Jesus Javier Losada-Maseda
Research Subjects
Research Interests
Jesus Javier Losada-Maseda has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Almudena Filgueira-Vizoso
Universidade da Coruña
1 shared publication - Ana Garcia
Department of Naval and Industrial Engineer, Escuela Politécnica Superior, University of A Coruña, 15403 Ferrol, Spain
1 shared publication - Laura Castro-Santos
Escola Politécnica de Enxeñaría de Ferrol, Centro de Investigacións en Tecnoloxías Navais e Industriais (CITENI), Campus Industrial de Ferrol, Universidade da Coruña, 15403 Ferrol, Spain
1 shared publication - Manuel Ángel Graña-López
Department of Industrial Engineer, Escuela Universitaria Politécnica, University of A Coruña, 15405 Ferrol, Spain
1 shared publication
Latest Publications
- Open Access
- 3 September 2020
- Published by MDPI AG in Sustainability
- Vol. 12 (17) , 7232
Analysis of Contracts to Build Energy Infrastructures to Optimize the OPEX
The employer (owner) of the project wants to obtain the maximum profit for the money invested and the consultant (contractor) will try to give less for that money. The regulation of their relationship is based on the contractual agreement, which in the energy sector is mainly based on the engineering, procurement, and construction (EPC) model. The objective of this work was to evaluate which factors should be included in the drafting of contracts, to minimize problems between the parties, and thus minimize execution costs and optimize operation and maintenance costs. Information and data on the integration of operability and maintainability criteria in contracts for 158 projects, with a total contract value of close to €40,000M, were analyzed. Several of those projects corresponded to wind, solar, and hydroelectric plants. The information collected the perception of the agents involved, and was classified according to the experience of the agents consulted in the operation and maintenance areas. Finally, the proposed criteria were prioritized. In general, the owner is willing to introduce these criteria in his contracts if they reduce the operation and maintenance cost by around 1–5%, while the contractor is interested in increasing his probability to be selected by 1–3%.
- 3 September 2020
- Published by MDPI AG in Sustainability
- Vol. 12 (17) , 7232
Open AccessAnalysis of Contracts to Build Energy Infrastructures to Optimize the OPEX
The employer (owner) of the project wants to obtain the maximum profit for the money invested and the consultant (contractor) will try to give less for that money. The regulation of their relationship is based on the contractual agreement, which in the energy sector is mainly based on the engineering, procurement, and construction (EPC) model. The objective of this work was to evaluate which factors should be included in the drafting of contracts, to minimize problems between the parties, and thus minimize execution costs and optimize operation and maintenance costs. Information and data on the integration of operability and maintainability criteria in contracts for 158 projects, with a total contract value of close to €40,000M, were analyzed. Several of those projects corresponded to wind, solar, and hydroelectric plants. The information collected the perception of the agents involved, and was classified according to the experience of the agents consulted in the operation and maintenance areas. Finally, the proposed criteria were prioritized. In general, the owner is willing to introduce these criteria in his contracts if they reduce the operation and maintenance cost by around 1–5%, while the contractor is interested in increasing his probability to be selected by 1–3%.