Wiwik Yunarni Widiarti
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Wiwik Yunarni Widiarti has a total of 43 co-authors. Here are the top co-authors by number of shared publications:
- Entin Hidayah
Department of Civil Engineering, Universitas Jember, Jember, Indonesia
9 shared publications - Retno Utami Agung Wiyono
Universitas Jember
5 shared publications Gusfan Halik
University of Jember
4 shared publications- Gusfan Halik
Civil Engineering Department of University of Jember, Jl. Kalimantan Tegalboto No.37, Jember, Indonesia
2 shared publications Afriq Fadian Syahya
Jurusan Teknik Sipil, Fakultas Teknik, Universitas Jember. Jember, Jawa Timur
1 shared publication- Anggraeni Ayu Dewantie
Univ Jember, Dept Civil Engn, Jalan Kalimantan 37, Jember 68121, Jawa Timur, Indonesia
1 shared publication
Latest Publications
- Open Access
- 8 August 2026
- Published by Institute of Research and Community Services Diponegoro University (LPPM UNDIP) in Jurnal Ilmu Lingkungan
- Vol. 24 (4) , 786-798
Risk Analysis and Mitigation of Flash Flood in Ijen Sub-District, Bondowoso
Badan Penanggulangan Bencana Daerah (BPBD) mencatat bahwa Kabupaten Bondowoso pernah mengalami tiga kali kejadian banjir bandang sepanjang tahun 2020 – 2024 yang seluruhnya terjadi di Kecamatan Ijen. Bencana ini menyebabkan jalan desa tertutup lumpur, kerusakan pada rumah warga, infrastruktur, dan kandang ternak. Namun, terdapat ketidaksesuaian dalam dokumen perencanaan tata ruang di tingkat kabupaten maupun provinsi. Sehingga upaya penanggulangan bencana belum dapat dilakukan secara optimal. Oleh karena itu, analisis risiko dan mitigasi bencana diperlukan untuk mengurangi risiko yang ada serta memberikan rasa aman dan nyaman bagi masyarakat. Penelitian ini bertujuan untuk menganalisis tingkat risiko banjir bandang dan menyusun upaya mitigasi yang relevan. Pendekatan yang digunakan meliputi analisis spasial dengan Sistem Informasi Geografis (SIG) untuk memetakan tingkat risiko bencana dan analisis Delphi yang melibatkan 6 ahli dalam 2 kali putaran iterasi menggunakan kuesioner untuk memberikan rekomendasi kegiatan mitigasi yang tepat. Penelitian ini juga melanjutkan hasil studi sebelumnya terkait manajemen tanggap darurat dan keterlibatan pemangku kepentingan dalam tahap prabencana di Kecamatan Ijen. Hasil analisis menunjukkan bahwa 52,11% wilayah termasuk dalam kategori risiko rendah, 44,12% kategori sedang, dan 3,77% kategori tinggi yang seluruhnya tersebar di 6 desa. Tingkat risiko yang didominasi kelas rendah disebabkan oleh faktor tutupan lahan yang sebagian besar berupa hutan, kepadatan penduduk yang rendah, sebaran permukiman penduduk yang terkonsentrasi, dan adanya kelompok Desa Tangguh Bencana (DESTANA) dalam meningkatkan kapasitas wilayah untuk menghadapi bencana. Selanjutnya, rekomendasi kegiatan mitigasi dibagi menjadi mitigasi struktural dan mitigasi non-struktural. Penelitian ini diharapkan dapat memberikan informasi, pertimbangan, dan rekomendasi dalam penanggulangan bencana serta kebijakan tata ruang di Kabupaten Bondowoso khususnya terkait banjir bandang. Selain itu, metode dan parameter yang digunakan dapat dikembangkan lebih lanjut untuk memahami karakteristik wilayah rawan bencana secara lebih mendalam.
- 8 August 2026
- Published by Institute of Research and Community Services Diponegoro University (LPPM UNDIP) in Jurnal Ilmu Lingkungan
- Vol. 24 (4) , 786-798
Open AccessRisk Analysis and Mitigation of Flash Flood in Ijen Sub-District, Bondowoso
Badan Penanggulangan Bencana Daerah (BPBD) mencatat bahwa Kabupaten Bondowoso pernah mengalami tiga kali kejadian banjir bandang sepanjang tahun 2020 – 2024 yang seluruhnya terjadi di Kecamatan Ijen. Bencana ini menyebabkan jalan desa tertutup lumpur, kerusakan pada rumah warga, infrastruktur, dan kandang ternak. Namun, terdapat ketidaksesuaian dalam dokumen perencanaan tata ruang di tingkat kabupaten maupun provinsi. Sehingga upaya penanggulangan bencana belum dapat dilakukan secara optimal. Oleh karena itu, analisis risiko dan mitigasi bencana diperlukan untuk mengurangi risiko yang ada serta memberikan rasa aman dan nyaman bagi masyarakat. Penelitian ini bertujuan untuk menganalisis tingkat risiko banjir bandang dan menyusun upaya mitigasi yang relevan. Pendekatan yang digunakan meliputi analisis spasial dengan Sistem Informasi Geografis (SIG) untuk memetakan tingkat risiko bencana dan analisis Delphi yang melibatkan 6 ahli dalam 2 kali putaran iterasi menggunakan kuesioner untuk memberikan rekomendasi kegiatan mitigasi yang tepat. Penelitian ini juga melanjutkan hasil studi sebelumnya terkait manajemen tanggap darurat dan keterlibatan pemangku kepentingan dalam tahap prabencana di Kecamatan Ijen. Hasil analisis menunjukkan bahwa 52,11% wilayah termasuk dalam kategori risiko rendah, 44,12% kategori sedang, dan 3,77% kategori tinggi yang seluruhnya tersebar di 6 desa. Tingkat risiko yang didominasi kelas rendah disebabkan oleh faktor tutupan lahan yang sebagian besar berupa hutan, kepadatan penduduk yang rendah, sebaran permukiman penduduk yang terkonsentrasi, dan adanya kelompok Desa Tangguh Bencana (DESTANA) dalam meningkatkan kapasitas wilayah untuk menghadapi bencana. Selanjutnya, rekomendasi kegiatan mitigasi dibagi menjadi mitigasi struktural dan mitigasi non-struktural. Penelitian ini diharapkan dapat memberikan informasi, pertimbangan, dan rekomendasi dalam penanggulangan bencana serta kebijakan tata ruang di Kabupaten Bondowoso khususnya terkait banjir bandang. Selain itu, metode dan parameter yang digunakan dapat dikembangkan lebih lanjut untuk memahami karakteristik wilayah rawan bencana secara lebih mendalam.
- 1 June 2026
- Published by IWA Publishing in Water Practice & Technology
- Vol. 21 (6) , 2383-2404
Tsunami evacuation route determination using AHP–TOPSIS with a participatory approach in Gumukmas, Jember, Indonesia
A flowchart consists of six main points: (1) participatory criteria and weighting of analytic hierarchy process based on eight criteria, followed by AH pairwise comparison and weight of criteria, (2) process of technique for order preference by similarity to ideal solution ranking, (3) spatial implementation using geographic information systems (from preparing tsunami hazard map using Delft3D modeling) and creating evacuation route, (4) focus group discussion for validation purpose, and (5) final evacuation route and early warning system web application. Extreme coastal flooding caused by a tsunami could cause a high number of casualties and economic loss. Effective coastal flood risk management, therefore, requires a well-prepared tsunami evacuation strategy. Evacuation planning in coastal areas requires not only technically optimal solutions but also socially executable strategies. This study aims to identify and validate suitable temporary evacuation sites (TES) and evacuation routes in Gumukmas, Indonesia, by integrating multicriteria decision analysis with participatory validation. A hybrid Analytic Hierarchy Process (AHP) and Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) approach was applied to prioritize thirteen TES alternatives based on eight evaluation criteria, and the resulting priorities were integrated into evacuation route mapping. To ensure operational relevance, the analytical results were validated through a focus group discussion (FGD). The results show that evacuation time and tsunami disaster risk are the most influential criteria and that TES rankings shift substantially when trade-offs among criteria are considered using TOPSIS. The FGD did not invalidate the analytical results but redefined their functional application by introducing a staged evacuation concept and additional TES based on local experience and perceived safety. This study demonstrates that participatory processes are essential for translating numerical optimality into realistic coastal flood protection practice.
- 1 June 2026
- Published by IWA Publishing in Water Practice & Technology
- Vol. 21 (6) , 2383-2404
Tsunami evacuation route determination using AHP–TOPSIS with a participatory approach in Gumukmas, Jember, Indonesia
A flowchart consists of six main points: (1) participatory criteria and weighting of analytic hierarchy process based on eight criteria, followed by AH pairwise comparison and weight of criteria, (2) process of technique for order preference by similarity to ideal solution ranking, (3) spatial implementation using geographic information systems (from preparing tsunami hazard map using Delft3D modeling) and creating evacuation route, (4) focus group discussion for validation purpose, and (5) final evacuation route and early warning system web application. Extreme coastal flooding caused by a tsunami could cause a high number of casualties and economic loss. Effective coastal flood risk management, therefore, requires a well-prepared tsunami evacuation strategy. Evacuation planning in coastal areas requires not only technically optimal solutions but also socially executable strategies. This study aims to identify and validate suitable temporary evacuation sites (TES) and evacuation routes in Gumukmas, Indonesia, by integrating multicriteria decision analysis with participatory validation. A hybrid Analytic Hierarchy Process (AHP) and Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) approach was applied to prioritize thirteen TES alternatives based on eight evaluation criteria, and the resulting priorities were integrated into evacuation route mapping. To ensure operational relevance, the analytical results were validated through a focus group discussion (FGD). The results show that evacuation time and tsunami disaster risk are the most influential criteria and that TES rankings shift substantially when trade-offs among criteria are considered using TOPSIS. The FGD did not invalidate the analytical results but redefined their functional application by introducing a staged evacuation concept and additional TES based on local experience and perceived safety. This study demonstrates that participatory processes are essential for translating numerical optimality into realistic coastal flood protection practice.
- Open Access
- 1 January 2026
- Published by Computational Hydraulics International in Journal of Water Management Modeling
- Vol. 34
Determining the Location of Temporary Evacuation Sites for Tsunami Disasters using the AHP-TOPSIS Method in Payangan Beach, Jember, Indonesia
Payangan Beach in Ambulu sub-district is prone to tsunamis because it is facing the Indian Ocean where a megathrust lies, making the identification of suitable Temporary Evacuation Sites (TES) essential for disaster mitigation. This study integrates Geographic Information Systems (GIS) with the Analytical Hierarchy Process (AHP) and the Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) that aims to evaluate nine TES candidates based on eight criteria. The AHP–TOPSIS results show that evacuation time, evacuation route width, and tsunami risk are the most dominant variables. The initial AHP–TOPSIS ranking identified Mount Watangan, Sumberejo 03 Elementary School, and Sumberejo Village Field as the most suitable TES. However, Focus Group Discussion (FGD) findings revealed that these mathematically optimal locations were not feasible due to steep access, proximity to the river, and other micro-topographic constraints not represented in the model. Community validation, therefore, led to the replacement of three TES with safer and more accessible alternatives. This study demonstrates that while AHP–TOPSIS provides a rapid analytical framework for prioritizing evacuation sites, final decisions must integrate local knowledge to ensure realistic evacuation planning. Therefore, this study supports the installation of the first tsunami evacuation route maps in Ambulu District.
- 1 January 2026
- Published by Computational Hydraulics International in Journal of Water Management Modeling
- Vol. 34
Open AccessDetermining the Location of Temporary Evacuation Sites for Tsunami Disasters using the AHP-TOPSIS Method in Payangan Beach, Jember, Indonesia
Payangan Beach in Ambulu sub-district is prone to tsunamis because it is facing the Indian Ocean where a megathrust lies, making the identification of suitable Temporary Evacuation Sites (TES) essential for disaster mitigation. This study integrates Geographic Information Systems (GIS) with the Analytical Hierarchy Process (AHP) and the Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) that aims to evaluate nine TES candidates based on eight criteria. The AHP–TOPSIS results show that evacuation time, evacuation route width, and tsunami risk are the most dominant variables. The initial AHP–TOPSIS ranking identified Mount Watangan, Sumberejo 03 Elementary School, and Sumberejo Village Field as the most suitable TES. However, Focus Group Discussion (FGD) findings revealed that these mathematically optimal locations were not feasible due to steep access, proximity to the river, and other micro-topographic constraints not represented in the model. Community validation, therefore, led to the replacement of three TES with safer and more accessible alternatives. This study demonstrates that while AHP–TOPSIS provides a rapid analytical framework for prioritizing evacuation sites, final decisions must integrate local knowledge to ensure realistic evacuation planning. Therefore, this study supports the installation of the first tsunami evacuation route maps in Ambulu District.
- 1 January 2026
- Published by Computational Hydraulics International in Journal of Water Management Modeling
Generating High-Resolution DEMs from Two Different Resolution Data for 2D Flood Mapping
Flood hazard mapping is essential for reducing flood risks by identifying vulnerable areas and guiding response strategies. However, obtaining high-resolution topographic data over large areas can be costly, and reducing this expense while maintaining accuracy is crucial for effective 2D hydraulic mapping. The limited availability of topographic data in river areas makes it difficult to delineate flood inundation. This research aims to investigate the best model for extending high-resolution Digital Elevation Model (DEM) data as input for flood hazard mapping. To enhance DEM resolution, the best model was selected by comparing Root Mean Square Error (RMSE) values from various interpolation methods, namely nearest neighbour interpolation (NNI), bicubic, and bilinear in spatial analysis. The model was then validated using 40 data points. Subsequently, the best model was used to generate a DEM for a larger scale as input for 2D modeling with HEC-RAS. The flood inundation model was validated twice: first, based on water level measurements at the Automatic Water Level Recorder (AWLR) Rowotamtu, and second, based on field observations of extreme flood events. The model results show that the best interpolation method for obtaining a high-resolution DEM is bilinear. The first flood data validation produces an RMSE value of 0.113, while the second is slightly higher at 0.316. Both results indicate good model accuracy, and the flood inundation maps generated can be used to demonstrate flood hazards.
- 1 January 2026
- Published by Computational Hydraulics International in Journal of Water Management Modeling
Generating High-Resolution DEMs from Two Different Resolution Data for 2D Flood Mapping
Flood hazard mapping is essential for reducing flood risks by identifying vulnerable areas and guiding response strategies. However, obtaining high-resolution topographic data over large areas can be costly, and reducing this expense while maintaining accuracy is crucial for effective 2D hydraulic mapping. The limited availability of topographic data in river areas makes it difficult to delineate flood inundation. This research aims to investigate the best model for extending high-resolution Digital Elevation Model (DEM) data as input for flood hazard mapping. To enhance DEM resolution, the best model was selected by comparing Root Mean Square Error (RMSE) values from various interpolation methods, namely nearest neighbour interpolation (NNI), bicubic, and bilinear in spatial analysis. The model was then validated using 40 data points. Subsequently, the best model was used to generate a DEM for a larger scale as input for 2D modeling with HEC-RAS. The flood inundation model was validated twice: first, based on water level measurements at the Automatic Water Level Recorder (AWLR) Rowotamtu, and second, based on field observations of extreme flood events. The model results show that the best interpolation method for obtaining a high-resolution DEM is bilinear. The first flood data validation produces an RMSE value of 0.113, while the second is slightly higher at 0.316. Both results indicate good model accuracy, and the flood inundation maps generated can be used to demonstrate flood hazards.
- Open Access
- 30 April 2025
- Published by UPT Penerbitan Universitas Jember in Journal of Ikatan Ahli Manajemen Proyek Indonesia
- Vol. 3 (1) , 1-14
Pemodelan Building Information Modelling (BIM) 5D pada Sistem Proteksi Kebakaran Gedung Rumah Sakit
Population growth, accompanied by a lack of environmental cleanliness and health awareness, increases public health risks. Hospitals are the leading destination for people to get health services. Ngudi Waluyo Wlingi Regional Hospital in Blitar Regency is building an ICU Building to treat patients with critical illnesses, both infectious and non-infectious. This study aims to model the fire protection system of the ICU building of Ngudi Waluyo Blitar Regional Hospital using the 5D Building Information Modeling (BIM) approach using Autodesk Revit software. Fire protection system modeling is crucial in the context of the increasing need for safety in public buildings such as hospitals. The secondary data consists of DED Drawings, Mutual Check 0, Work Plan and Requirements (RKS), and Blitar Unit Price Analysis (AHSP). The research stages include three-dimensional modeling of architecture and fire protection systems, extraction of work volumes through Quantity Take Off (QTO), and cost estimation based on applicable regulations. The study results show that BIM Revit can simulate sprinkler systems, smoke and heat detectors, indoor hydrants, and other safety panels visually and quantitatively. The estimated cost of the fire protection system reached Rp 811,236,639. This study provides evidence that BIM can improve the accuracy of fire protection system planning and support cost efficiency in public service building construction projects.
- 30 April 2025
- Published by UPT Penerbitan Universitas Jember in Journal of Ikatan Ahli Manajemen Proyek Indonesia
- Vol. 3 (1) , 1-14
Open AccessPemodelan Building Information Modelling (BIM) 5D pada Sistem Proteksi Kebakaran Gedung Rumah Sakit
Population growth, accompanied by a lack of environmental cleanliness and health awareness, increases public health risks. Hospitals are the leading destination for people to get health services. Ngudi Waluyo Wlingi Regional Hospital in Blitar Regency is building an ICU Building to treat patients with critical illnesses, both infectious and non-infectious. This study aims to model the fire protection system of the ICU building of Ngudi Waluyo Blitar Regional Hospital using the 5D Building Information Modeling (BIM) approach using Autodesk Revit software. Fire protection system modeling is crucial in the context of the increasing need for safety in public buildings such as hospitals. The secondary data consists of DED Drawings, Mutual Check 0, Work Plan and Requirements (RKS), and Blitar Unit Price Analysis (AHSP). The research stages include three-dimensional modeling of architecture and fire protection systems, extraction of work volumes through Quantity Take Off (QTO), and cost estimation based on applicable regulations. The study results show that BIM Revit can simulate sprinkler systems, smoke and heat detectors, indoor hydrants, and other safety panels visually and quantitatively. The estimated cost of the fire protection system reached Rp 811,236,639. This study provides evidence that BIM can improve the accuracy of fire protection system planning and support cost efficiency in public service building construction projects.
- Open Access
- 23 June 2024
- Published by UPT Penerbitan Universitas Jember in Geosfera Indonesia
- Vol. 9 (2) , 122-143
Effects of Land Use Change on Land Erosion and Land Critical Level Using GIS in the Mayang Watershed
The increasing population in an area often triggers heightened development, leading to diminished land availability and subsequent land conversion. This transformation, predominantly observed in agricultural and plantation lands, is driven by the need for residential areas. However, continuous land use changes contribute to erosion, a natural process wherein soil is transported, leading to sedimentation and eventual flooding. This study aims to identify critical areas prone to erosion and land degradation. To address this, we used the Universal Soil Loss Equation (USLE) method for erosion prediction, leveraging its simplicity and accuracy. This study focuses on the Mayang watershed in East Java, utilizing a combination of USLE, spectral index modeling, and Geographic Information System (GIS) techniques to estimate soil erosion and land criticality. By integrating methodologies and analyzing data spanning from 2011 to 2021, the study reveals shifts in erosion danger levels and land use patterns. While regions with low erosion remained stable, areas with medium to high erosion declined, yet those with very high erosion exhibited a worrisome increase. Changes in land use, including forest loss and urban expansion, underscore the ecological shifts exacerbating erosion hazards. The study emphasizing the necessity for targeted conservation strategies and comprehensive land management plans to mitigate erosion risks and preserve environmental sustainability.
- 23 June 2024
- Published by UPT Penerbitan Universitas Jember in Geosfera Indonesia
- Vol. 9 (2) , 122-143
Open AccessEffects of Land Use Change on Land Erosion and Land Critical Level Using GIS in the Mayang Watershed
The increasing population in an area often triggers heightened development, leading to diminished land availability and subsequent land conversion. This transformation, predominantly observed in agricultural and plantation lands, is driven by the need for residential areas. However, continuous land use changes contribute to erosion, a natural process wherein soil is transported, leading to sedimentation and eventual flooding. This study aims to identify critical areas prone to erosion and land degradation. To address this, we used the Universal Soil Loss Equation (USLE) method for erosion prediction, leveraging its simplicity and accuracy. This study focuses on the Mayang watershed in East Java, utilizing a combination of USLE, spectral index modeling, and Geographic Information System (GIS) techniques to estimate soil erosion and land criticality. By integrating methodologies and analyzing data spanning from 2011 to 2021, the study reveals shifts in erosion danger levels and land use patterns. While regions with low erosion remained stable, areas with medium to high erosion declined, yet those with very high erosion exhibited a worrisome increase. Changes in land use, including forest loss and urban expansion, underscore the ecological shifts exacerbating erosion hazards. The study emphasizing the necessity for targeted conservation strategies and comprehensive land management plans to mitigate erosion risks and preserve environmental sustainability.
- Open Access
- 14 February 2024
- Published by KoNTekS in Konferensi Nasional Teknik Sipil (KoNTekS)
- Vol. 1 (1)
PEMODELAN DEBIT INFLOW WADUK BAJULMATI SITUBONDO JAWA TIMUR DENGAN MODEL DETERMINISTIK MOCK
Bendungan Bajulmati yang terletak diantara Kabupaten Situbondo dan Banyuwangi merupakan bendungan yang beroperasi sejak tahun 2018 Keberhasilan operasional Waduk Bajulmati ditentukan dari keberhasilan memprediksi debit aliran yang masuk ke waduk atau debit inflow. Oleh karena itu, diperlukan model prediksi inflow waduk yang parsimoni dan akurat sehingga dapat dijadikan acuan dalam merancang pola operasi dan alokasi air waduk secara optimal. Penelitian ini bertujuan untuk memodelkan prediksi inflow waduk. Model yang digunakan adalah model deterministik (model Mock). Keandalan model tahap kalibrasi dan validasi diuji menggunakan kriteria : Root Mean Square Error (RMSE) dan Nash Sutcliffe Efficiency (NSE). Hasil pemodelan menunjukkan bahwa prediksi debit inflow waduk model Mock memberikan akurasi yang baik dan mendekati kondisi debit aliran observasi. Dengan demikian, dapat dinyatakan bahwa model Mock dapat digunakan sebagai alternatif dalam memprediksi debit inflow di waduk Bajulmati.
- 14 February 2024
- Published by KoNTekS in Konferensi Nasional Teknik Sipil (KoNTekS)
- Vol. 1 (1)
Open AccessPEMODELAN DEBIT INFLOW WADUK BAJULMATI SITUBONDO JAWA TIMUR DENGAN MODEL DETERMINISTIK MOCK
Bendungan Bajulmati yang terletak diantara Kabupaten Situbondo dan Banyuwangi merupakan bendungan yang beroperasi sejak tahun 2018 Keberhasilan operasional Waduk Bajulmati ditentukan dari keberhasilan memprediksi debit aliran yang masuk ke waduk atau debit inflow. Oleh karena itu, diperlukan model prediksi inflow waduk yang parsimoni dan akurat sehingga dapat dijadikan acuan dalam merancang pola operasi dan alokasi air waduk secara optimal. Penelitian ini bertujuan untuk memodelkan prediksi inflow waduk. Model yang digunakan adalah model deterministik (model Mock). Keandalan model tahap kalibrasi dan validasi diuji menggunakan kriteria : Root Mean Square Error (RMSE) dan Nash Sutcliffe Efficiency (NSE). Hasil pemodelan menunjukkan bahwa prediksi debit inflow waduk model Mock memberikan akurasi yang baik dan mendekati kondisi debit aliran observasi. Dengan demikian, dapat dinyatakan bahwa model Mock dapat digunakan sebagai alternatif dalam memprediksi debit inflow di waduk Bajulmati.
- Open Access
- 31 March 2023
- Published by Universitas Andalas in Jurnal Rekayasa Sipil (JRS-Unand)
- Vol. 19 (1) , 1-13
Analisis Prioritas Penanganan Kerusakan bendung di DAS Mayang Kabupaten Jember
Bertambah besarnya tanggung jawab pemerintah daerah menuntut semakin banyak jumlah anggaran yang harus dikeluarkan dalam pembangunan. Hal ini merupakan tantangan dalam melaksanakan pembangunan yang berkelanjutan dan berkeadilan. Salah satu tunggang jawab tersebut adalah melakukan penanganan terhadap kerusakan bangunan utama irigasi yang masing masing memiliki manfaat, tingkat kerusakan, dan keterbatasan yang berbeda beda, sehingga penentuan prioritas rehabilitasi sulit untuk dilakukan. Studi ini bertujuan untuk menentukan prioritas penanganan bendung berdasarkan analisis tiga kinerja yang meliputi kondisi prasarana, ketersediaan air, dan luas area irigasi. Penilaian ini dilakukan pada lima bendung yang berurutan pada aliran sungai utama DAS Mayang. Proses pengambilan data dilakukan dengan penyebaran kuisioner kepada 9 orang dari Dinas PU Pengairan Jember dan 1 orang dari UPT Pengairan Mayang. Sedangkan data ketersediaan air dan luas area irigasi didapatkan dari Dinas PU Pengairan Jember. Penentuan bobot kinerja bendung dilakukan menggunakan metode AHP (Analytical Hierarchy Process). Penilaian tingkat kerusakan bendung dilakukan dengan pengamatan langsung dilapangan yang mengacu pada Permen PU No.12/PRT/M/2015. Hasil pembobotan kinerja bendung menunjukan bahwa kondisi prasarana 49%, ketersediaan air 42%, dan luas area Irigasi 9%. Bendung Tegal Waru merupakan prioritas utama dalam penanganan kerusakan.
- 31 March 2023
- Published by Universitas Andalas in Jurnal Rekayasa Sipil (JRS-Unand)
- Vol. 19 (1) , 1-13
Open AccessAnalisis Prioritas Penanganan Kerusakan bendung di DAS Mayang Kabupaten Jember
Bertambah besarnya tanggung jawab pemerintah daerah menuntut semakin banyak jumlah anggaran yang harus dikeluarkan dalam pembangunan. Hal ini merupakan tantangan dalam melaksanakan pembangunan yang berkelanjutan dan berkeadilan. Salah satu tunggang jawab tersebut adalah melakukan penanganan terhadap kerusakan bangunan utama irigasi yang masing masing memiliki manfaat, tingkat kerusakan, dan keterbatasan yang berbeda beda, sehingga penentuan prioritas rehabilitasi sulit untuk dilakukan. Studi ini bertujuan untuk menentukan prioritas penanganan bendung berdasarkan analisis tiga kinerja yang meliputi kondisi prasarana, ketersediaan air, dan luas area irigasi. Penilaian ini dilakukan pada lima bendung yang berurutan pada aliran sungai utama DAS Mayang. Proses pengambilan data dilakukan dengan penyebaran kuisioner kepada 9 orang dari Dinas PU Pengairan Jember dan 1 orang dari UPT Pengairan Mayang. Sedangkan data ketersediaan air dan luas area irigasi didapatkan dari Dinas PU Pengairan Jember. Penentuan bobot kinerja bendung dilakukan menggunakan metode AHP (Analytical Hierarchy Process). Penilaian tingkat kerusakan bendung dilakukan dengan pengamatan langsung dilapangan yang mengacu pada Permen PU No.12/PRT/M/2015. Hasil pembobotan kinerja bendung menunjukan bahwa kondisi prasarana 49%, ketersediaan air 42%, dan luas area Irigasi 9%. Bendung Tegal Waru merupakan prioritas utama dalam penanganan kerusakan.
- Open Access
- 1 January 2023
- Published by MIM Research Group in Research on Engineering Structures and Materials
Integral waterproofing concrete mechanical properties with the addition of fly ash
Integral waterproofing concrete mechanical properties with the addition of fly ash
- 1 January 2023
- Published by MIM Research Group in Research on Engineering Structures and Materials
Open AccessIntegral waterproofing concrete mechanical properties with the addition of fly ash
Integral waterproofing concrete mechanical properties with the addition of fly ash
- 19 July 2022
- Published by Springer Nature
- p. 619-628
Wind-Generated Wave Simulation on Payangan Beach Utilizing DELFT3D
- 19 July 2022
- Published by Springer Nature
- p. 619-628
Wind-Generated Wave Simulation on Payangan Beach Utilizing DELFT3D