Vladimir Litvinov
Research Subjects
Vladimir Litvinov has a total of 19 co-authors. Here are the top co-authors by number of shared publications:
- Alla Toropenko
Odessa Polytechnic National University
1 shared publication - Andrey Pavlyshko
Odessa Polytechnic National University
1 shared publication - Andrii Koliada
Odessa National Polytechnic University
1 shared publication Andrii Moskaliuk
Odessa National Polytechnic University Shevchenka ave., 1, Odessa, Ukraine, 65044
1 shared publication- Giorgi Popkhadze
Georgian Technical University (GTU)
1 shared publication - Ihor Sydorenko
Odesa Polytechnic National University
1 shared publication
Latest Publications
- 8 July 2026
- Published by Springer Nature
- p. 326-333
Architectural Threat and Trust Models in Distributed Information Systems
- 8 July 2026
- Published by Springer Nature
- p. 326-333
Architectural Threat and Trust Models in Distributed Information Systems
- 31 August 2023
- Published by Springer Nature
- p. 38-47
Design of an Operator Interface for Controlling the Installation of Ion-Plasma Deposition
- 31 August 2023
- Published by Springer Nature
- p. 38-47
Design of an Operator Interface for Controlling the Installation of Ion-Plasma Deposition
- Open Access
- 2 March 2022
- Published by National Technical University Kharkiv Polytechnic Institute in Cutting & Tools in Technological System
- No. 96,p. 138-145
THE EFFECT OF ELASTIC RECOIL OF CLOSED-TYPE LIFTING ROPES AFTER THEIR MANUFACTURE AND DRAWING
A study was made of stresses and factors of internal forces in the elements of ropes of a closed structure during their manufacture. It is established that when twisting a rope of closed construction, its shaped wires suffer from bending deformation, twisting and stretching. In this case, the shaped wires are subjected to a complex load with the concomitant rotation of the axes of the stress tensor. The stresses in the elastic cross-sectional area of the rope wire are considered and its limit is determined for shaped cross-sections and for asymmetric shaped cross-sections. Formulas for approximate determination of tangential and normal stresses in the elements of a closed rope of non-circular profile are obtained: (wedge-shaped, zeta-shaped and x-shaped).
- 2 March 2022
- Published by National Technical University Kharkiv Polytechnic Institute in Cutting & Tools in Technological System
- No. 96,p. 138-145
Open AccessTHE EFFECT OF ELASTIC RECOIL OF CLOSED-TYPE LIFTING ROPES AFTER THEIR MANUFACTURE AND DRAWING
A study was made of stresses and factors of internal forces in the elements of ropes of a closed structure during their manufacture. It is established that when twisting a rope of closed construction, its shaped wires suffer from bending deformation, twisting and stretching. In this case, the shaped wires are subjected to a complex load with the concomitant rotation of the axes of the stress tensor. The stresses in the elastic cross-sectional area of the rope wire are considered and its limit is determined for shaped cross-sections and for asymmetric shaped cross-sections. Formulas for approximate determination of tangential and normal stresses in the elements of a closed rope of non-circular profile are obtained: (wedge-shaped, zeta-shaped and x-shaped).
- 22 February 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 222-227
Problems of Matrix Structures in the Components of Modern Computer Systems
This paper is devoted to the features of matrix schemes, which have a significant impact on the capabilities of modern computer systems, creating tangible problems for them. One of the main characteristics of modern computers is their productivity in terms of cost. This characteristic is considered taking into account the using rate of computer resources, including matrix elements. Another characteristic associated with the energy efficiency of matrix circuits is especially important for mobile and other autonomous systems, as well as energy-intensive structures, including data centers. The next problem is related to the influence of matrix structures on functional safety, which is supported by computer systems in the field of critical applications. The involvement of matrix structures in the problem of hidden faults is investigated. The results of experiments evaluating the energy consumption of matrix structures and the manifestation of hidden faults, as well as the reduction of negatives during matrix reduction using the example of iterative array multipliers, are discussed.
- 22 February 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 222-227
Problems of Matrix Structures in the Components of Modern Computer Systems
This paper is devoted to the features of matrix schemes, which have a significant impact on the capabilities of modern computer systems, creating tangible problems for them. One of the main characteristics of modern computers is their productivity in terms of cost. This characteristic is considered taking into account the using rate of computer resources, including matrix elements. Another characteristic associated with the energy efficiency of matrix circuits is especially important for mobile and other autonomous systems, as well as energy-intensive structures, including data centers. The next problem is related to the influence of matrix structures on functional safety, which is supported by computer systems in the field of critical applications. The involvement of matrix structures in the problem of hidden faults is investigated. The results of experiments evaluating the energy consumption of matrix structures and the manifestation of hidden faults, as well as the reduction of negatives during matrix reduction using the example of iterative array multipliers, are discussed.
- Open Access
- 21 August 2018
- Published by Private Company Technology Center in Eastern-European Journal of Enterprise Technologies
- Vol. 4 (3 (94)) , 6-13
Modification of the PERT method for project time evaluation taking into account unexpected delays
The PERT-based method for estimation of project implementation time, which uses Rayleigh distribution instead of β-distribution, was proposed. The modification of the PERT, which made it possible to involve the quality of an expert into the assessment and to simplify the examination procedure was proposed. We offered a new method for project evaluation, based on the properties of Rayleigh distribution and taking into consideration the peculiarities of plotting a network diagram in IT- projects with a high degree of work detailing in the face of the existing possibilities of extending the time of particular tasks. Three different methods project time evaluation, based on two different statistics and two different methods for calculation of project time, were compared. Comparison was performed with the view to search for the simplest method in terms of information acquisition and suitable for algorithmic implementation. It was shown that the estimation result is more consistent with specificity of complex IT-projects and makes it possible to reduce the number of iterations within project implementation time, as well as to use an objective assessment of the main sources of errors in determining time, giving evaluation with the probability that was assigned beforehand. It was shown that the estimate of the most probable and minimum time of project completion during the calculation by the new method is consistent with the results of the calculations using the PERT method, while the evaluation of maximum time differs strongly, as the new method is more pessimistic in this sense, and it matches better the characteristics of complex IT-projects that have a high probability of unexpected delays during implementation. We draw conclusions on the possible application of results in creation of a project time evaluation system based on the methods of artificial intelligence, and determined parameters for setting such a system.
- 21 August 2018
- Published by Private Company Technology Center in Eastern-European Journal of Enterprise Technologies
- Vol. 4 (3 (94)) , 6-13
Open AccessModification of the PERT method for project time evaluation taking into account unexpected delays
The PERT-based method for estimation of project implementation time, which uses Rayleigh distribution instead of β-distribution, was proposed. The modification of the PERT, which made it possible to involve the quality of an expert into the assessment and to simplify the examination procedure was proposed. We offered a new method for project evaluation, based on the properties of Rayleigh distribution and taking into consideration the peculiarities of plotting a network diagram in IT- projects with a high degree of work detailing in the face of the existing possibilities of extending the time of particular tasks. Three different methods project time evaluation, based on two different statistics and two different methods for calculation of project time, were compared. Comparison was performed with the view to search for the simplest method in terms of information acquisition and suitable for algorithmic implementation. It was shown that the estimation result is more consistent with specificity of complex IT-projects and makes it possible to reduce the number of iterations within project implementation time, as well as to use an objective assessment of the main sources of errors in determining time, giving evaluation with the probability that was assigned beforehand. It was shown that the estimate of the most probable and minimum time of project completion during the calculation by the new method is consistent with the results of the calculations using the PERT method, while the evaluation of maximum time differs strongly, as the new method is more pessimistic in this sense, and it matches better the characteristics of complex IT-projects that have a high probability of unexpected delays during implementation. We draw conclusions on the possible application of results in creation of a project time evaluation system based on the methods of artificial intelligence, and determined parameters for setting such a system.