Le Anh Tran
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Le Anh Tran has a total of 12 co-authors. Here are the top co-authors by number of shared publications:
- Vu Hong Son Pham
Faculty of Civil Engineering, Ho Chi Minh City University of Technology (HCMUT), Ho Chi Minh City, Vietnam
6 shared publications - Thuy Dung Dau
Ho Chi Minh City University of Technology (HCMUT)
4 shared publications Vu Hong Son Pham
Ho Chi Minh City University of Technology (HCMUT)
4 shared publicationsThuy Dung Dau
Ho Chi Minh City University of Technology (HCMUT)
3 shared publications- Bui Dang Khoa
Ho Chi Minh City University of Technology (HCMUT)
1 shared publication Dang Khoa Bui
Ho Chi Minh City University of Technology (HCMUT)
1 shared publication
Latest Publications
- 2 September 2026
- Published by Springer Nature
- p. 721-731
An Integrated Framework of BIM and Dynamic Bayesian Networks for Safety Risk Management on Construction Site
- 2 September 2026
- Published by Springer Nature
- p. 721-731
An Integrated Framework of BIM and Dynamic Bayesian Networks for Safety Risk Management on Construction Site
- Open Access
- 1 January 2026
- Published by Wiley in Applied Computational Intelligence and Soft Computing
- Vol. 2026 (1)
Development of a Bayesian Network–Based Integrated Model for Opening‐Related Fall Risk Assessment in Construction
Opening‐related falls remain a critical safety concern in construction, particularly around floor openings and elevator shafts where risk is jointly influenced by opening configurations, protective conditions, worker proximity, and unsafe behaviors. However, existing assessment approaches often evaluate these factors statically and have limited capability to connect design stage opening hazards with evolving worker conditions during construction. This study proposes an integrated probabilistic framework combining building information modeling (BIM), Bayesian networks (BNs), dynamic Bayesian networks (DBNs), and computer vision (CV) for dynamic assessment of opening‐related fall risk across the design and construction phases. At the design stage, opening geometry, type, edge protection, and worker‐to‐opening distance derived from 2D BIM are integrated with expert elicited probabilities in a static BN to quantify inherent fall risk. This design stage risk is subsequently transferred to a DBN as baseline information, while CV‐derived worker observations are incorporated as temporal evidence to update fall risk probabilities during construction. Three complementary case studies are presented: (1) static BN assessment of inherent risk associated with building openings; (2) controlled evaluation of temporal risk evolution near an opening; and (3) field‐based assessment using construction site observations. The field application further compares DBN predictions with static BN and expert rule‐based assessments. CV‐derived width‐to‐height ratios showed close agreement with manual measurements (MAE = 0.0152, RMSE = 0.0167, MAPE = 3.744%, and R 2 = 0.9927). The results demonstrate that the proposed framework links persistent opening‐related hazards with changing worker states and captures the temporal evolution of fall risk through sequential probabilistic updating. This framework provides a risk‐based foundation for proactive monitoring and decision making to enhance safety during work near hazardous openings in construction.
- 1 January 2026
- Published by Wiley in Applied Computational Intelligence and Soft Computing
- Vol. 2026 (1)
Open AccessDevelopment of a Bayesian Network–Based Integrated Model for Opening‐Related Fall Risk Assessment in Construction
Opening‐related falls remain a critical safety concern in construction, particularly around floor openings and elevator shafts where risk is jointly influenced by opening configurations, protective conditions, worker proximity, and unsafe behaviors. However, existing assessment approaches often evaluate these factors statically and have limited capability to connect design stage opening hazards with evolving worker conditions during construction. This study proposes an integrated probabilistic framework combining building information modeling (BIM), Bayesian networks (BNs), dynamic Bayesian networks (DBNs), and computer vision (CV) for dynamic assessment of opening‐related fall risk across the design and construction phases. At the design stage, opening geometry, type, edge protection, and worker‐to‐opening distance derived from 2D BIM are integrated with expert elicited probabilities in a static BN to quantify inherent fall risk. This design stage risk is subsequently transferred to a DBN as baseline information, while CV‐derived worker observations are incorporated as temporal evidence to update fall risk probabilities during construction. Three complementary case studies are presented: (1) static BN assessment of inherent risk associated with building openings; (2) controlled evaluation of temporal risk evolution near an opening; and (3) field‐based assessment using construction site observations. The field application further compares DBN predictions with static BN and expert rule‐based assessments. CV‐derived width‐to‐height ratios showed close agreement with manual measurements (MAE = 0.0152, RMSE = 0.0167, MAPE = 3.744%, and R 2 = 0.9927). The results demonstrate that the proposed framework links persistent opening‐related hazards with changing worker states and captures the temporal evolution of fall risk through sequential probabilistic updating. This framework provides a risk‐based foundation for proactive monitoring and decision making to enhance safety during work near hazardous openings in construction.
- 20 November 2025
- Published by Springer Nature
- p. 655-662
Application of Artificial Intelligence for Detecting Worker Safety Harness Usage During Work at Height to Enhance Safety Risk Management
- 20 November 2025
- Published by Springer Nature
- p. 655-662
Application of Artificial Intelligence for Detecting Worker Safety Harness Usage During Work at Height to Enhance Safety Risk Management
- 20 November 2025
- Published by Springer Nature
- p. 663-668
An Assessment of Critical Success Factors for Mitigating Cost Overruns in Public Infrastructure Construction
- 20 November 2025
- Published by Springer Nature
- p. 663-668
An Assessment of Critical Success Factors for Mitigating Cost Overruns in Public Infrastructure Construction
- 12 May 2025
- Published by Springer Nature
- p. 189-198
An Integrated BIM-Based Framework for Enhancing Safety Risk Management in Fall Prevention
- 12 May 2025
- Published by Springer Nature
- p. 189-198
An Integrated BIM-Based Framework for Enhancing Safety Risk Management in Fall Prevention
- 12 May 2025
- Published by Springer Nature
- p. 212-221
Artificial Intelligence in Construction Safety Risk Management: A Comprehensive Review and Future Research Perspectives
- 12 May 2025
- Published by Springer Nature
- p. 212-221
Artificial Intelligence in Construction Safety Risk Management: A Comprehensive Review and Future Research Perspectives
- 1 January 2025
- Published by American Institute of Mathematical Sciences (AIMS) in Journal of Industrial and Management Optimization
- Vol. 21 (1) , 676-699
Multi-criteria decision analysis of shuttering material utilization in tall building construction based on a hybrid approach of best worst method and topsis
The choosing of shuttering significantly influences the time performance and cost-effectiveness of reinforced concrete structures due to the continuous nature of shuttering operations throughout the construction process. It can also be viewed as a MCDM problem, wherein a variety of alternatives are assessed based on multiple criteria. In this research, a hybrid methodology combining the BWM and TOPSIS model was employed to evaluate the utilization of shuttering materials in tall building construction. The BWM was utilized to establish the weighting matrix between decision making criteria derived from the preceding Exploratory Factor Analysis stage and the alternatives within the analytical framework. Furthermore, the TOPSIS method was utilized to rank these alternatives. To validate the applicability of the suggested methodology, a case study was conducted to determine the preferred shuttering material among three types of timber, mivan, and plastic within the context of construction in Vietnam, and the results were discussed. The study identified plastic shuttering as the optimal solution based on expert evaluations. These findings are intended to enhance managerial understanding of shuttering systems, advocating for the integration of decision support tools in tall construction projects to improve planning precision and overall project success.
- 1 January 2025
- Published by American Institute of Mathematical Sciences (AIMS) in Journal of Industrial and Management Optimization
- Vol. 21 (1) , 676-699
Multi-criteria decision analysis of shuttering material utilization in tall building construction based on a hybrid approach of best worst method and topsis
The choosing of shuttering significantly influences the time performance and cost-effectiveness of reinforced concrete structures due to the continuous nature of shuttering operations throughout the construction process. It can also be viewed as a MCDM problem, wherein a variety of alternatives are assessed based on multiple criteria. In this research, a hybrid methodology combining the BWM and TOPSIS model was employed to evaluate the utilization of shuttering materials in tall building construction. The BWM was utilized to establish the weighting matrix between decision making criteria derived from the preceding Exploratory Factor Analysis stage and the alternatives within the analytical framework. Furthermore, the TOPSIS method was utilized to rank these alternatives. To validate the applicability of the suggested methodology, a case study was conducted to determine the preferred shuttering material among three types of timber, mivan, and plastic within the context of construction in Vietnam, and the results were discussed. The study identified plastic shuttering as the optimal solution based on expert evaluations. These findings are intended to enhance managerial understanding of shuttering systems, advocating for the integration of decision support tools in tall construction projects to improve planning precision and overall project success.