Nils J. Gransberg
Research Subjects
Nils J. Gransberg has a total of 3 co-authors. Here are the top co-authors by number of shared publications:
- Douglas D. Gransberg
President, Gransberg & Associates, Inc., P.O. Box 2395, Norman, OK 73070. ORCID:
2 shared publications Marko Pala
Stanton Construction Services, Inc
1 shared publicationSafa Maraqa
Director, Data Science Analytics, Gransberg and Associates, LLC, PO Box 2395, Norman, OK 73070-2395
1 shared publication
Latest Publications
- 1 February 2022
- Published by American Society of Civil Engineers (ASCE) in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
- Vol. 14 (1) , 04521042
Leveraging the Value of Project Scope Growth through Construction Manager-at-Risk Delivery of Public University Capital Improvement Projects
When capital improvement project final costs exceed initial estimates, the overrun is assumed to be an indication of poor performance. However, when a project owner adds scope at any point after the initial estimate, the value of the project is enhanced, even though the numbers are interpreted in a negative light. This paper explores the idea that construction manager-at-risk (CMR) delivery provides a level of contractual flexibility that is not available in traditional design-bid-build (DBB) contracts and, consequently, lends itself to projects in which additional funding may become available after contract award and facilitates the efficient use of such funds in a manner not available in DBB-delivered projects. This study reviewed the cost performance of 166 CMR and DBB projects completed by 23 American public universities valued at over $3 billion from 2018 to 2019. The study found that cost growth in university CMR projects was greater than in similar DBB projects, contradicting the conclusions of most of the literature on CMR. The analysis of a second sample of 86 projects, which individually compared DBB projects with similar CMR projects, found that CMR project design fee efficiency was double that of DBB. The first contribution of this study is the provision of an objective metric for differentiating between owner-driven scope cost growth and cost growth due to other reasons; the second contribution is the finding that the contractual flexibility inherent to CMR project delivery adds value for money by allowing a university to expeditiously obligate new sources of funding, such as donations.
- 1 February 2022
- Published by American Society of Civil Engineers (ASCE) in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
- Vol. 14 (1) , 04521042
Leveraging the Value of Project Scope Growth through Construction Manager-at-Risk Delivery of Public University Capital Improvement Projects
When capital improvement project final costs exceed initial estimates, the overrun is assumed to be an indication of poor performance. However, when a project owner adds scope at any point after the initial estimate, the value of the project is enhanced, even though the numbers are interpreted in a negative light. This paper explores the idea that construction manager-at-risk (CMR) delivery provides a level of contractual flexibility that is not available in traditional design-bid-build (DBB) contracts and, consequently, lends itself to projects in which additional funding may become available after contract award and facilitates the efficient use of such funds in a manner not available in DBB-delivered projects. This study reviewed the cost performance of 166 CMR and DBB projects completed by 23 American public universities valued at over $3 billion from 2018 to 2019. The study found that cost growth in university CMR projects was greater than in similar DBB projects, contradicting the conclusions of most of the literature on CMR. The analysis of a second sample of 86 projects, which individually compared DBB projects with similar CMR projects, found that CMR project design fee efficiency was double that of DBB. The first contribution of this study is the provision of an objective metric for differentiating between owner-driven scope cost growth and cost growth due to other reasons; the second contribution is the finding that the contractual flexibility inherent to CMR project delivery adds value for money by allowing a university to expeditiously obligate new sources of funding, such as donations.
- 1 February 2020
- Published by American Society of Civil Engineers (ASCE) in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
- Vol. 12 (1)
Public Project Construction Manager-at-Risk Contracts: Lessons Learned from a Comparison of Commercial and Infrastructure Projects
The primary benefits of construction manager-at-risk (CMAR) project delivery are associated with increasing the ultimate constructability of a project by bringing the construction contractor to the project during the design phase. This paper reports the results of a content analysis of 24 published CMAR case studies worth $5.4 billion in both the commercial and public infrastructure sectors and derives four lessons learned. The major finding was that owners must synchronize the clauses of design contracts with those of the preconstruction in order to promote the level of collaboration necessary to realize enhanced constructability. This study also found that engaging CMAR contractors as early as is practical, clearly defining the deliverables they will produce during preconstruction, and limiting the cost component of best value selections to only CMAR fees facilitates project success. This paper’s major contribution is in comparing commercial and infrastructure CMAR projects and finding common lessons learned.
- 1 February 2020
- Published by American Society of Civil Engineers (ASCE) in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
- Vol. 12 (1)
Public Project Construction Manager-at-Risk Contracts: Lessons Learned from a Comparison of Commercial and Infrastructure Projects
The primary benefits of construction manager-at-risk (CMAR) project delivery are associated with increasing the ultimate constructability of a project by bringing the construction contractor to the project during the design phase. This paper reports the results of a content analysis of 24 published CMAR case studies worth $5.4 billion in both the commercial and public infrastructure sectors and derives four lessons learned. The major finding was that owners must synchronize the clauses of design contracts with those of the preconstruction in order to promote the level of collaboration necessary to realize enhanced constructability. This study also found that engaging CMAR contractors as early as is practical, clearly defining the deliverables they will produce during preconstruction, and limiting the cost component of best value selections to only CMAR fees facilitates project success. This paper’s major contribution is in comparing commercial and infrastructure CMAR projects and finding common lessons learned.