW and ST truss was created.


  • Open Access

    Test of Broken Suspender Specimen and Equivalent Static Calculation Method for Half-Through and Through Concrete-Filled Steel Tubular Arch Bridges

    by Kangming Chen, Jianping Luo, Qingxiong Wu, Huanwei Wang

    In response to the frequent collapse of main girders caused by the breakage of suspenders on half-through and through arch bridges, a test specimen has been designed and fabricated with a through concrete-filled steel tube (CFST) arch bridge as the engineering background. A new electromagnetic disconnect trigger is employed to realize the rapid suspender breakage in the test specimen. Dynamic response tests of the residual structure of the arch bridge after suspender failures employing the test specimen have been carried out. A finite element model accounting for the suspender breakage dynamic process has been constructed by implementing ANSYS/LS-DYNA, and the results of the test and finite element analysis are compared. In order to simplify the dynamic response calculation process of the residual structure after hanger failures, the dynamic coefficient is introduced, and an equivalent static calculation method (ESCM) considering the dynamic effect of the suspender fracture is presented. Eleven kinds of CFST standard arch bridges with different spans are constructed, the static and dynamic effects of the standard arch bridge with various dynamic coefficients are compared, and then their corresponding dynamic coefficients for various suspender fractures are determined. The obtained results reveal that the proposed electromagnetic suspender breakage trigger can realize the hanger fracturing within 0.1 s, which accurately simulates the fracture process of an actual bridge suspender, and the influence on the value of the dynamic coefficient can be ignored when the duration for suspender fracture is less than or equal to 0.15 s. The influence of suspender fracture on the displacement and stress of the longitudinal beam is more notable than those of the arch rib. In particular, the long suspender breakage has the highest influence on the displacement and stress of the longitudinal beam and arch rib. The fracture of the second short suspender has a remarkable impact on the suspender force of the adjacent hanger. When the ESCM is utilized to assess the mechanical behavior of the half-through and through CFST arch bridge, the dynamic coefficients of the longitudinal beam (suspender) were evaluated to be, conservatively, 1.8 (1.8) and 1.8 (1.7), respectively.


  • Failure mechanism and load carrying capacity of an arched partially CFST bridge tower considering different concrete filling lengths

    by Yan Xu, Bo Li, Qingxiong Wu, Huihui Yuan

    The Partially Concrete Filled Steel Tube (PCFST) structure has gradually been applied to bridges as the main load carrying components in recent years, owing to the advantages of light weight and high stability. The failure mechanism and load carrying capacity of PCFST structure highly depends on the concrete filling ratio. For this purpose, the failure mechanism and parametric analysis of a single arched PCFST cable stayed bridge tower are investigated by using both refined solid element simulation and quasi-static experiment. The results shows that the PCFST arched tower experiences asymmetrical instability failure subjected to quarter span symmetrical loading, and the plastic hinges appears firstly at the tower arch closely above the tower columns, and then the bottom of the tower columns, forming a rotating mechanism leading to the instability failure. Filling concrete or not will result in two opposite deforming propagations of the plastic hinges, and when the concrete filling length exceeds the length of plastic hinge, the initial rigidity and ultimate load carrying capacity of the PCFST structure will sharply increase. Finally, according to the results of the extended parametric analysis based on the real size simulation, an improved initial stress reduction coefficient of PCFST structure is then suggested.


  • Open Access

    Fatigue Performance Test and Numerical Analysis of Composite Girders with CSW-CFST Truss Chords

    by Hanhui Huang, Kangming Chen, Qingxiong Wu, Shozo Nakamura

    Composite girders with corrugated steel webs and concrete-filled steel tubular (CSW-CFST) truss chords are a new type of structure and have been used in bridges. To study the fatigue performance of these composite girders, model tests and numerical analysis were conducted, and the results compared with those for composite girders with corrugated steel webs and steel tubular (CSW-ST) truss chords. The results indicated that concrete-filling the chords constrained chord radial deformation and relieved hot-spot stress in the intersecting weld zones of composite girders with CSW-ST truss chords by 18.5–60.1%. The crack growth rates along both depth and length directions in composite girders with CSW-CFST truss chords were lower than those of composite girders with CSW-ST truss chords during the crack propagation and failure stages. Under the same fatigue load, concrete-filling the chords increased the fatigue life of composite girders with CSW-ST truss chords by 61.5%. Under the condition that there is no fatigue design S-N curve, the fatigue design S-N curve given in API can be used to evaluate the fatigue life of composite girders with CSW-CFST truss chords with a deviation of less than 17.4%.