P. E. Hryhorovskyi
Research Subjects
P. E. Hryhorovskyi has a total of 19 co-authors. Here are the top co-authors by number of shared publications:
- Olena Murasova
SE "Research institute of construction production named after V.S. Balytskyi", Kyiv
6 shared publications - Vladyslav Basanskyi
SE «Research Institute of Construction Production named after V.S. Balytsky
5 shared publications - Yu. V. Kroshka
The State "Research institute of building production named V.S. Balitsky", Kyiv
3 shared publications - Y.N. Chervyakov
SE «Research Institute of Construction Production named after V.S. Balytsky
2 shared publications - Yu.M. Khalupka
SE «Research Institute of Construction Production named after V.S. Balytsky
2 shared publications Yu.V. Bilkevych
SE «Research Institute of Construction Production named after V.S. Balytsky
2 shared publications
Latest Publications
- Open Access
- 1 October 2025
- Published by Building Production, State Enterprise 'V.Balytskyi Scientific Research Institute of Building Production (SE 'NDIBV') in Building production
- No. 80
FEATURES OF THE OPERATION OF THE FLAGPOLE OF THE STATE FLAG OF UKRAINE AS A UNIQUE TOWER STRUCTURE
The intensive development of urban spaces in modern conditions necessitates the construction of unique structures, among which tall tower structures and constructions such as advertising pylons, flagpoles, lighting poles, structures for telecommunication equipment, lightning protection masts, and others hold a spe-cial place. The operation of such structures is associated with heightened requirements for reliability and safe-ty, as they are constantly exposed to external factors, particularly dynamic wind loads. Wind impacts cause vibrations in structures, which can lead to material fatigue, deformations, or even emergency situations. A notable and symbolic example is the 85-meter-high flagpole of the State Flag of Ukraine, located on the ter-ritory of the National Museum of the History of Ukraine in the Second World War. This necessitates the deve-lopment and implementation of innovative engineering solutions aimed at enhancing the structures’ resistan-ce to dynamic loads, optimizing their design parameters, and ensuring a long-term safe operation. The operation of such structures involves constant exposure to dynamic loads, including wind, tempera-ture, and operational factors, which are amplified by the large surface area of the flag’s fabric. These factors can cause vibrations, deformations, metal corrosion, and slope instability at the structure’s loca-tion. The article analyzes the regulatory requirements for the operational suitability of tower structures, including current documents [1–10], which regulate mechanical stability, fire safety, protection against noise, vibrations, and environmental impact, as well as energy efficiency and repair procedures. The aim of the study is to analyze the operational features of the flagpole of the State Flag of Ukraine and to develop recommendations for organizing a technical supervision system. The objectives include identifying regulatory requirements, analyzing the monitoring system, summarizing technical mainte-nance measures, and formulating recommendations to improve the operational efficiency of similar structures. The study thoroughly examines the operational regulations, which include regular inspections (daily, routine, seasonal, and extraordinary), anti-corrosion protection, monitoring of bolted and wel-ded connections, foundation and adjacent slope monitoring, and maintenance of engineering systems. Special attention is paid to the structure’s location in a landslide-prone area, which requires constant geodetic control and instrumental monitoring. The proposed recommendations aim to ensure the reliabi-lity, safety, and durability of tower structures through the implementation of modern monitoring met-hods, the use of resilient materials and technologies, and the clear organization of operational services. The research results can be applied to other tall structures, contributing to the enhancement of their ope-rational efficiency and the sustainable development of urban infrastructure. The conclusions emphasize that an effective supervision and maintenance system for the flagpole ensures the extension of its service life and the preservation of its operational suitability. The obtained results can serve as a methodological basis for the operation of other tower structures.
- 1 October 2025
- Published by Building Production, State Enterprise 'V.Balytskyi Scientific Research Institute of Building Production (SE 'NDIBV') in Building production
- No. 80
Open AccessFEATURES OF THE OPERATION OF THE FLAGPOLE OF THE STATE FLAG OF UKRAINE AS A UNIQUE TOWER STRUCTURE
The intensive development of urban spaces in modern conditions necessitates the construction of unique structures, among which tall tower structures and constructions such as advertising pylons, flagpoles, lighting poles, structures for telecommunication equipment, lightning protection masts, and others hold a spe-cial place. The operation of such structures is associated with heightened requirements for reliability and safe-ty, as they are constantly exposed to external factors, particularly dynamic wind loads. Wind impacts cause vibrations in structures, which can lead to material fatigue, deformations, or even emergency situations. A notable and symbolic example is the 85-meter-high flagpole of the State Flag of Ukraine, located on the ter-ritory of the National Museum of the History of Ukraine in the Second World War. This necessitates the deve-lopment and implementation of innovative engineering solutions aimed at enhancing the structures’ resistan-ce to dynamic loads, optimizing their design parameters, and ensuring a long-term safe operation. The operation of such structures involves constant exposure to dynamic loads, including wind, tempera-ture, and operational factors, which are amplified by the large surface area of the flag’s fabric. These factors can cause vibrations, deformations, metal corrosion, and slope instability at the structure’s loca-tion. The article analyzes the regulatory requirements for the operational suitability of tower structures, including current documents [1–10], which regulate mechanical stability, fire safety, protection against noise, vibrations, and environmental impact, as well as energy efficiency and repair procedures. The aim of the study is to analyze the operational features of the flagpole of the State Flag of Ukraine and to develop recommendations for organizing a technical supervision system. The objectives include identifying regulatory requirements, analyzing the monitoring system, summarizing technical mainte-nance measures, and formulating recommendations to improve the operational efficiency of similar structures. The study thoroughly examines the operational regulations, which include regular inspections (daily, routine, seasonal, and extraordinary), anti-corrosion protection, monitoring of bolted and wel-ded connections, foundation and adjacent slope monitoring, and maintenance of engineering systems. Special attention is paid to the structure’s location in a landslide-prone area, which requires constant geodetic control and instrumental monitoring. The proposed recommendations aim to ensure the reliabi-lity, safety, and durability of tower structures through the implementation of modern monitoring met-hods, the use of resilient materials and technologies, and the clear organization of operational services. The research results can be applied to other tall structures, contributing to the enhancement of their ope-rational efficiency and the sustainable development of urban infrastructure. The conclusions emphasize that an effective supervision and maintenance system for the flagpole ensures the extension of its service life and the preservation of its operational suitability. The obtained results can serve as a methodological basis for the operation of other tower structures.
- Open Access
- 1 August 2025
- Published by Building Production, State Enterprise 'V.Balytskyi Scientific Research Institute of Building Production (SE 'NDIBV') in Building production
- No. 79,p. 3-13
ORGANIZATIONAL AND TECHNOLOGICAL ASPECTS OF OPTIMIZING THE DURATION OF WASTE MANAGEMENT PROCESSES IN CONSTRUCTION
The article investigates organizational, technical, and technological factors influencing the duration of the comprehensive process of managing construction and demolition waste, including dismantling, sorting, transportation, processing, and material reuse. Based on the analysis of the requirements of DBN A.3.1-5:2016 [1], DSTU 9258:2023 [2], and other regulatory documents, key causes of delays are identified, and solutions for their minimization are proposed. Organizational measures focus on optimizing project-technological documentation, improving logistics coordination, and establishing centralized platforms for waste flow management. Technical solutions involve selecting specialized equipment tailored to the structural schemes of facilities, using remotely controlled machines in hazardous areas, and implementing GPS monitoring for efficient transportation. Technological approaches include the application of automated sorting systems, advanced material processing methods, and digital process modeling to enhance operational efficiency. Particular emphasis is placed on integrating modern digital technologies, such as Building Information Modeling (BIM) tools and digital twin technologies, which enable dynamic process optimization, real-time monitoring, and improved decisionmaking. The study also highlights the need to update the regulatory framework to address specific challenges of waste management in emergency conditions, such as infrastructure restoration following disasters or conflicts. The findings are particularly significant for Ukraine, where large-scale infrastructure reconstruction will require effective waste management strategies. The research conclusions can be applied to improve the regulatory framework, optimize construction processes, and support the sustainable restoration of damaged infrastructure.
- 1 August 2025
- Published by Building Production, State Enterprise 'V.Balytskyi Scientific Research Institute of Building Production (SE 'NDIBV') in Building production
- No. 79,p. 3-13
Open AccessORGANIZATIONAL AND TECHNOLOGICAL ASPECTS OF OPTIMIZING THE DURATION OF WASTE MANAGEMENT PROCESSES IN CONSTRUCTION
The article investigates organizational, technical, and technological factors influencing the duration of the comprehensive process of managing construction and demolition waste, including dismantling, sorting, transportation, processing, and material reuse. Based on the analysis of the requirements of DBN A.3.1-5:2016 [1], DSTU 9258:2023 [2], and other regulatory documents, key causes of delays are identified, and solutions for their minimization are proposed. Organizational measures focus on optimizing project-technological documentation, improving logistics coordination, and establishing centralized platforms for waste flow management. Technical solutions involve selecting specialized equipment tailored to the structural schemes of facilities, using remotely controlled machines in hazardous areas, and implementing GPS monitoring for efficient transportation. Technological approaches include the application of automated sorting systems, advanced material processing methods, and digital process modeling to enhance operational efficiency. Particular emphasis is placed on integrating modern digital technologies, such as Building Information Modeling (BIM) tools and digital twin technologies, which enable dynamic process optimization, real-time monitoring, and improved decisionmaking. The study also highlights the need to update the regulatory framework to address specific challenges of waste management in emergency conditions, such as infrastructure restoration following disasters or conflicts. The findings are particularly significant for Ukraine, where large-scale infrastructure reconstruction will require effective waste management strategies. The research conclusions can be applied to improve the regulatory framework, optimize construction processes, and support the sustainable restoration of damaged infrastructure.
- Open Access
- 26 February 2025
- Published by Building Production, State Enterprise 'V.Balytskyi Scientific Research Institute of Building Production (SE 'NDIBV') in Building production
- No. 78,p. 125-131
STUDY OF LABOR COSTS OF PLASTERING SINIAT PLATO MULTISTART PLASTER STATION KALETA 5
The increase in the volume of mechanized plastering works in Kyiv and the high labor inten- sity require a study of the labor costs of mechanized plastering with the PLATУ MultiStart gypsum mix- ture of interior walls and ceilings of a residential building using the Kaleta ATWG-5 super plastering machine. The complex process of placing plaster coatings from the PLATУ MultiStart mixture consisted of the fol- lowing operations, for which fixed points of the beginning and end of the operation were established: surface preparation: cleaning the surface from dust, dirt, cutting off mortar flows; surface priming; hanging the surface and installing beacons on the walls, protective corners on the outer corners, window and door slopes; installation and rearrangement of scaffolding; mechanized application of PLATУ MultiStart gypsum plaster with the Kaleta A-5 super plastering station on walls and ceilings with a thic- kness of 15 mm; layer leveling with a metal rule; dismantling of inventory beacons; mechanized application of PLATУ MultiStart gypsum plaster in place of lighthouses; repeated leveling of the layer with a metal rule; smoothing the surface with metal spatulas; moistening the surface with a foam gra- ter; repeated smoothing of the surface with metal spatulas; design of corners. The labor costs of the mechanized installation of PLATУ MultiStartTM gypsum wall plastering by the KALETA ATWG-5 super plastering station amounted to 52,082 man-hours. per 100 m2 of wall surface and 74,822 man-hours. per 100 m2 of the ceiling surface, including operative work, is correspondingly equal to 49.39 man-hours. and 72.13 man-hours. for the number of plasterers in the rank of 5 people. Production per plasterer per shift equals 15.33 m2 of walls/person-room. and 10.68 m2 of ceilings/per- son-room.
- 26 February 2025
- Published by Building Production, State Enterprise 'V.Balytskyi Scientific Research Institute of Building Production (SE 'NDIBV') in Building production
- No. 78,p. 125-131
Open AccessSTUDY OF LABOR COSTS OF PLASTERING SINIAT PLATO MULTISTART PLASTER STATION KALETA 5
The increase in the volume of mechanized plastering works in Kyiv and the high labor inten- sity require a study of the labor costs of mechanized plastering with the PLATУ MultiStart gypsum mix- ture of interior walls and ceilings of a residential building using the Kaleta ATWG-5 super plastering machine. The complex process of placing plaster coatings from the PLATУ MultiStart mixture consisted of the fol- lowing operations, for which fixed points of the beginning and end of the operation were established: surface preparation: cleaning the surface from dust, dirt, cutting off mortar flows; surface priming; hanging the surface and installing beacons on the walls, protective corners on the outer corners, window and door slopes; installation and rearrangement of scaffolding; mechanized application of PLATУ MultiStart gypsum plaster with the Kaleta A-5 super plastering station on walls and ceilings with a thic- kness of 15 mm; layer leveling with a metal rule; dismantling of inventory beacons; mechanized application of PLATУ MultiStart gypsum plaster in place of lighthouses; repeated leveling of the layer with a metal rule; smoothing the surface with metal spatulas; moistening the surface with a foam gra- ter; repeated smoothing of the surface with metal spatulas; design of corners. The labor costs of the mechanized installation of PLATУ MultiStartTM gypsum wall plastering by the KALETA ATWG-5 super plastering station amounted to 52,082 man-hours. per 100 m2 of wall surface and 74,822 man-hours. per 100 m2 of the ceiling surface, including operative work, is correspondingly equal to 49.39 man-hours. and 72.13 man-hours. for the number of plasterers in the rank of 5 people. Production per plasterer per shift equals 15.33 m2 of walls/person-room. and 10.68 m2 of ceilings/per- son-room.
- Open Access
- 26 February 2025
- Published by Building Production, State Enterprise 'V.Balytskyi Scientific Research Institute of Building Production (SE 'NDIBV') in Building production
- No. 78,p. 3-8
TECHNICAL REGULATION OF THE USE OF SECONDARY RAW MATERIAL FROM CONSTRUCTION WASTE
The purpose of the article is an analytical study of the results of the experimental determination of the technical characteristics of secondary materials made from fragments of concrete products and stone wall materials, and natural raw materials of a similar purpose to establish the possibility of their interchangeability and the need to improve the national regulatory framework due to the normalization of quality indicators for secondary raw materials for the production of concrete and reinforced concrete products. The results of the study of quality indicators of recycled materials from construction waste and natural materials for use as aggregates in concrete mixtures are presented, as well as the characteristics of cement concrete based on such materials. Analytical studies have established that, based on the results of comparative experimental studies of the technical characteristics of secondary materials made from fragments of concrete products and stone wall materials, and natural raw materials of a similar purpose, the researchers did not reach a unanimous conclusion on the full replacement of natural mineral aggregates in concrete with secondary raw materials of the same grain composition. Attention is focused on the fact that the experience of countries where a significant part of construction waste is processed into secondary raw materials proves the need to create regulatory documents for recycled materials. It is emphasized that there are no regulatory documents in the national regulatory base of Ukraine that would establish requirements for the quality indicators of recycled aggregates for use in concrete, which is one of the reasons for restraining the use of construction and demolition waste. Given the large number of buildings damaged or destroyed during the war, demolition waste is a mixture of different materials and fragments of different types of products, therefore, it is possible that a series of regulations for different compositions of recycled construction waste will be needed to ensure the involvement of material after recycling in construction production.
- 26 February 2025
- Published by Building Production, State Enterprise 'V.Balytskyi Scientific Research Institute of Building Production (SE 'NDIBV') in Building production
- No. 78,p. 3-8
Open AccessTECHNICAL REGULATION OF THE USE OF SECONDARY RAW MATERIAL FROM CONSTRUCTION WASTE
The purpose of the article is an analytical study of the results of the experimental determination of the technical characteristics of secondary materials made from fragments of concrete products and stone wall materials, and natural raw materials of a similar purpose to establish the possibility of their interchangeability and the need to improve the national regulatory framework due to the normalization of quality indicators for secondary raw materials for the production of concrete and reinforced concrete products. The results of the study of quality indicators of recycled materials from construction waste and natural materials for use as aggregates in concrete mixtures are presented, as well as the characteristics of cement concrete based on such materials. Analytical studies have established that, based on the results of comparative experimental studies of the technical characteristics of secondary materials made from fragments of concrete products and stone wall materials, and natural raw materials of a similar purpose, the researchers did not reach a unanimous conclusion on the full replacement of natural mineral aggregates in concrete with secondary raw materials of the same grain composition. Attention is focused on the fact that the experience of countries where a significant part of construction waste is processed into secondary raw materials proves the need to create regulatory documents for recycled materials. It is emphasized that there are no regulatory documents in the national regulatory base of Ukraine that would establish requirements for the quality indicators of recycled aggregates for use in concrete, which is one of the reasons for restraining the use of construction and demolition waste. Given the large number of buildings damaged or destroyed during the war, demolition waste is a mixture of different materials and fragments of different types of products, therefore, it is possible that a series of regulations for different compositions of recycled construction waste will be needed to ensure the involvement of material after recycling in construction production.
- Open Access
- 30 December 2024
- Published by Building Production, State Enterprise 'V.Balytskyi Scientific Research Institute of Building Production (SE 'NDIBV') in Building production
- No. 77,p. 26-30
REGULATORY AND LEGAL FRAMEWORK OF MANAGEMENT CONSTRUCTION WASTE
The purpose of the article is to study the global experience of regulatory and legal regulation of construction and demolition waste management to determine measures to ensure the use of secondary raw materials from construction waste in Ukraine for the restoration of objects damaged and destroyed as a result of military actions and the construction of new buildings. The results of the study of the experience of developed countries regarding the attraction of construction and demolition waste for reuse and processing into secondary raw materials are presented. Analytical studies have established that Directive 2008/98/EC of the European Parliament and the Council provides for a target increase by 2020 of the share of non-hazardous construction waste prepared for reuse and recycling to at least 70% by weight, as well as promotion of recycling by selective removal of materials and creation of sorting systems. The direct requirements of the regulatory and legal regulation of construction waste management during the construction of facilities are outlined. In some states, direct requirements for handling construction waste have been established: in new construction, a certain percentage of products from recycled waste must be used; ban on landfills for construction waste that can be used for processing into secondary raw materials; the minimum area of buildings, during the construction of which mandatory disposal of waste is regulated; the minimum volumes of construction work are legally defined, the excess of which determines the need for builders to sort and process construction and demolition waste. The lack of specific target indicators for the collection, sorting, processing of construction and demolition waste, as well as the use of secondary raw materials obtained from them, was emphasized in the normative legal acts of Ukraine on waste management.
- 30 December 2024
- Published by Building Production, State Enterprise 'V.Balytskyi Scientific Research Institute of Building Production (SE 'NDIBV') in Building production
- No. 77,p. 26-30
Open AccessREGULATORY AND LEGAL FRAMEWORK OF MANAGEMENT CONSTRUCTION WASTE
The purpose of the article is to study the global experience of regulatory and legal regulation of construction and demolition waste management to determine measures to ensure the use of secondary raw materials from construction waste in Ukraine for the restoration of objects damaged and destroyed as a result of military actions and the construction of new buildings. The results of the study of the experience of developed countries regarding the attraction of construction and demolition waste for reuse and processing into secondary raw materials are presented. Analytical studies have established that Directive 2008/98/EC of the European Parliament and the Council provides for a target increase by 2020 of the share of non-hazardous construction waste prepared for reuse and recycling to at least 70% by weight, as well as promotion of recycling by selective removal of materials and creation of sorting systems. The direct requirements of the regulatory and legal regulation of construction waste management during the construction of facilities are outlined. In some states, direct requirements for handling construction waste have been established: in new construction, a certain percentage of products from recycled waste must be used; ban on landfills for construction waste that can be used for processing into secondary raw materials; the minimum area of buildings, during the construction of which mandatory disposal of waste is regulated; the minimum volumes of construction work are legally defined, the excess of which determines the need for builders to sort and process construction and demolition waste. The lack of specific target indicators for the collection, sorting, processing of construction and demolition waste, as well as the use of secondary raw materials obtained from them, was emphasized in the normative legal acts of Ukraine on waste management.
- Open Access
- 25 September 2023
- Published by Kyiv National University of Construction and Architecture in Management of Development of Complex Systems
- No. 55,p. 186-191
Opportunities to reduce random error satellite geolocation due to averagement of data received by U-BLOX NEO-6M-0-001 gps receiver with external active antenna
In our time, problems of accurate positioning of objects, equipment and cargo arise more and more often. These are the tasks of logistics and precision farming and, a separate group of tasks, positioning during earthworks in construction: pits, arrangement of pile fields, etc. If a positioning accuracy of 10 m is quite sufficient for logistics tasks, monitoring the movement of transport and cargo, then for construction tasks, an accuracy of 10 cm is required, and building monitoring tasks require a millimeter accuracy. This work is devoted to increasing the accuracy of satellite geolocation by reducing the random error of the receiver. A budget receiver with a price of about $5 was chosen for the study, from which data on the current geolocation was recorded. The data from the receiver contains a random error, which was eliminated by averaging the result. Studies have shown that with small averaging intervals, the error remains, although it decreases; as the averaging interval increases, the error decreases, however, up to a certain width of the interval; a further increase in the averaging interval ceases to affect the magnitude of the error. It is optimal to average the results in the interval from 1000 to 2000.
- 25 September 2023
- Published by Kyiv National University of Construction and Architecture in Management of Development of Complex Systems
- No. 55,p. 186-191
Open AccessOpportunities to reduce random error satellite geolocation due to averagement of data received by U-BLOX NEO-6M-0-001 gps receiver with external active antenna
In our time, problems of accurate positioning of objects, equipment and cargo arise more and more often. These are the tasks of logistics and precision farming and, a separate group of tasks, positioning during earthworks in construction: pits, arrangement of pile fields, etc. If a positioning accuracy of 10 m is quite sufficient for logistics tasks, monitoring the movement of transport and cargo, then for construction tasks, an accuracy of 10 cm is required, and building monitoring tasks require a millimeter accuracy. This work is devoted to increasing the accuracy of satellite geolocation by reducing the random error of the receiver. A budget receiver with a price of about $5 was chosen for the study, from which data on the current geolocation was recorded. The data from the receiver contains a random error, which was eliminated by averaging the result. Studies have shown that with small averaging intervals, the error remains, although it decreases; as the averaging interval increases, the error decreases, however, up to a certain width of the interval; a further increase in the averaging interval ceases to affect the magnitude of the error. It is optimal to average the results in the interval from 1000 to 2000.
- Open Access
- 27 January 2023
- Published by National Academy of Sciences of Ukraine (Co. LTD Ukrinformnauka) (Publications) in Science and innovation
- Vol. 19 (1) , 99-108
Determination of Scope of Geodetic Survey During the Operation of Buildings and Structures Subject to Effects of Man-Caused Geodinamic Processes
Introduction. Forecasting the dynamics of the progressing of building deformations with the use of the data of instrumental measurements should take into account the influence of geodynamic processes and other factors of the external environment on the operational suitability of buildings. The duration of the life cycle of buildings depends on the timely consideration of the damage threats and forecasting of changes in their technical condition under the influence of natural, man-caused, constructional, and operational factors.Problem Statement. Untimely detection and elimination of defects is the cause of damage and deformation of buildings.Purpose. The purpose of this research is to forecast the progressing defects and damage by the methods of timely assessment of the technical condition of buildings, with the use of instrumental measurement data on the influence of environmental factors on the mechanism of destruction and wear of buildings during their construction and operation.Material and Methods. The methods of analysis and generalization have been used to substantiate the relevance and to formulate the purpose and objectives of the research. The retrospective method for studying the objects over time has been used to collect statistical information and analytical materials on the main parameters of their construction and operation. To forecast the parameters of instrumental measurements at the stages of the life cycle, there have been employed the following empirical research methods: survey, monitoring, generalization of experience, expert surveys, expert evaluations, and forecasting. Risks of damage have been assessed based on the materials of engineering studies, given the possibility of hazard activation, the power and remoteness of the threat source, the technical condition of buildings, and the compaction. The initial data for choosing an effective system are: the stability of the slopes where the building is located, their steepness, the condition and geological composition of the soil base, sources of possible flooding and vibrations. Results. The authors have proposed choosing an effective system of instrumental observation of landslides during the construction and operation of buildings given the vulnerability criterion. The developed method allows choosing an effective system of landslide observations, during the construction and operation of buildings, given the mentioned criterion, i.e. the property of the building to lose serviceability as a result of its possible damage under the influence of negative factors.Conclusions. The proposed method can be used to determine the scope of instrumental observations of landslides and the periodicity of landslide control during the construction in complex geodynamic conditions.
- 27 January 2023
- Published by National Academy of Sciences of Ukraine (Co. LTD Ukrinformnauka) (Publications) in Science and innovation
- Vol. 19 (1) , 99-108
Open AccessDetermination of Scope of Geodetic Survey During the Operation of Buildings and Structures Subject to Effects of Man-Caused Geodinamic Processes
Introduction. Forecasting the dynamics of the progressing of building deformations with the use of the data of instrumental measurements should take into account the influence of geodynamic processes and other factors of the external environment on the operational suitability of buildings. The duration of the life cycle of buildings depends on the timely consideration of the damage threats and forecasting of changes in their technical condition under the influence of natural, man-caused, constructional, and operational factors.Problem Statement. Untimely detection and elimination of defects is the cause of damage and deformation of buildings.Purpose. The purpose of this research is to forecast the progressing defects and damage by the methods of timely assessment of the technical condition of buildings, with the use of instrumental measurement data on the influence of environmental factors on the mechanism of destruction and wear of buildings during their construction and operation.Material and Methods. The methods of analysis and generalization have been used to substantiate the relevance and to formulate the purpose and objectives of the research. The retrospective method for studying the objects over time has been used to collect statistical information and analytical materials on the main parameters of their construction and operation. To forecast the parameters of instrumental measurements at the stages of the life cycle, there have been employed the following empirical research methods: survey, monitoring, generalization of experience, expert surveys, expert evaluations, and forecasting. Risks of damage have been assessed based on the materials of engineering studies, given the possibility of hazard activation, the power and remoteness of the threat source, the technical condition of buildings, and the compaction. The initial data for choosing an effective system are: the stability of the slopes where the building is located, their steepness, the condition and geological composition of the soil base, sources of possible flooding and vibrations. Results. The authors have proposed choosing an effective system of instrumental observation of landslides during the construction and operation of buildings given the vulnerability criterion. The developed method allows choosing an effective system of landslide observations, during the construction and operation of buildings, given the mentioned criterion, i.e. the property of the building to lose serviceability as a result of its possible damage under the influence of negative factors.Conclusions. The proposed method can be used to determine the scope of instrumental observations of landslides and the periodicity of landslide control during the construction in complex geodynamic conditions.
- Open Access
- 24 June 2021
- Published by Kyiv National University of Construction and Architecture in WAYS TO IMPROVE CONSTRUCTION EFFICIENCY
- Vol. 1 (48) , 41-49
Efficiency of methods of strengthening foundations of environmental buildings with a significed influence from the construction of the metroline line
A section of the Syretsko-Pecherska metro line is being built in Kyiv. Subway line tunnels are built in a partially open way. In the area of the picket PK-2 pit construction of the subway is an existing building on Ave. Truth 68, which is located in the zone of possible influence. The impact on the construction of surrounding buildings occurs at different stages of the existence of subway tunnels: the construction of tunnels with open pits and the stage of operation of subway tunnels with vibration during train traffic. At the stage of construction of subway tunnels, deformations of the soil base under existing buildings occur during the development of soil in the middle of the pit, which leads to uneven subsidence of buildings. The article investigates the effectiveness of methods of strengthening the foundations of the surrounding buildings with a certain impact from the construction of the subway line. To determine the most effective option of strengthening the foundations of the house in the construction of tunnels of the subway line, variable calculations were performed using different schemes of strengthening the foundations to determine the optimal ratio of labor costs to ensure strength and minimize deformation in each way. Taking into account the constructive scheme of the building, engineering and geological conditions of the construction site and technological possibilities of non-destructive reinforcement of the foundations, the following reinforcement options were considered: installation of the foundation slab; injection of reinforcing solution of the foundation base; arrangement of micropiles. Calculations of the system "pit - soil - building" were performed in the software and calculation complex "PLAXIS 2D" by the finite element method. Given that the greatest influence on the occurrence of defects in the structures of the building will give the parameter of non-uniformity of deformations, the comparison of the reinforcement efficiency was determined by this parameter. The smallest non-uniformity of deformations was provided by means of strengthening by a base plate. Compared to this method, the reinforcement of the foundation foundation injection with 89% more non-uniform deformations gave the reinforcement solution, and 296% more non-uniform deformations with micro-field reinforcement. The most effective way to strengthen the foundations of the building is to install a foundation slab with a compaction of the base with a self-expanding polymeric material.
- 24 June 2021
- Published by Kyiv National University of Construction and Architecture in WAYS TO IMPROVE CONSTRUCTION EFFICIENCY
- Vol. 1 (48) , 41-49
Open AccessEfficiency of methods of strengthening foundations of environmental buildings with a significed influence from the construction of the metroline line
A section of the Syretsko-Pecherska metro line is being built in Kyiv. Subway line tunnels are built in a partially open way. In the area of the picket PK-2 pit construction of the subway is an existing building on Ave. Truth 68, which is located in the zone of possible influence. The impact on the construction of surrounding buildings occurs at different stages of the existence of subway tunnels: the construction of tunnels with open pits and the stage of operation of subway tunnels with vibration during train traffic. At the stage of construction of subway tunnels, deformations of the soil base under existing buildings occur during the development of soil in the middle of the pit, which leads to uneven subsidence of buildings. The article investigates the effectiveness of methods of strengthening the foundations of the surrounding buildings with a certain impact from the construction of the subway line. To determine the most effective option of strengthening the foundations of the house in the construction of tunnels of the subway line, variable calculations were performed using different schemes of strengthening the foundations to determine the optimal ratio of labor costs to ensure strength and minimize deformation in each way. Taking into account the constructive scheme of the building, engineering and geological conditions of the construction site and technological possibilities of non-destructive reinforcement of the foundations, the following reinforcement options were considered: installation of the foundation slab; injection of reinforcing solution of the foundation base; arrangement of micropiles. Calculations of the system "pit - soil - building" were performed in the software and calculation complex "PLAXIS 2D" by the finite element method. Given that the greatest influence on the occurrence of defects in the structures of the building will give the parameter of non-uniformity of deformations, the comparison of the reinforcement efficiency was determined by this parameter. The smallest non-uniformity of deformations was provided by means of strengthening by a base plate. Compared to this method, the reinforcement of the foundation foundation injection with 89% more non-uniform deformations gave the reinforcement solution, and 296% more non-uniform deformations with micro-field reinforcement. The most effective way to strengthen the foundations of the building is to install a foundation slab with a compaction of the base with a self-expanding polymeric material.
- Open Access
- 24 June 2021
- Published by Kyiv National University of Construction and Architecture in WAYS TO IMPROVE CONSTRUCTION EFFICIENCY
- Vol. 1 (48) , 117-123
Measures to ensure the integrity of existing buildings and structures and monitoring the impact of new building on environmental conditions under conditions
The practice of construction in the conditions of compacted urban development shows that the construction work is likely to lead to a number of dangerous events, which are caused by additional loads on the structures of nearby facilities. The probability, nature, rate of development of undesirable processes and the degree of their danger depends on many factors that will be discussed in the article. Each building, structure or individual structure has a functional purpose, is operated under certain conditions and must meet safety requirements, ie the requirements of preventing accidents and collapses of the building as a whole or its components that may pose a danger to health and human life, or harm the environment and cause other emergencies. Significant experience has been gained in the reliability of buildings and structures in terms of determining the indicators of reliable and trouble-free operation of construction sites under normal operating conditions, ie work in the design mode. However, the vast majority of facilities in real operating conditions under the influence of various unforeseen and uncertain factors of influence, changing the design boundary conditions creates a direct risk of destruction. Monitoring is one of the main ways to prevent and make the necessary decisions in a timely manner to ensure the integrity of buildings and structures in compacted buildings in cases where new construction has a negative impact on these facilities. According to the research results, it is established that the main factors that determine the compacted conditions in the area of the pit and earthworks are the distance from the pit to the adjacent buildings and roads; soil base properties; the depth of the pit. The main reasons for the deformation of existing buildings during the new construction next to them, which is primarily the installation of ditches, is the increase in stresses in the base under the foundations of the surrounding buildings. The foundations of buildings work together with the soil base, and the development of their excessive deformations, uneven sediments and rolls leads to the destruction or further reduction of the serviceability of the responsible structural elements of the facilities in operation. The article presents the main compensatory measures for the protection of adjacent buildings during new construction.
- 24 June 2021
- Published by Kyiv National University of Construction and Architecture in WAYS TO IMPROVE CONSTRUCTION EFFICIENCY
- Vol. 1 (48) , 117-123
Open AccessMeasures to ensure the integrity of existing buildings and structures and monitoring the impact of new building on environmental conditions under conditions
The practice of construction in the conditions of compacted urban development shows that the construction work is likely to lead to a number of dangerous events, which are caused by additional loads on the structures of nearby facilities. The probability, nature, rate of development of undesirable processes and the degree of their danger depends on many factors that will be discussed in the article. Each building, structure or individual structure has a functional purpose, is operated under certain conditions and must meet safety requirements, ie the requirements of preventing accidents and collapses of the building as a whole or its components that may pose a danger to health and human life, or harm the environment and cause other emergencies. Significant experience has been gained in the reliability of buildings and structures in terms of determining the indicators of reliable and trouble-free operation of construction sites under normal operating conditions, ie work in the design mode. However, the vast majority of facilities in real operating conditions under the influence of various unforeseen and uncertain factors of influence, changing the design boundary conditions creates a direct risk of destruction. Monitoring is one of the main ways to prevent and make the necessary decisions in a timely manner to ensure the integrity of buildings and structures in compacted buildings in cases where new construction has a negative impact on these facilities. According to the research results, it is established that the main factors that determine the compacted conditions in the area of the pit and earthworks are the distance from the pit to the adjacent buildings and roads; soil base properties; the depth of the pit. The main reasons for the deformation of existing buildings during the new construction next to them, which is primarily the installation of ditches, is the increase in stresses in the base under the foundations of the surrounding buildings. The foundations of buildings work together with the soil base, and the development of their excessive deformations, uneven sediments and rolls leads to the destruction or further reduction of the serviceability of the responsible structural elements of the facilities in operation. The article presents the main compensatory measures for the protection of adjacent buildings during new construction.
- Open Access
- 16 October 2020
- Published by Kyiv National University of Construction and Architecture in WAYS TO IMPROVE CONSTRUCTION EFFICIENCY
- No. 45,p. 112-119
Methods of comparative assessment of the duration of instrumental monitoring of landslide-prone areas
To predict the dynamics of landslide processes, it is necessary to have information about the change of factors of man-made and natural influences over time. An important source of such information is instrumental and geodetic monitoring. To choose an effective method and systems of instrumental monitoring, it is necessary to compare the main organizational and technological indicators (duration and labor costs) of variants of such systems. The calculation of the duration and labor costs for measuring work when observing the deformations of landslides can be determined on the basis of existing norms of uniform time norms and prices for survey work or using the trace element method of normalization of labor processes.The article presents a brief analysis of the relationship between the norm of duration of measuring works, on the example of geometric leveling of class II to determine the deposition of deformation control points (marks), determined by the current uniform norms of time and rates for survey work and the duration of the same labor process. microelement method of rationing. The list and structure of works on performance of leveling of the II class, as set of elementary labor actions (operations) so isolated and outlined that the further division is inexpedient is defined. The microelements of the labor process are singled out and their normative duration in hours is determined, obtained on the basis of the experience of operation of measuring instruments during the performance of works on determination of deposition of deformation marks.The coefficient of interrelation between the existing current norms and the actual duration of the labor process, determined by the microelement rationing method for works on geometric leveling of the II class, which allows to distinguish the actual duration of the labor process as a norm, without taking into account the duration of preparatory on holiday. The inconsistency of the current standards of measurement work with modern methods of work, equipment, features of instrumental monitoring, monitoring in compacted buildings and other types of work creates the need to determine the elements of the relationship between existing standards and the actual duration of work in modern construction.
- 16 October 2020
- Published by Kyiv National University of Construction and Architecture in WAYS TO IMPROVE CONSTRUCTION EFFICIENCY
- No. 45,p. 112-119
Open AccessMethods of comparative assessment of the duration of instrumental monitoring of landslide-prone areas
To predict the dynamics of landslide processes, it is necessary to have information about the change of factors of man-made and natural influences over time. An important source of such information is instrumental and geodetic monitoring. To choose an effective method and systems of instrumental monitoring, it is necessary to compare the main organizational and technological indicators (duration and labor costs) of variants of such systems. The calculation of the duration and labor costs for measuring work when observing the deformations of landslides can be determined on the basis of existing norms of uniform time norms and prices for survey work or using the trace element method of normalization of labor processes.The article presents a brief analysis of the relationship between the norm of duration of measuring works, on the example of geometric leveling of class II to determine the deposition of deformation control points (marks), determined by the current uniform norms of time and rates for survey work and the duration of the same labor process. microelement method of rationing. The list and structure of works on performance of leveling of the II class, as set of elementary labor actions (operations) so isolated and outlined that the further division is inexpedient is defined. The microelements of the labor process are singled out and their normative duration in hours is determined, obtained on the basis of the experience of operation of measuring instruments during the performance of works on determination of deposition of deformation marks.The coefficient of interrelation between the existing current norms and the actual duration of the labor process, determined by the microelement rationing method for works on geometric leveling of the II class, which allows to distinguish the actual duration of the labor process as a norm, without taking into account the duration of preparatory on holiday. The inconsistency of the current standards of measurement work with modern methods of work, equipment, features of instrumental monitoring, monitoring in compacted buildings and other types of work creates the need to determine the elements of the relationship between existing standards and the actual duration of work in modern construction.