Gülçağ Albayrak
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Gülçağ Albayrak has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Uğur Albayrak
Eskişehir Osmangazi Üniversitesi
8 shared publications - Mehmet Canbaz
Department of Civil Engineering, Eskisehir Osmangazi University, 26040 Eskisehir, Türkiye
2 shared publications - Ahmet Merter
ESKİŞEHİR OSMANGAZİ ÜNİVERSİTESİ, FEN BİLİMLERİ ENSTİTÜSÜ
1 shared publication Ilker Özdemir
Eskisehir Osmangazi University
1 shared publicationİlKer Ödemir
1 shared publicationİlKer Özdemir
1 shared publication
Latest Publications
- Open Access
- 22 September 2025
- Published by MDPI AG in Applied Sciences
- Vol. 15 (18) , 10295
Solving Construction Site Layout Planning as a Quadratic Assignment Problem Using the Advanced Jaya Algorithm
Construction site layout planning (CSLP) plays a pivotal role in determining the overall efficiency and cost-effectiveness of construction projects. Material handling operations, which constitute a significant portion of indirect project costs, heavily depend on the spatial arrangement of temporary facilities such as site offices, storage yards, and equipment zones. Poorly planned layouts can lead to excessive travel distances, increased material handling times, and operational delays, all of which contribute to inflated costs and reduced productivity. Therefore, optimizing the layout of construction sites to minimize transportation distances and enhance workflow is a critical task for project managers, contractors, and other stakeholders. The challenge in CSLP lies in the complexity of simultaneously satisfying multiple, often conflicting, requirements such as space constraints, safety regulations, and functional proximities. This complexity is compounded by the dynamic nature of construction activities and the presence of numerous facilities to be allocated within limited and irregularly shaped site boundaries. Mathematically, this problem can be formulated as a Quadratic Assignment Problem (QAP), a well-known NP-hard combinatorial optimization problem. The QAP seeks to assign a set of facilities to specific locations in a manner that minimizes the total cost, typically modeled as the sum of products of flows (e.g., material movement) and distances between assigned locations. However, due to the computational complexity of QAP, exact solutions become impractical for medium to large-scale site layouts. In recent years, metaheuristic algorithms have gained traction for effectively tackling such complex optimization problems. Among these, the Advanced Jaya Algorithm (A-JA), a recent population-based metaheuristic, stands out for its simplicity, parameter-free nature, and robust search capabilities. This study applies the A-JA to solve the CSLP modeled as a QAP, aiming to minimize the total weighted travel distance of material handling within the site. The algorithm’s performance is validated through two realistic case studies, showcasing its strong search capabilities and competitive results compared to traditional optimization methods. This promising approach offers a valuable decision-support tool for construction managers seeking to enhance site operational efficiency.
- 22 September 2025
- Published by MDPI AG in Applied Sciences
- Vol. 15 (18) , 10295
Open AccessSolving Construction Site Layout Planning as a Quadratic Assignment Problem Using the Advanced Jaya Algorithm
Construction site layout planning (CSLP) plays a pivotal role in determining the overall efficiency and cost-effectiveness of construction projects. Material handling operations, which constitute a significant portion of indirect project costs, heavily depend on the spatial arrangement of temporary facilities such as site offices, storage yards, and equipment zones. Poorly planned layouts can lead to excessive travel distances, increased material handling times, and operational delays, all of which contribute to inflated costs and reduced productivity. Therefore, optimizing the layout of construction sites to minimize transportation distances and enhance workflow is a critical task for project managers, contractors, and other stakeholders. The challenge in CSLP lies in the complexity of simultaneously satisfying multiple, often conflicting, requirements such as space constraints, safety regulations, and functional proximities. This complexity is compounded by the dynamic nature of construction activities and the presence of numerous facilities to be allocated within limited and irregularly shaped site boundaries. Mathematically, this problem can be formulated as a Quadratic Assignment Problem (QAP), a well-known NP-hard combinatorial optimization problem. The QAP seeks to assign a set of facilities to specific locations in a manner that minimizes the total cost, typically modeled as the sum of products of flows (e.g., material movement) and distances between assigned locations. However, due to the computational complexity of QAP, exact solutions become impractical for medium to large-scale site layouts. In recent years, metaheuristic algorithms have gained traction for effectively tackling such complex optimization problems. Among these, the Advanced Jaya Algorithm (A-JA), a recent population-based metaheuristic, stands out for its simplicity, parameter-free nature, and robust search capabilities. This study applies the A-JA to solve the CSLP modeled as a QAP, aiming to minimize the total weighted travel distance of material handling within the site. The algorithm’s performance is validated through two realistic case studies, showcasing its strong search capabilities and competitive results compared to traditional optimization methods. This promising approach offers a valuable decision-support tool for construction managers seeking to enhance site operational efficiency.
- Open Access
- 1 January 2025
- Published by Afyon Kocatepe Universitesi Fen Ve Muhendislik Bilimleri Dergisi in Afyon Kocatepe University Journal of Sciences and Engineering
- Vol. 25 (4) , 878-902
İnşaat Projelerinde Süre Uzatımının Hukuki ve Mühendislik Açılardan İncelenmesi
İnşaat sözleşmelerinde genel itibariyle, yüklenicinin taahhüt ettiği edimi yerine getirmesi için bir süre belirlenmektedir. Belirlenen inşaat süresi uzadıkça, işin tamamlanamama ihtimali de artmaktadır. Ülkemizde de inşaat projelerinin sıklıkla vadesinde bitmediği, bu durumda yüklenicilerin cezalı şekilde çalıştığı ya da sözleşmenin feshi ile karşı karşıya kalındığı bilinmektedir. En sıradan bakım-onarım işlerinden, daha karmaşık ve uzmanlık gerektiren hastane, okul, altyapı işlerine kadar her türden projenin teslim süresi hususunda yüklenici firma ile sorunlar yaşanabilmektedir. Bu noktada gecikmeye neden olan etkenlerin ortaya konulması önem kazanmaktadır. Çünkü bu şekilde yüklenici temerrüde düşebileceği gibi işin bitirilmesi için süre uzatımı hakkı da kazanabilmektedir. Süre uzatımına ilişkin talepler çoğu zaman taraflar arasında anlaşmazlıklar yaratmakta, bu durum hukuki süreçlerin uzamasına ve projenin aksamasına neden olmaktadır. Bu çalışmada özel sektörde 6098 Sayılı Türk Borçlar Kanunu hükümlerine tabi şekilde imzalanan inşaat sözleşmelerinde süre uzatımı kavramı ele alınmaktadır. Bu amaçla, ilgili mevzuatlar incelenmiş, sözleşme taraflarının sorumlulukları ve süre uzatımının koşulları ile hesabına yönelik hem hukuki hem de mühendislik çözümlerine yer verilmiştir. Ayrıca inşaat işlerinde uygulanan iş programı ve gecikme analizleri aracılığıyla süre uzatımı değerlendirilmiştir.
- 1 January 2025
- Published by Afyon Kocatepe Universitesi Fen Ve Muhendislik Bilimleri Dergisi in Afyon Kocatepe University Journal of Sciences and Engineering
- Vol. 25 (4) , 878-902
Open Accessİnşaat Projelerinde Süre Uzatımının Hukuki ve Mühendislik Açılardan İncelenmesi
İnşaat sözleşmelerinde genel itibariyle, yüklenicinin taahhüt ettiği edimi yerine getirmesi için bir süre belirlenmektedir. Belirlenen inşaat süresi uzadıkça, işin tamamlanamama ihtimali de artmaktadır. Ülkemizde de inşaat projelerinin sıklıkla vadesinde bitmediği, bu durumda yüklenicilerin cezalı şekilde çalıştığı ya da sözleşmenin feshi ile karşı karşıya kalındığı bilinmektedir. En sıradan bakım-onarım işlerinden, daha karmaşık ve uzmanlık gerektiren hastane, okul, altyapı işlerine kadar her türden projenin teslim süresi hususunda yüklenici firma ile sorunlar yaşanabilmektedir. Bu noktada gecikmeye neden olan etkenlerin ortaya konulması önem kazanmaktadır. Çünkü bu şekilde yüklenici temerrüde düşebileceği gibi işin bitirilmesi için süre uzatımı hakkı da kazanabilmektedir. Süre uzatımına ilişkin talepler çoğu zaman taraflar arasında anlaşmazlıklar yaratmakta, bu durum hukuki süreçlerin uzamasına ve projenin aksamasına neden olmaktadır. Bu çalışmada özel sektörde 6098 Sayılı Türk Borçlar Kanunu hükümlerine tabi şekilde imzalanan inşaat sözleşmelerinde süre uzatımı kavramı ele alınmaktadır. Bu amaçla, ilgili mevzuatlar incelenmiş, sözleşme taraflarının sorumlulukları ve süre uzatımının koşulları ile hesabına yönelik hem hukuki hem de mühendislik çözümlerine yer verilmiştir. Ayrıca inşaat işlerinde uygulanan iş programı ve gecikme analizleri aracılığıyla süre uzatımı değerlendirilmiştir.
- Open Access
- 31 December 2024
- Published by Adiyaman University in Adıyaman Üniversitesi Mühendislik Bilimleri Dergisi
- Vol. 11 (24) , 438-454
Metaheuristic Multi-Objective Optimization Approach for Repetitive Construction Project Scheduling
The optimization of schedules for repetitive projects is a crucial phase in establishing an effective project timeline concerning both duration and cost. This study presents an innovative metaheuristic multi-objective optimization model tailored for repetitive projects. Distinguished by its original features, this model empowers schedulers to identify an optimal schedule that concurrently minimizes project duration, total cost, and interruption time. It encompasses various constraints and factors, including learning and forgetting effects, inter-activity soft logic, limited work interruption allowances, multiple crew formations, multiple construction methods per activity, while retaining all Critical Path Method (CPM) scheduling capabilities. The effectiveness of this new approach was validated through application to two case studies, demonstrating its capability to deliver optimal schedules for repetitive projects with heightened accuracy in minimizing project duration, cost, and interruption. Furthermore, the integration of learning effects, soft logic, and work interruption allowances within the optimization process substantially reduced project duration and cost, thereby yielding more precise and dependable optimal solutions.
- 31 December 2024
- Published by Adiyaman University in Adıyaman Üniversitesi Mühendislik Bilimleri Dergisi
- Vol. 11 (24) , 438-454
Open AccessMetaheuristic Multi-Objective Optimization Approach for Repetitive Construction Project Scheduling
The optimization of schedules for repetitive projects is a crucial phase in establishing an effective project timeline concerning both duration and cost. This study presents an innovative metaheuristic multi-objective optimization model tailored for repetitive projects. Distinguished by its original features, this model empowers schedulers to identify an optimal schedule that concurrently minimizes project duration, total cost, and interruption time. It encompasses various constraints and factors, including learning and forgetting effects, inter-activity soft logic, limited work interruption allowances, multiple crew formations, multiple construction methods per activity, while retaining all Critical Path Method (CPM) scheduling capabilities. The effectiveness of this new approach was validated through application to two case studies, demonstrating its capability to deliver optimal schedules for repetitive projects with heightened accuracy in minimizing project duration, cost, and interruption. Furthermore, the integration of learning effects, soft logic, and work interruption allowances within the optimization process substantially reduced project duration and cost, thereby yielding more precise and dependable optimal solutions.
- 16 November 2024
- Published by Springer Nature in Sādhanā
- Vol. 49 (4) , 1-13
Evaluation of Advanced Jaya Algorithm in engineering design problems: a comparative study with recent metaheuristics
- 16 November 2024
- Published by Springer Nature in Sādhanā
- Vol. 49 (4) , 1-13
Evaluation of Advanced Jaya Algorithm in engineering design problems: a comparative study with recent metaheuristics
- Open Access
- 18 April 2023
- Published by Periodica Polytechnica Budapest University of Technology and Economics in Periodica Polytechnica Civil Engineering
- Vol. 67 (3) , 806-818
Optimizing of Discrete Time-cost Trade-off Problem in Construction Projects Using Advanced Jaya Algorithm
This paper proposes a novel algorithm to optimize the discrete time-cost trade-off problem (DTCTP) in construction projects. As DTCTP is assumed NP-hard, the new metaheuristic models are investigated to contribute for decision-making of project managers. DTCTP can be modelled as multi-mode to represent real-life problems more practical. According to the model, the project activities have at least two or more durations and cost alternative modes. For solving this problem effectively, a novel optimization metaheuristic method named Advanced Jaya Algorithm (A-JA) is proposed, which is generated from Jaya Algorithm (JA). The benchmark function tests are applied to verify the model with other well-known metaheuristic methods. The key weakness of the base algorithm JA is that, it has unstable solution accuracy and low likelihood of escaping local optimums. According to the results, A-JA considerably improves these areas. Two case studies of DTCTP are carried out after verification to demonstrate the effectiveness and efficiency of the proposed algorithm in comparison with JA and three well-known methods. The results of A-JA are found to be more powerful than the base algorithm JA and the benchmark algorithms. The proposed method achieves the Pareto fronts to help decision makers to make trade-off between the objectives and choose the optimum solution considering on their preference.
- 18 April 2023
- Published by Periodica Polytechnica Budapest University of Technology and Economics in Periodica Polytechnica Civil Engineering
- Vol. 67 (3) , 806-818
Open AccessOptimizing of Discrete Time-cost Trade-off Problem in Construction Projects Using Advanced Jaya Algorithm
This paper proposes a novel algorithm to optimize the discrete time-cost trade-off problem (DTCTP) in construction projects. As DTCTP is assumed NP-hard, the new metaheuristic models are investigated to contribute for decision-making of project managers. DTCTP can be modelled as multi-mode to represent real-life problems more practical. According to the model, the project activities have at least two or more durations and cost alternative modes. For solving this problem effectively, a novel optimization metaheuristic method named Advanced Jaya Algorithm (A-JA) is proposed, which is generated from Jaya Algorithm (JA). The benchmark function tests are applied to verify the model with other well-known metaheuristic methods. The key weakness of the base algorithm JA is that, it has unstable solution accuracy and low likelihood of escaping local optimums. According to the results, A-JA considerably improves these areas. Two case studies of DTCTP are carried out after verification to demonstrate the effectiveness and efficiency of the proposed algorithm in comparison with JA and three well-known methods. The results of A-JA are found to be more powerful than the base algorithm JA and the benchmark algorithms. The proposed method achieves the Pareto fronts to help decision makers to make trade-off between the objectives and choose the optimum solution considering on their preference.
- 11 July 2020
- Published by Springer Nature in Iranian Journal of Science and Technology, Transactions of Civil Engineering
- Vol. 44 (4) , 1295-1307
Novel Hybrid Method in Time–Cost Trade-Off for Resource-Constrained Construction Projects
- 11 July 2020
- Published by Springer Nature in Iranian Journal of Science and Technology, Transactions of Civil Engineering
- Vol. 44 (4) , 1295-1307
Novel Hybrid Method in Time–Cost Trade-Off for Resource-Constrained Construction Projects
- Open Access
- 31 August 2018
- Published by Pontificia Universidad Catolica de Chile in Revista de la construcción
- Vol. 17 (2) , 304-318
Optimización multimodal para la compensación de tiempo-costo, en proyectos de construcción, usando un nuevo método híbrido, basado en FA y PSO
Completion of the activities within optimal time and cost plays a significant role in construction projects. Recently, project managers have to decrease the total durations and costs of the projects more than before due to the competitive environment. Mostly, decision makers usually seek different alternatives which reduce time and cost. As well as being one of the most major topics of construction management, this problem called time-cost trade-off (TCTO) which is extremely difficult to solve with traditional mathematical methods. In recent years, metaheuristic algorithms are outstanding methods in this field due to their flexible and adaptable structure. This paper presents a new algorithm called F-PSO which consists of hybridizing Firefly Algorithm (FA) with Particle Swarm Optimization (PSO). In this method, the problem is modelled with various execution modes to select the optimal one for each activity. The applicability and validity of the proposed method is confirmed by performing 18-activity project as a benchmark problem. Comparison of numerical results with different metaheuristic algorithms demonstrates the effectiveness and efficiency of F-PSO with regard to optimality of time and cost outcomes.
- 31 August 2018
- Published by Pontificia Universidad Catolica de Chile in Revista de la construcción
- Vol. 17 (2) , 304-318
Open AccessOptimización multimodal para la compensación de tiempo-costo, en proyectos de construcción, usando un nuevo método híbrido, basado en FA y PSO
Completion of the activities within optimal time and cost plays a significant role in construction projects. Recently, project managers have to decrease the total durations and costs of the projects more than before due to the competitive environment. Mostly, decision makers usually seek different alternatives which reduce time and cost. As well as being one of the most major topics of construction management, this problem called time-cost trade-off (TCTO) which is extremely difficult to solve with traditional mathematical methods. In recent years, metaheuristic algorithms are outstanding methods in this field due to their flexible and adaptable structure. This paper presents a new algorithm called F-PSO which consists of hybridizing Firefly Algorithm (FA) with Particle Swarm Optimization (PSO). In this method, the problem is modelled with various execution modes to select the optimal one for each activity. The applicability and validity of the proposed method is confirmed by performing 18-activity project as a benchmark problem. Comparison of numerical results with different metaheuristic algorithms demonstrates the effectiveness and efficiency of F-PSO with regard to optimality of time and cost outcomes.
- 1 April 2018
- Published by IACSIT Press in International Journal of Engineering and Technology
- Vol. 10 (2) , 167-170
Approach of Non-linear Programming for Cost Optimization of Plane Truss System
- 1 April 2018
- Published by IACSIT Press in International Journal of Engineering and Technology
- Vol. 10 (2) , 167-170
Approach of Non-linear Programming for Cost Optimization of Plane Truss System
- Open Access
- 30 October 2016
- Published by Ital Publication in Civil Engineering Journal
- Vol. 2 (10) , 491-496
Investigation of Ready Mixed Concrete Transportation Problem Using Linear Programming and Genetic Algorithm
Ready-mixed concrete (RMC) is one of the most common building material for construction industry for nearly all developed and developing countries. Generally, because of the technical requirements, concrete must be mixed in a batch plant and transported to the construction site. There are two important factors affected the cost of RMC: raw material cost and transportation cost. Additionally, transportation cost is also included when determining the unit price of RMC. However, profitability affects adversely in the case of long distance between the plant and construction site. For these reason, distribution of RMC from supply to the demand points with minimum cost is aimed in this study. This work contributes to both modelling and dispatching of RMC as an optimization problem by applying linear and heuristic methods. For this purpose, as an example, an urban area which divided into 7 districts and contained 4 concrete batch plants is discussed. Linear programming and genetic algorithm were applied to solve this problem and compared each other under the same conditions. The result shows linear programming is more efficient for this application because of the limited constraints and variables.
- 30 October 2016
- Published by Ital Publication in Civil Engineering Journal
- Vol. 2 (10) , 491-496
Open AccessInvestigation of Ready Mixed Concrete Transportation Problem Using Linear Programming and Genetic Algorithm
Ready-mixed concrete (RMC) is one of the most common building material for construction industry for nearly all developed and developing countries. Generally, because of the technical requirements, concrete must be mixed in a batch plant and transported to the construction site. There are two important factors affected the cost of RMC: raw material cost and transportation cost. Additionally, transportation cost is also included when determining the unit price of RMC. However, profitability affects adversely in the case of long distance between the plant and construction site. For these reason, distribution of RMC from supply to the demand points with minimum cost is aimed in this study. This work contributes to both modelling and dispatching of RMC as an optimization problem by applying linear and heuristic methods. For this purpose, as an example, an urban area which divided into 7 districts and contained 4 concrete batch plants is discussed. Linear programming and genetic algorithm were applied to solve this problem and compared each other under the same conditions. The result shows linear programming is more efficient for this application because of the limited constraints and variables.