CTCheng Tang

Cheng Tang

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Cheng Tang has a total of 5 co-authors. Here are the top co-authors by number of shared publications:

  • Cheng Shen

    UCD Dooge Centre for Water Resources Research, School of Civil Engineering University College Dublin Dublin Ireland

    1 shared publication
  • Jiefu Wang

    Department of Biological Systems Engineering, Virginia Polytechnic Institute and State University, 1230 Washington St. SW, Blacksburg, VA 24060, USA

    1 shared publication
  • Ranbin Liu

    Sino-Dutch R&D Centre for Future Wastewater Treatment Technologies, Beijing University of Civil Engineering & Architecture, Beijing, 100044, PR China; Beijing Energy Conservation & Sustainable Urban and Rural Development Provincial and Ministry Co-construction Collaboration Innovation Center, Beijing University of Civil Engineering & Architecture, Beijing, 100044, PR China

    1 shared publication
  • Yan Yang

    UCD Dooge Centre for Water Resources Research, School of Civil Engineering, Newstead Building, University College Dublin, Belfield, Dublin 4, Ireland; Department of Environmental Engineering, Anhui Jianzhu University, Hefei 230601, Anhui, PR China

    1 shared publication
  • Yaqian Zhao

    Xi’an University of Technology

    1 shared publication

Latest Publications

  • Can phosphorus adsorption clog an alum sludge‐based biofiltration system? Evidence and insight

    by Yan Yang, Jiefu Wang, Yaqian Zhao, Cheng Tang, Ranbin Liu, Cheng Shen

    BACKGROUND: Aluminium‐based drinking water treatment residual (Al‐DWTR) has been used as an emergent substrate in laboratory‐scale and pilot‐scale biofiltration systems (biofilters and constructed wetlands) for its good affinity for phosphorus (P) adsorption. However, there is a concern about whether the P adsorption process will contribute to substrate clogging. Two laboratory‐scale up‐flow biofiltration systems were set up to identify the contribution of the P adsorption process to clogging under various operation conditions.RESULTS: Contributions of individual processes to clogging from biosolids production (SBS), inert matter generated from the conversion of residual biomass (SIS), P adsorption (SP) and inert matter production from influent total suspended solids (SSS) during operation of the two systems were assessed. After 262 days of operation, results indicated that SBS contributed most (53.16 ± 7.73%) to the clogging, followed by SSS (41.48 ± 8.02%), SP (3.14 ± 0.06%) and SIS (2.20 ± 0.27%) when treating the influent with concentrations of 284–558 mg L−1 for COD, 54–197 mg L−1 for SS and 5–13 mg L−1 for P.CONCLUSIONS: The minor contribution of the P adsorption process to substrate clogging further suggests that dewatered Al‐DWTR with a high P removal capacity is a promising substrate for use in biofiltration systems. © 2020 Society of Chemical Industry (SCI)