Christian A. Braudrick
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Christian A. Braudrick has a total of 17 co-authors. Here are the top co-authors by number of shared publications:
- Yantao Cui
Stillwater Sciences Berkeley California USA
4 shared publications Brian Cluer
NOAA Fisheries , 777 Sonoma Avenue, Santa Rosa, CA, 95404, USA
2 shared publicationsGary Parker
Department of Civil and Environmental Engineering and the Department of Geology , University of Illinois , Urbana, Illinois, USA
2 shared publicationsGordon E. Grant
2 shared publicationsBruce K. Orr
Senior Ecologist, Principal, Stillwater Sciences, 2855 Telegraph Ave., Suite 400, Berkeley, CA 94705
1 shared publicationGordon E Grant
1 shared publication
Latest Publications
- 1 September 2015
- Published by Elsevier in Geomorphology
- Vol. 244, 56-73
Swiftness of biomorphodynamics in Lilliput- to Giant-sized rivers and deltas
- 1 September 2015
- Published by Elsevier in Geomorphology
- Vol. 244, 56-73
Swiftness of biomorphodynamics in Lilliput- to Giant-sized rivers and deltas
- 1 May 2006
- Published by Taylor & Francis in Journal of Hydraulic Research
- Vol. 44 (3) , 291-307
Dam Removal Express Assessment Models (DREAM).
Many dams have been removed in the recent decades in the U.S. for reasons including economics, safety, and ecological rehabilitation. More dams are under consideration for removal; some of them are medium to large-sized dams filled with millions of cubic meters of sediment. Reaching a decision to remove a dam and deciding as how the dam should be removed, however, are usually not easy, especially for medium to large-sized dams. One of the major reasons for the difficulty in decision-making is the lack of understanding of the consequences of the release of reservoir sediment downstream, or alternatively the large expense if the sediment is to be removed by dredging. This paper summarizes the Dam Removal Express Assessment Models (DREAM) developed at Stillwater Sciences, Berkeley, California for simulation of sediment transport following dam removal. There are two models in the package: DREAM-1 simulates sediment transport following the removal of a dam behind which the reservoir deposit is composed primarily of non-cohesive sand and silt, and DREAM-2 simulates sediment transport following the removal of a dam behind which the upper layer of the reservoir deposit is composed primarily of gravel. Both models are one-dimensional and simulate cross-sectionally and reach averaged sediment aggradation and degradation following dam removal. DREAM-1 is validated with a set of laboratory experiments; its reservoir erosion module is applied to the Lake Mills drawdown experiment. DREAM-2 is validated with the field data for a natural landslide. Sensitivity tests are conducted with a series of sample runs in the companion paper, Cui et al. (2006), to validate some of the assumptions in the model and to provide guidance in field data collection in actual dam removal projects.
- 1 May 2006
- Published by Taylor & Francis in Journal of Hydraulic Research
- Vol. 44 (3) , 291-307
Dam Removal Express Assessment Models (DREAM).
Many dams have been removed in the recent decades in the U.S. for reasons including economics, safety, and ecological rehabilitation. More dams are under consideration for removal; some of them are medium to large-sized dams filled with millions of cubic meters of sediment. Reaching a decision to remove a dam and deciding as how the dam should be removed, however, are usually not easy, especially for medium to large-sized dams. One of the major reasons for the difficulty in decision-making is the lack of understanding of the consequences of the release of reservoir sediment downstream, or alternatively the large expense if the sediment is to be removed by dredging. This paper summarizes the Dam Removal Express Assessment Models (DREAM) developed at Stillwater Sciences, Berkeley, California for simulation of sediment transport following dam removal. There are two models in the package: DREAM-1 simulates sediment transport following the removal of a dam behind which the reservoir deposit is composed primarily of non-cohesive sand and silt, and DREAM-2 simulates sediment transport following the removal of a dam behind which the upper layer of the reservoir deposit is composed primarily of gravel. Both models are one-dimensional and simulate cross-sectionally and reach averaged sediment aggradation and degradation following dam removal. DREAM-1 is validated with a set of laboratory experiments; its reservoir erosion module is applied to the Lake Mills drawdown experiment. DREAM-2 is validated with the field data for a natural landslide. Sensitivity tests are conducted with a series of sample runs in the companion paper, Cui et al. (2006), to validate some of the assumptions in the model and to provide guidance in field data collection in actual dam removal projects.
- 1 May 2006
- Published by Taylor & Francis in Journal of Hydraulic Research
- Vol. 44 (3) , 308-323
Dam Removal Express Assessment Models (DREAM)
This paper presents sample runs of the Dam Removal Express Assessment Models (DREAM) presented in the companion paper, Cui et al. (2006): DREAM-1 for simulation of sediment transport following the removal of a dam behind which the reservoir deposit is composed primarily of noncohesive sand and silt, and DREAM-2 for simulation of sediment transport following the removal of a dam behind which the upper layer of the reservoir deposit is composed primarily of gravel. The primary purposes of the sample runs presented here are to validate some of the assumptions used in the model and to provide guidance as how accurately the field data should be collected. Sample runs indicate that grain size distribution of the reservoir sediment deposit is the most important piece of information needed during the field campaign. Other than the grain size distribution of the reservoir sediment deposit, errors within a reasonable range in other parameters do not result in significant variations in the predicted depositional patterns downstream of the dam, although different magnitudes of sediment deposition may result from such errors. Sample runs also indicate that when the reservoir deposit is composed primarily of gravel, sediment deposition downstream of the dam following dam removal may not propagate far downstream of the dam, and may be limited to isolated reaches where sediment transport capacity is low. Farther downstream sediment deposition becomes progressively smaller due to the attenuation of sediment transport and gravel abrasion. When the reservoir deposit is primarily fine sediment, however, there may be more extensive sediment deposition (both larger area and higher magnitude) downstream of the dam following dam removal. Dredging part of the sediment in advance reduces the downstream impact due to the reduced volume, and the extra distance provided by dredging allows for attenuation of sediment transport. Sample runs with staged dam removal indicate that it provides only limited benefit compared to a one-time removal in case the reservoir deposit is composed primarily of coarse sediment, but may provide significant benefits in case the reservoir deposit is composed primarily of fine sediment. The benefits of a staged removal for the latter case include reduced magnitude and area of deposition as well as reduced suspended sediment concentration downstream of the dam.
- 1 May 2006
- Published by Taylor & Francis in Journal of Hydraulic Research
- Vol. 44 (3) , 308-323
Dam Removal Express Assessment Models (DREAM)
This paper presents sample runs of the Dam Removal Express Assessment Models (DREAM) presented in the companion paper, Cui et al. (2006): DREAM-1 for simulation of sediment transport following the removal of a dam behind which the reservoir deposit is composed primarily of noncohesive sand and silt, and DREAM-2 for simulation of sediment transport following the removal of a dam behind which the upper layer of the reservoir deposit is composed primarily of gravel. The primary purposes of the sample runs presented here are to validate some of the assumptions used in the model and to provide guidance as how accurately the field data should be collected. Sample runs indicate that grain size distribution of the reservoir sediment deposit is the most important piece of information needed during the field campaign. Other than the grain size distribution of the reservoir sediment deposit, errors within a reasonable range in other parameters do not result in significant variations in the predicted depositional patterns downstream of the dam, although different magnitudes of sediment deposition may result from such errors. Sample runs also indicate that when the reservoir deposit is composed primarily of gravel, sediment deposition downstream of the dam following dam removal may not propagate far downstream of the dam, and may be limited to isolated reaches where sediment transport capacity is low. Farther downstream sediment deposition becomes progressively smaller due to the attenuation of sediment transport and gravel abrasion. When the reservoir deposit is primarily fine sediment, however, there may be more extensive sediment deposition (both larger area and higher magnitude) downstream of the dam following dam removal. Dredging part of the sediment in advance reduces the downstream impact due to the reduced volume, and the extra distance provided by dredging allows for attenuation of sediment transport. Sample runs with staged dam removal indicate that it provides only limited benefit compared to a one-time removal in case the reservoir deposit is composed primarily of coarse sediment, but may provide significant benefits in case the reservoir deposit is composed primarily of fine sediment. The benefits of a staged removal for the latter case include reduced magnitude and area of deposition as well as reduced suspended sediment concentration downstream of the dam.
- 13 July 2005
- Published by American Society of Civil Engineers (ASCE)
- p. 1-12
Preliminary Assessment of Sediment Transport Dynamics Following Dam Removal: A Case Study
Prediction of sediment transport dynamics following dam removal usually requires extensive field data, the collection of which requires both resources and time. Certain management decisions regarding dam removal, however, may be required before resources may be allocated to provide sufficient data to evaluate whether dam removal is a viable option. Here, we present a case study and demonstrate that some aspects of the sediment transport characteristics following dam removal can be evaluated with very limited information. The case study in question involves J.C. Boyle, Copco, and Iron Gate Dams on the Klamath River, California which together have an estimated 12 million m3 of sediment deposited in their reservoirs. With a reconnaissance field observation and upon examination of the very limited existing field data, we determined that it is possible to evaluate the potential for sediment deposition downstream of the dam following the removal of the dams under the worst-case-scenario assumptions. The evaluation was carried out with the help of DREAM-1, one of the Dam Removal Express Assessment Models developed at Stillwater Sciences. Results of the assessment indicate that potential sediment deposition would occur only for a brief period within approximately 10 km downstream of the dam with a maximum thickness of sediment deposition no more than 1.2 m.
- 13 July 2005
- Published by American Society of Civil Engineers (ASCE)
- p. 1-12
Preliminary Assessment of Sediment Transport Dynamics Following Dam Removal: A Case Study
Prediction of sediment transport dynamics following dam removal usually requires extensive field data, the collection of which requires both resources and time. Certain management decisions regarding dam removal, however, may be required before resources may be allocated to provide sufficient data to evaluate whether dam removal is a viable option. Here, we present a case study and demonstrate that some aspects of the sediment transport characteristics following dam removal can be evaluated with very limited information. The case study in question involves J.C. Boyle, Copco, and Iron Gate Dams on the Klamath River, California which together have an estimated 12 million m3 of sediment deposited in their reservoirs. With a reconnaissance field observation and upon examination of the very limited existing field data, we determined that it is possible to evaluate the potential for sediment deposition downstream of the dam following the removal of the dams under the worst-case-scenario assumptions. The evaluation was carried out with the help of DREAM-1, one of the Dam Removal Express Assessment Models developed at Stillwater Sciences. Results of the assessment indicate that potential sediment deposition would occur only for a brief period within approximately 10 km downstream of the dam with a maximum thickness of sediment deposition no more than 1.2 m.
- 1 December 2001
- Published by Elsevier in Geomorphology
- Vol. 41 (4) , 263-283
Transport and deposition of large woody debris in streams: a flume experiment
- 1 December 2001
- Published by Elsevier in Geomorphology
- Vol. 41 (4) , 263-283
Transport and deposition of large woody debris in streams: a flume experiment
- 1 February 2000
- Published by American Geophysical Union (AGU) in Water Resources Research
- Vol. 36 (2) , 571-583
When do logs move in rivers?
Large woody debris is an integral component of forested, fluvial systems throughout the world, yet we know little about hydraulic thresholds for movement and transport of logs. We developed theoretical models of entrainment and performed flume experiments to examine thresholds for wood movement in streams. Both the model and the experiments indicate that log entrainment is primarily a function of the piece angle relative to flow direction, whether or not the log had a rootwad, the density of the log, and the piece diameter. Stability increased if the pieces had rootwads or were rotated parallel to flow. Although previously reported as the most important factor in piece stability, piece length did not significantly affect the threshold of movement in our experiments or our physically based model, for logs shorter than channel width. These physically based models offer a first‐order approach to evaluating the stability of either naturally derived woody debris or material deliberately introduced to streams for various management objectives.
- 1 February 2000
- Published by American Geophysical Union (AGU) in Water Resources Research
- Vol. 36 (2) , 571-583
When do logs move in rivers?
Large woody debris is an integral component of forested, fluvial systems throughout the world, yet we know little about hydraulic thresholds for movement and transport of logs. We developed theoretical models of entrainment and performed flume experiments to examine thresholds for wood movement in streams. Both the model and the experiments indicate that log entrainment is primarily a function of the piece angle relative to flow direction, whether or not the log had a rootwad, the density of the log, and the piece diameter. Stability increased if the pieces had rootwads or were rotated parallel to flow. Although previously reported as the most important factor in piece stability, piece length did not significantly affect the threshold of movement in our experiments or our physically based model, for logs shorter than channel width. These physically based models offer a first‐order approach to evaluating the stability of either naturally derived woody debris or material deliberately introduced to streams for various management objectives.
- 1 July 1997
- Published by Wiley in Earth Surface Processes and Landforms
- Vol. 22 (7) , 669-683
Dynamics of Wood Transport in Streams: A Flume Experiment
- 1 July 1997
- Published by Wiley in Earth Surface Processes and Landforms
- Vol. 22 (7) , 669-683
Dynamics of Wood Transport in Streams: A Flume Experiment