Vu Hong Son Pham
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Vu Hong Son Pham has a total of 58 co-authors. Here are the top co-authors by number of shared publications:
- Nghiep Trinh Nguyen Dang
Ho Chi Minh City University of Technology (HCMUT)
21 shared publications - Luu Ngoc Quynh Khoi
Ho Chi Minh City University of Technology (HCMUT)
16 shared publications - Thuy Dung Dau
Ho Chi Minh City University of Technology (HCMUT)
13 shared publications - Van Nam Nguyen
Ho Chi Minh City University of Technology (HCMUT)
13 shared publications - Le Anh Tran
Ho Chi Minh City University of Technology (HCMUT)
6 shared publications - Long Le-Hoai
Vietnam National Univ. Ho Chi Minh City
4 shared publications
Latest Publications
- 1 February 2027
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 153 (2)
Low-Carbon Mass Concrete in Vietnam: A Life Cycle and Cost Analysis
This study aims to address the environmental and economic challenges of mass concrete production by evaluating the integration of industrial waste by-products, such as ground granulated blast furnace slag (GGBFS), fly ash (FA), and waste crushed sand, into 50-MPa concrete mixtures. The objective is to identify sustainable alternatives to traditional cementitious materials through life cycle assessment (LCA), cost analysis, and multicriteria evaluation. This study adopts an integrated assessment framework that jointly incorporates chilled-water energy modeling, allocation sensitivity of industrial by-products, and cost analysis within a mix-specific cradle-to-gate LCA. Three mixtures were examined, including M1 (50% GGBFS + 50% OPC), M2 (20% FA + 80% pozzolanic cement), and M3 (low-heat cement). M1 demonstrated the lowest global warming potential (280.75 kg CO 2 - eq / m 3 ) and outperformed others in eight environmental impact categories, with minimal effects on human health [4.44 × 10 −4 disability-adjusted life years (DALY)] and resources (11.9 USD2013). M2 offered strong environmental performance and the lowest cost (USD 43.5/m 3 ), achieving savings of up to USD 32,400 for 4,000 m 3 compared with M3. M3 showed the highest emissions and cost. The results affirm that using waste-derived materials can significantly reduce environmental burdens and improve the economic feasibility of mass concrete.
- 1 February 2027
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 153 (2)
Low-Carbon Mass Concrete in Vietnam: A Life Cycle and Cost Analysis
This study aims to address the environmental and economic challenges of mass concrete production by evaluating the integration of industrial waste by-products, such as ground granulated blast furnace slag (GGBFS), fly ash (FA), and waste crushed sand, into 50-MPa concrete mixtures. The objective is to identify sustainable alternatives to traditional cementitious materials through life cycle assessment (LCA), cost analysis, and multicriteria evaluation. This study adopts an integrated assessment framework that jointly incorporates chilled-water energy modeling, allocation sensitivity of industrial by-products, and cost analysis within a mix-specific cradle-to-gate LCA. Three mixtures were examined, including M1 (50% GGBFS + 50% OPC), M2 (20% FA + 80% pozzolanic cement), and M3 (low-heat cement). M1 demonstrated the lowest global warming potential (280.75 kg CO 2 - eq / m 3 ) and outperformed others in eight environmental impact categories, with minimal effects on human health [4.44 × 10 −4 disability-adjusted life years (DALY)] and resources (11.9 USD2013). M2 offered strong environmental performance and the lowest cost (USD 43.5/m 3 ), achieving savings of up to USD 32,400 for 4,000 m 3 compared with M3. M3 showed the highest emissions and cost. The results affirm that using waste-derived materials can significantly reduce environmental burdens and improve the economic feasibility of mass concrete.
- 11 September 2026
- Published by Elsevier in Journal of Building Engineering
- Vol. 131
Integrating BIM and life cycle assessment for low-carbon building design: A case study of a sustainable hotel development in Vietnam
- 11 September 2026
- Published by Elsevier in Journal of Building Engineering
- Vol. 131
Integrating BIM and life cycle assessment for low-carbon building design: A case study of a sustainable hotel development in Vietnam
- 27 January 2026
- Published by Springer Nature in Innovative Infrastructure Solutions
- Vol. 11 (2) , 102
Enhancing road infrastructure management efficiency using Yolov8 model for pavement damage detection
- 27 January 2026
- Published by Springer Nature in Innovative Infrastructure Solutions
- Vol. 11 (2) , 102
Enhancing road infrastructure management efficiency using Yolov8 model for pavement damage detection
- Open Access
- 1 January 2026
- Published by Wiley in Applied Computational Intelligence and Soft Computing
- Vol. 2026 (1)
Development of a Bayesian Network–Based Integrated Model for Opening‐Related Fall Risk Assessment in Construction
Opening‐related falls remain a critical safety concern in construction, particularly around floor openings and elevator shafts where risk is jointly influenced by opening configurations, protective conditions, worker proximity, and unsafe behaviors. However, existing assessment approaches often evaluate these factors statically and have limited capability to connect design stage opening hazards with evolving worker conditions during construction. This study proposes an integrated probabilistic framework combining building information modeling (BIM), Bayesian networks (BNs), dynamic Bayesian networks (DBNs), and computer vision (CV) for dynamic assessment of opening‐related fall risk across the design and construction phases. At the design stage, opening geometry, type, edge protection, and worker‐to‐opening distance derived from 2D BIM are integrated with expert elicited probabilities in a static BN to quantify inherent fall risk. This design stage risk is subsequently transferred to a DBN as baseline information, while CV‐derived worker observations are incorporated as temporal evidence to update fall risk probabilities during construction. Three complementary case studies are presented: (1) static BN assessment of inherent risk associated with building openings; (2) controlled evaluation of temporal risk evolution near an opening; and (3) field‐based assessment using construction site observations. The field application further compares DBN predictions with static BN and expert rule‐based assessments. CV‐derived width‐to‐height ratios showed close agreement with manual measurements (MAE = 0.0152, RMSE = 0.0167, MAPE = 3.744%, and R 2 = 0.9927). The results demonstrate that the proposed framework links persistent opening‐related hazards with changing worker states and captures the temporal evolution of fall risk through sequential probabilistic updating. This framework provides a risk‐based foundation for proactive monitoring and decision making to enhance safety during work near hazardous openings in construction.
- 1 January 2026
- Published by Wiley in Applied Computational Intelligence and Soft Computing
- Vol. 2026 (1)
Open AccessDevelopment of a Bayesian Network–Based Integrated Model for Opening‐Related Fall Risk Assessment in Construction
Opening‐related falls remain a critical safety concern in construction, particularly around floor openings and elevator shafts where risk is jointly influenced by opening configurations, protective conditions, worker proximity, and unsafe behaviors. However, existing assessment approaches often evaluate these factors statically and have limited capability to connect design stage opening hazards with evolving worker conditions during construction. This study proposes an integrated probabilistic framework combining building information modeling (BIM), Bayesian networks (BNs), dynamic Bayesian networks (DBNs), and computer vision (CV) for dynamic assessment of opening‐related fall risk across the design and construction phases. At the design stage, opening geometry, type, edge protection, and worker‐to‐opening distance derived from 2D BIM are integrated with expert elicited probabilities in a static BN to quantify inherent fall risk. This design stage risk is subsequently transferred to a DBN as baseline information, while CV‐derived worker observations are incorporated as temporal evidence to update fall risk probabilities during construction. Three complementary case studies are presented: (1) static BN assessment of inherent risk associated with building openings; (2) controlled evaluation of temporal risk evolution near an opening; and (3) field‐based assessment using construction site observations. The field application further compares DBN predictions with static BN and expert rule‐based assessments. CV‐derived width‐to‐height ratios showed close agreement with manual measurements (MAE = 0.0152, RMSE = 0.0167, MAPE = 3.744%, and R 2 = 0.9927). The results demonstrate that the proposed framework links persistent opening‐related hazards with changing worker states and captures the temporal evolution of fall risk through sequential probabilistic updating. This framework provides a risk‐based foundation for proactive monitoring and decision making to enhance safety during work near hazardous openings in construction.
- Open Access
- 1 January 2026
- Published by Wiley in Applied Computational Intelligence and Soft Computing
- Vol. 2026 (1)
Enhancing Construction Shift Schedules With the Sand Cat Arithmetic Optimization Algorithm
This paper addresses shift scheduling to optimize time and cost while considering the impact of night shifts. It involves determining work shift options, sequencing project tasks, and taking labor constraints into account to provide options that optimize time‐cost trade‐off (TCTO), and the number of night shift hours, or can be called as the time‐cost–utilization work shift trade‐off (TCUT) problem. The approach involves the use of a hybrid sand cat arithmetic optimization algorithm (AOA) (SC‐AOA), which integrates sand cat swarm optimization (SCSO) and AOA. This method balances exploration and exploitation phases effectively, improving convergence accuracy and avoiding local optima. The SC‐AOA model is validated through case studies, demonstrating superior performance in optimizing TCUT compared to previous algorithms. Results from experiments on two specific case studies indicated that the SC‐AOA efficiently utilized factors during the search and exploitation processes, while also flexibly adjusting to achieve optimal results. This confirms that SC‐AOA is a powerful and efficient tool in construction project management. The paper’s approach addresses the critical TCUT problem in construction management, providing a more efficient and flexible scheduling solution. Its validation through real‐world case studies highlights its practical applicability and potential to significantly improve construction project outcomes.
- 1 January 2026
- Published by Wiley in Applied Computational Intelligence and Soft Computing
- Vol. 2026 (1)
Open AccessEnhancing Construction Shift Schedules With the Sand Cat Arithmetic Optimization Algorithm
This paper addresses shift scheduling to optimize time and cost while considering the impact of night shifts. It involves determining work shift options, sequencing project tasks, and taking labor constraints into account to provide options that optimize time‐cost trade‐off (TCTO), and the number of night shift hours, or can be called as the time‐cost–utilization work shift trade‐off (TCUT) problem. The approach involves the use of a hybrid sand cat arithmetic optimization algorithm (AOA) (SC‐AOA), which integrates sand cat swarm optimization (SCSO) and AOA. This method balances exploration and exploitation phases effectively, improving convergence accuracy and avoiding local optima. The SC‐AOA model is validated through case studies, demonstrating superior performance in optimizing TCUT compared to previous algorithms. Results from experiments on two specific case studies indicated that the SC‐AOA efficiently utilized factors during the search and exploitation processes, while also flexibly adjusting to achieve optimal results. This confirms that SC‐AOA is a powerful and efficient tool in construction project management. The paper’s approach addresses the critical TCUT problem in construction management, providing a more efficient and flexible scheduling solution. Its validation through real‐world case studies highlights its practical applicability and potential to significantly improve construction project outcomes.
- 29 December 2025
- Published by Springer Nature in Cluster Computing
- Vol. 29 (1) , 63
Multi-project scheduling optimization with artificial intelligence: a novel metaheuristic framework
- 29 December 2025
- Published by Springer Nature in Cluster Computing
- Vol. 29 (1) , 63
Multi-project scheduling optimization with artificial intelligence: a novel metaheuristic framework
- 20 November 2025
- Published by Springer Nature
- p. 655-662
Application of Artificial Intelligence for Detecting Worker Safety Harness Usage During Work at Height to Enhance Safety Risk Management
- 20 November 2025
- Published by Springer Nature
- p. 655-662
Application of Artificial Intelligence for Detecting Worker Safety Harness Usage During Work at Height to Enhance Safety Risk Management
- 20 November 2025
- Published by Springer Nature
- p. 185-192
Truss Structure Optimization Using the Portia Spider Algorithm: A Bio-inspired Approach
- 20 November 2025
- Published by Springer Nature
- p. 185-192
Truss Structure Optimization Using the Portia Spider Algorithm: A Bio-inspired Approach
- 20 November 2025
- Published by Springer Nature
- p. 663-668
An Assessment of Critical Success Factors for Mitigating Cost Overruns in Public Infrastructure Construction
- 20 November 2025
- Published by Springer Nature
- p. 663-668
An Assessment of Critical Success Factors for Mitigating Cost Overruns in Public Infrastructure Construction
- 20 November 2025
- Published by Springer Nature
- p. 431-438
Microgrid Energy Management with the Sand Cat Swarm Optimization
- 20 November 2025
- Published by Springer Nature
- p. 431-438
Microgrid Energy Management with the Sand Cat Swarm Optimization